Differences between revisions 3 and 7 (spanning 4 versions)
Revision 3 as of 2019-07-03 15:34:50
Size: 2168
Comment:
Revision 7 as of 2019-07-04 09:53:19
Size: 1359
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= NIKA2 technical run 32 / 17-24 September 2019 = = NIKA2 technical run #32 / 17-24 September 2019 =
Line 7: Line 7:
- Continue commissioning of the new acquisition software (DAQ v3), after June's fix on tuning and few other "minor" things. === 1) Sep 6 preparation before the Sep 17-24 test run ===
Line 9: Line 9:
- New sweep to define new tones comb parameter (closed window + open on good sky if possible). Before the test run, it is necessary to prepare the DAQ v3 and the read-data library for the new tests, i.e. some issues need to be fixed before starting.
Line 11: Line 11:
- Use the external calibrator: tests scans on/off, then rest of the run on (if no deterioration of data: from now on always use it). The main issue is the error in the transfer of a tuning variable between two modules of the DAQ code (see Alain's explanations at the NIKA2 joint meeting, May 28th, 2019).
Line 13: Line 13:
- Continue polarization commissioning (help of calibrator for leakage and so on / synchronization / calibration). Time jumps have been solved at the level of the read-data library and the new version needs to be "activated", i.e. copied where in the running version used by the make-imbf scripts.
Line 15: Line 15:
- Scans - mainly beam maps - in total power & polar to acquire statistics for DAQ v3 commissioning. If needed, short time slots might be allocated for DAQ verification purposes before the run, possibly during the IRAM school week (contact Carsten/Stefano/Samuel/etc for details).
Line 17: Line 17:
- Possible tests on tuning parameters. === 2) Summer school ===

Students will use NIKA2 on a science case target, acquire data and reduce it; see the [[https://www.iram-institute.org/EN/content-page-402-7-67-402-0-0.html| Summer school presentation page]] for more information.
Line 22: Line 24:
 * [[http://www.iram.fr/IRAMFR/PV/sche/19/s38v1.html|Telescope Schedule]] <<BR>>  * [[http://www.iram.fr/IRAMFR/PV/sche/19/s36v1.html|Telescope Schedule]] <<BR>>
Line 25: Line 27:
All the people who will participate to the pool run must appear in the table below; each one must inform Samuel and contact Laura to reserve rooms in Granada and at the telescope. For those who travel on IRAM funds, contact Samuel; see also the [[http://www.iram.fr/wiki/nika2/index.php/Travel_rules|NIKA2 travel rules]].

Staff of the run in September 2019: table of the nights spent at the observatory for the NIKA2 collaboration members participating to the run (T = Tuesday, S = Saturday, 1 = night scheduled at the telescope, g = night in Granada office). <<BR>>

||<rowbgcolor="#e5dd55"> People\Date ||13||14||15||16||T17|| 18|| 19|| 20|| 21|| 22|| 23||T24||
|| ||
||<rowbgcolor="#ddccff"> Samuel Leclercq || 0|| 0|| 0||g || 1 || 1 || 1 || 1 || 1 || 1 || 1 || 0 ||
||<rowbgcolor="#ddcc55"> People || 0|| 0|| 0|| 0|| || || || || || || || 0 ||
||<rowbgcolor="#ddcc55"> Rooms at obs. || 0|| 0|| 0|| 0|| || || || || || || || 0 ||
|| ||
||<rowbgcolor="#ddccff"> Alessia Ritacco || || || || || 1 || 1 || || || || || || 0 ||
(*) For the rooms, count persons from the NIKA collaboration and Grenoble, but not from IRAM Granada.

IRAM's [[http://www.iram.es/IRAMES/mainWiki/AstronomersOnDutySchedule]].
No Observer table for this special run; organization in the hands of the Summer school organizers.

NIKA2 technical run #32 / 17-24 September 2019

Back to the NIKA2 Run 32 main page

Goals

1) Sep 6 preparation before the Sep 17-24 test run

Before the test run, it is necessary to prepare the DAQ v3 and the read-data library for the new tests, i.e. some issues need to be fixed before starting.

The main issue is the error in the transfer of a tuning variable between two modules of the DAQ code (see Alain's explanations at the NIKA2 joint meeting, May 28th, 2019).

Time jumps have been solved at the level of the read-data library and the new version needs to be "activated", i.e. copied where in the running version used by the make-imbf scripts.

If needed, short time slots might be allocated for DAQ verification purposes before the run, possibly during the IRAM school week (contact Carsten/Stefano/Samuel/etc for details).

2) Summer school

Students will use NIKA2 on a science case target, acquire data and reduce it; see the Summer school presentation page for more information.

Observers and Schedule

No Observer table for this special run; organization in the hands of the Summer school organizers.