Differences between revisions 1 and 2
Revision 1 as of 2013-12-16 13:57:35
Size: 6308
Editor: 62-151-80-146
Comment:
Revision 2 as of 2013-12-16 14:30:29
Size: 6296
Editor: 62-151-80-146
Comment:
Deletions are marked like this. Additions are marked like this.
Line 110: Line 110:
 * '''3rd GISMO pool''' (April 2013)  * '''7th test run''' (January 2014)
  * [[NikaRun7 | Go to the 7th run Wiki page]]
Line 112: Line 113:
  * [[http://www.iram.fr/php/rel_sched/bgfiles/13/Bolopool-w12.html | List of accepted projects.]]  * '''6th test run''' (June 201)
  * [[NikaRun6|Go to the 6th run Wiki page]]
Line 114: Line 116:
  * [[http://www.iram.es/IRAMES/mainWiki/PoolW12 |Pool observers for the April 2013 run]]  * '''5th test run''' (November 2012)
  * [[NikaRun5|Go to the 5th run Wiki page]]

 * '''4th test run''' (June 2012)
  * [[NikaRun4|Go to the 4th run Wiki page]]

 * '''3rd test run''' (October 2011)
  * [[NikaRun3|Go to the 3rd run Wiki page]]

 * '''2nd test run''' (October 2010)
  * [[NikaRun2|Go to the 2nd run Wiki page]]

 * '''1st test run''' (October 2009)
  * [[NikaRun1|Go to the 1st run Wiki page]]
Line 117: Line 132:
 * '''2nd GISMO pool''' (November 2012) == Procedure for cooling down the PT NIKA cryostat ==
Line 119: Line 134:
  * [[http://www.iram.fr/php/rel_sched/bgfiles/12/bolopool-S12.html | List of accepted projects.]]

  * [[http://www.iram.es/IRAMES/mainWiki/PoolS12 |Pool observers for the November 2012 run]]
[[CoolingPTcryostatNIKA|See page dedicated to this procedure]]
Line 124: Line 137:
 * '''1st GISMO pool''' (April 2012)
 
  * [[http://www.iram.fr/php/rel_sched/bgfiles/12/bolopool-W11.html | List of accepted projects.]]
----
Line 128: Line 139:
== NIKA2 ==
Line 129: Line 141:
 * '''5th alignment run''' (March 2012)
  
  * [[GismoRun5|Go to the 5th run Wiki page]]
NIKA1 is a 2.3' FOV prototype used to test the technologies to be used in the bigger 6.5' FOV NIKA2 instrument currently in development phase.
Line 133: Line 143:
 * '''4th test run''' (April 2011) [[http://ipag.osug.fr/nika2/Welcome.html | NIKA2 main web page]]
Line 135: Line 145:
  * [[GismoRun4|Go to the 4th run Wiki page]] [[http://www.iram.fr/wiki/nika2/index.php/Nika2Wiki | NIKA2 development dedicated (private Wiki)]]
Line 137: Line 147:
 * '''3rd test run''' (April 2010)

   * [[GismoRun3|Go to the 3rd run Wiki page]]

 * '''2nd test run''' (October 2008)

  * [[GismoRun2|Go to the 2nd run Wiki page]]

 * '''1st test run''' (November 2007)

  * [[GismoRun1|Go to the 1st run Wiki page]]
Line 155: Line 154:
Created: 2013.10.25 Created: 2013.12.16
Line 157: Line 156:
This page is maintained by IH, CK, SL and the GISMO team This page is maintained by IH, CK, SL and the NIKA team
Line 159: Line 158:
Last update: 2013.11.02 Last update: 2013.12.16

NIKA

The New IRAM KIDs Array (NIKA) is a Kinetic Inductance Detectors camera for bolometric observations at the IRAM 30m telescope. NIKA has been built by the Institut Néel (IN), in Grenoble, France under the lead of Alain Benoit, and with the contributions of other persons forming the NIKA collaboration. In 2013 the main contributing institutes are IN, IRAM, IPAG, LPSC, AIG Cardiff.


Overview

NIKA is a dual band instrument using few hundreds of Kinetic Inductance Detectors (KID). The KID resonances variations which are dependent on the incoming power are probed by a comb of tones allowing to perform frequency domain multiplexing. Being a prototype in constant evolution the arrays characteristics (number of pixels, field of view, sensitivity, etc.) have evolved over the years from each test run to the other. The main characteristics of the latest configuration are summarized on the following table.

Pixels

Wavelength

Bandwidth (FWHM)

Sensitivity (out of atmosphere)

HPBW

Field-of-View

Spacing

NIKA1 run 6

132 (125 valid)

2.00 mm

137-172 GHz

14 mJy*s1/2 (preliminary)

17.5"

2.3' diameter

9.8"

NIKA1 run 6

224 (190 valid)

1.25 mm

220-270 GHz

35 mJy*s1/2 (preliminary)

12.0"

2.3' diameter

6.8"


Call for proposals

NIKA is offered for the first time to the community the winter semester 2013/14:


Publications


Support teams


NIKA How-to's


1st NIKA pool (February 2014)

The 1st NIKA pool pool will take place from the 18th of February to the 28th of February 2014. Observations will be carried from a dedicated pool account (I. Hermelo will provide login information).

Pool projects and observers

For information about the accepted projects and the observers at the 30m please go to:

Progress

The progress of the 4th GISMO pool can be followed via:


Previous observing runs

Procedure for cooling down the PT NIKA cryostat

See page dedicated to this procedure


NIKA2

NIKA1 is a 2.3' FOV prototype used to test the technologies to be used in the bigger 6.5' FOV NIKA2 instrument currently in development phase.

NIKA2 main web page

NIKA2 development dedicated (private Wiki)


Author: Israel Hermelo (GISMO pool manager)

email: hermelo@iram.es

Created: 2013.12.16

This page is maintained by IH, CK, SL and the NIKA team

Last update: 2013.12.16

NIKA/Main (last edited 2017-02-24 18:57:16 by NikaBolometer)