7828
Comment:
|
8806
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
## page was renamed from Continuum/NIKA/Main ## page was renamed from NIKA/Main |
|
Line 26: | Line 28: |
* Go to the NIKA [[http://www.iram.es/IRAMES/mainWiki/Continuum/NIKA/WishList | wish list]]. | |
Line 43: | Line 44: |
* [[attachment:1stNIKApool.pdf | Summary of the 1st NIKA pool (February 2014, in prep.)]]. | |
Line 101: | Line 103: |
== 1st NIKA pool (February 2014) == | ## == 2nd NIKA pool (November/December 2014) == |
Line 103: | Line 105: |
The 1st NIKA pool will take place from the 18th of February to the 28th of February 2014. | ## The 2nd NIKA open pool will take place from the 18th of October to the 2nd of December 2014. |
Line 105: | Line 107: |
=== Pool projects and observers === | ## === Pool projects and observers === |
Line 107: | Line 109: |
For information about the accepted projects and the observers at the 30m please go to: | ## For information about the accepted projects and the observers at the 30m please go to: |
Line 109: | Line 111: |
* [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolOrganization/1stNIKApool | 1st NIKA pool organization.]] | ## * [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolOrganization/2ndNIKApool | 2nd NIKA pool organization.]] |
Line 111: | Line 113: |
* [[http://www.iram.es/IRAMES/mainWiki/PoolW13 | IRAM 30m pool observers for the Winter 2013 semester.]] | ## === Progress === |
Line 113: | Line 115: |
* [[http://www.iram.es/IRAMES/mainWiki/NikaRun8 | Internal NIKA team page for organisation]] | ## The progress of the pool can be followed via: |
Line 115: | Line 117: |
## * [[https://pools.iram.es | Pool data base]] | |
Line 116: | Line 119: |
=== Progress === | ## * [[https://tapas.iram.es/tapas/ | TAPAS]] |
Line 118: | Line 121: |
The progress of the pool can be followed via: * [[https://pools.iram.es | Pool data base]] * [[https://tapas.iram.es/tapas/ | TAPAS]] Both databases are synchronized and can be used to write/read the logsheet. |
## Both databases are synchronized and can be used to write/read the logsheet. |
Line 128: | Line 125: |
== Previous test and commissioning runs == | == Technical runs == * '''9th test run''' (October 2014) * [[NikaRun9 | Go to the 9th run Wiki page]] * '''May 2014 Dry run''' * Two slots of 4 hours have been scheduled for the NIKA dry run: Wed 7th May 2014 from 11:00 to 15:00 (LT), Mon 12th May 2014 from 12:00 to 16:00 (LT) See the [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolOrganization/DryRunNIKA | NIKA dry run]] organization wiki. * '''1st NIKA pool''' (February 2014) * [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolOrganization/1stNIKApool | 1st NIKA pool organization]] * [[http://www.iram.es/IRAMES/mainWiki/PoolW13 | IRAM 30m pool observers for the Winter 2013 semester]] * [[http://www.iram.es/IRAMES/mainWiki/NikaRun8 | Internal NIKA team page for organisation]] |
Line 139: | Line 146: |
* '''4th test run''' (June 2012) | * '''4th test run''' (June 2012, final position, final cryostat) |
Line 142: | Line 149: |
* '''3rd test run''' (October 2011) | * '''3rd test run''' (October 2011, cryogen free 1^st^ cold stage cryostat) |
Line 145: | Line 152: |
* '''2nd test run''' (October 2010) | * '''2nd test run''' (October 2010, dual band cryostat) |
Line 148: | Line 155: |
* '''1st test run''' (October 2009) | * '''1st test run''' (October 2009, 1 band cryostat on MAMBO bench, liquid He 1^st^ cold stage) |
Line 157: | Line 164: |
Created: 2013.12.16 | Created: 2013.Dec.16 |
Line 161: | Line 168: |
Last update: 2014.02.17 | Last update: 2014.Mar.17 |
NIKA
The New IRAM KIDs Array (NIKA) is a Kinetic Inductance Detectors camera for bolometric observations at the IRAM 30m telescope. NIKA has been built by the Institut Néel (IN) and LPSC in Grenoble, France under the lead of Alain Benoit, and with the contributions of other persons forming the NIKA collaboration. In 2013 the main contributing institutes are IN, IRAM, IPAG, LPSC, AIG Cardiff.
Contents
Overview
NIKA is a dual band instrument using few hundreds of Kinetic Inductance Detectors (KID). The KID resonances variations which are dependent on the incoming power are probed by a comb of tones allowing to perform frequency domain multiplexing. Being a prototype in constant evolution the arrays characteristics (number of pixels, field of view, sensitivity, etc.) have evolved over the years from each test run to the other. The main characteristics of the latest configuration are summarized on the following table.
last update: 17-Feb-2014 |
Number of KIDs |
Wavelength |
Bandwidth (FWHM) |
NEFD |
HPBW |
FoV |
Spacing |
NIKA 1mm band |
196 (136 valid) |
1.25 mm |
220-270 GHz |
35 mJy*s1/2 (preliminary) |
12.0" |
1.8' |
6.8" |
NIKA 2mm band |
128 (114 valid) |
2.00 mm |
137-172 GHz |
14 mJy*s1/2 (preliminary) |
17.5" |
2.0' |
9.6" |
- Number of KIDs = number of KIDs which resonance is probed with a tone generated by the electronics (in parenthesis = conservative number of KIDs for which no problem has been found in the data). Physically there's 224 KIDs on the 1mm array and 132 KIDs on the 2mm array.
- NEFD = Noise equivalent flux density outside of the atmosphere = sensitivity.
- HPBW = Half power beam width = angular resolution.
- FoV = effective Field-of-View calculated from area covered by all pixels.
NIKA is a prototype used to test the technologies to be used in the bigger 6.5' FOV NIKA2 instrument currently in development phase (private Wiki here).
Go to the NIKA wish list.
Call for proposals
NIKA is offered for the first time to the community the winter semester 2013/14:
Reports and Publications
- Reports:
- Refereed papers:
Performance and calibration of the NIKA camera at the IRAM 30 m telescope (Catalano et al. 2014, arXiv)
First observation of the thermal Sunyaev-Zel'dovich effect with Kinetic Inductance Detectors (Adam et al. 2013, arXiv)
Improved mm-wave photometry for kinetic inductance detectors (Calvo et al. 2013, A&A)
NIKEL: Electronics and data acquisition for kilopixels kinetic inductance camera (O. Bourrion et al. 2012, arXiv)
A Dual-band Millimeter-wave Kinetic Inductance Camera for the IRAM 30 m Telescope (Monfardini et al. 2011, ApJS)
NIKA: A millimeter-wave kinetic inductance camera (Monfardini et al. 2010, A&A)
Support teams
- Overall coordinator:
Samuel Leclercq (IRAM/Grenoble, <leclercq@iram.fr>)
- NIKA team:
Alain Benoit <alain.benoit@grenoble.cnrs.fr> (PI, IN)
Alessandro Monfardini <monfardini@grenoble.cnrs.fr> (co-PI, IN)
François-Xavier Désert <francois-xavier.desert@obs.ujf-grenoble.fr> (IPAG)
Martino Calvo <martino.calvo@grenoble.cnrs.fr> (IN)
Antonio D'Addabbo <antonio.d-addabbo@grenoble.cnrs.fr> (IN)
- Nicolas Ponthieu (IPAG)
Juan Macias-Perez <macias@lpsc.in2p3.fr> (LPSC)
Andrea Catalano <catalano@lpsc.in2p3.fr> (LPSC)
Remi Adam <adam@lpsc.in2p3.fr> (LPSC)
- IRAM/Granada support team:
Carsten Kramer (station manager, <kramer@iram.es>)
Israel Hermelo (continuum pool manager, <hermelo@iram.es>)
Manuel Gonzalez (heterodyne pool manager, <gonzalez@iram.es>)
Nicolas Billot (30m scheduler, <billot@iram.es>)
Albrecht Sievers (<sievers@iram.es>)
- Robert Zylka
- Walter Brunswig
How-to's
Pool Preparation provides information on the observing modes offered for the continuum cameras as well as examples of the scripts that you need to prepare to observe your project.
Observing Session provides an example of a typical session with the continuum cameras at the 30m telescope.
Pointing sources and calibrators provides a list of pointing sources and calibrators for the IRAM 30m continuum cameras.
For observers: Check the staus of NIKA during the observations.
For Experts: Alignment and pointing sesion (in prep.) provides a step-by-step procedure to implement a new pointing model with NIKA
Data Reduction Quick look analysis and Offline processing products.
Technical runs
9th test run (October 2014)
May 2014 Dry run
- Two slots of 4 hours have been scheduled for the NIKA dry run: Wed 7th May 2014 from 11:00 to 15:00 (LT), Mon 12th May 2014 from 12:00 to 16:00 (LT)
See the NIKA dry run organization wiki.
1st NIKA pool (February 2014)
7th test run (January 2014)
6th test run (June 2013)
5th test run (November 2012)
4th test run (June 2012, final position, final cryostat)
3rd test run (October 2011, cryogen free 1st cold stage cryostat)
2nd test run (October 2010, dual band cryostat)
1st test run (October 2009, 1 band cryostat on MAMBO bench, liquid He 1st cold stage)
Author: Israel Hermelo (IRAM 30m continuum pool manager)
email: hermelo@iram.es
Created: 2013.Dec.16
This page is maintained by IH, CK, SL and the NIKA team
Last update: 2014.Mar.17