NIKA2 run #3 January 2016

Back to the NIKA2 run 3 page

Goals of the run

The detailled characterization plan established for run 1 is still valid, and ongoing: http://www.iram.fr/wiki/nika2/index.php/NIKA2_Run1_30m_CharacterizationPlan A more summarized and concise version will be written as soon as possible (SL).

Preparation of the run

Telescope Schedule weeks 0 & 1 Telescope Schedule weeks 2 & 3

Astronomer of Duty

Staff of the run: table of the nights spent at the observatory for the NIKA2 collaboration members participating to the run (T means Tuesday, S means Saturday, first night with NIKA2 staff is Tuesday 29 September, last night is Monday 9 November, 1 stands for night scheduled at the telescope, p stands for possible extension in case of problem with the cryostat). In italic: not at the telescope but on watch for possible remote help or intervention on the software and/or remote control.

People\Date

T12

13

14

15

S16

17

18

T19

20

21

22

S23

24

25

T26

27

28

29

S30

31

01

02

A.Monfardini

1

1

1

1

1

1

1

1

1

1

1

1

1

1

O.Bourrion

1

1

M.Calvo

1

1

1

1

1

1

1

A.Benoit

A.Catalano

L.Perotto

1

1

1

1

1

1

1

B.Comis

1

1

1

1

1

1

1

A.Ritacco

1

1

1

1

1

S.Leclercq

1

1

1

1

1

1

1

N.Ponthieu

1

1

1

1

1

1

1

1

F.Ruppin

1

1

1

1

1

1

1

J.F.Lestrade

1

1

1

1

1

1

1

A. Bracco

1

1

1

1

1

1

1

J.Soler

1

1

1

1

1

F.-X.Désert

A.Beelen

J.Macias-P.

Sleep at obs.

3

4

3

3

3

3

3

4

4

5

5

5

5

5

4

4

4

4

4

4

4

N. Billot (AOD)

1

1

1

1

1

1

1

A. Sievers (AOD)

1

1

1

1

1

1

1

Program

GoalsPrepStaffNika2Run3 (last edited 2016-01-12 14:57:03 by NikaBolometer)