NIKA2 Re-Commissioning: NIKA2 run 81, Cryo run 93
Observers on-site: M. Sánchez, A. Bongiovanni; Remote: TBD
Operators on-duty: Joaquín Santiago (day), Gloria Liñán (night)
Initialization files:
run92*.ini (previous sweep)
run93*.ini (new sweep)
Preliminary plan
To do |
Done? |
Remarks |
New sweep, cryo run 93 |
|
|
First check (pointing/focus), total power, cryo run 92 |
|
|
First beam maps, cryo run 93, total power |
|
|
Analyze preliminary beam maps and produce DAFs/RPPs (PIIC) for all arrays. Install the new DAFs/RPPs. Readapt focus script |
|
|
First calib_1scan on flux calibrators, more (night time) beam maps in total power, skydips |
|
|
Pointing session |
|
|
Calib_1scan on flux calibrators, night time beam maps (polarimetry), skydips |
|
|
Calib_1scan sequences around optimal focus for studying the beam geometry |
|
|
Deep field (total power) session |
|
|
Crab polarimetry scans (night time, pol-calibrations with Uranus) |
|
|
N2EDF tests (total power), project 092-26, total power, acq. rate 47 Hz |
|
|
Observing tests on Planck sources, project 093-26, total power |
|
|
Tables (from 2026/09/29 to 2026/10/06)
Focus sequences
Scan nr
Target
Ar2
Ar1
Ar3
Polarized?
Notes
Beam maps
Scan Nr
Target
Focus
Polarized?
Notes
Calibrators (calib_1scan)
Scan Nr
Target
Focus
Notes
Tuesday, 29th September 2026
Wednesday, 30th September 2026
Thursday, 1st October 2026
Friday, 2nd October 2026
Saturday, 3rd Octomber 2026
Sunday, 4th October 2026
Monday, 5th October 2026