Differences between revisions 31 and 32
Revision 31 as of 2026-02-25 01:20:26
Size: 7278
Comment:
Revision 32 as of 2026-02-25 01:22:55
Size: 7373
Comment:
Deletions are marked like this. Additions are marked like this.
Line 74: Line 74:
 || 20260225s22 || 3C279 || 1.65 || Pol || Array 1 ||  || 20260225s22 || 3C279 || 1.65 || Pol || Ar1 ||
Line 106: Line 106:
 * nikaw-25: polarimetry beammaps for the three arrays.  * nikaw-25: polarimetry beammaps for the three arrays. Ar1 beam of 11x13 arcsec, several focus and pointings to try to solve this before the Ar1 beammap.

Back to the NIKA2 main page

Daily Reports (2026/02/24 - 03/03 NIKA2 run 79, Cryo run 91)

Observers on-site: Felipe Alves, Shixian Mo, Miren Muñoz, Li Yingxi.

Astronomer on Duty: Stefano Berta
Pool Manager: Angel Bongiovanni

Operators: Pedro (day), Ioaquin (night)

Organization of shifts:
22:00-04:00 LT: Miren
04:00-10:00 LT: Felipe
10:00:16:00 LT: Li
16:00-22:00 LT: Mo

Important

Focus offsets shall be measured on Ar1
Pointing offsets shall be measured on Ar2

Pool-Account usage: Accounting of observing times

  • Calibration observations like pointing, focus, and calib_1scan (the latter in case of NIKA2-Pol only, aimed at characterizing the instrumental polarization) which are conducted before and during project observations are part of the project time. Note that all proposals include such overheads in the time and sensitivity estimates. This holds for total power and polarimetry observations.

  • Other calibration observations which are important for all projects like beam maps, skydips, or calib_1scan for absolute flux calibration may be accounted under the pool account (nikaX-YY, where X = s,w and YY = year ; nikaw-25 in this case).

  • When conditions are unstable and it is unclear whether project observations make sense at all, calibrations may be accounted to the pool account.

Focus and Beam maps accounting

Please fill the Table with the Ar1,2,3 focus values as follows. At best, make one table per day.

  • Focus sequences (NOTE: Ar2 is very noisy and this might influence the A2 focus value)

    Scans nr.

    Target

    Ar2

    Ar1

    Ar3

    Pol?

    Notes

    20260224s75-79

    Uranus

    out

    0.65

    0.90

    yes

    started at 1.3 mm

    109-113

    Uranus

    -0.14

    uhm

    +0.72

    yes

    started at 1.0 mm; Ar2 based on FWHM only; Ar3 with 4 points only; Ar1 with only 3 points -> re-do

    114-118

    Uranus

    -0.17

    +0.64

    +0.84

    yes

    started at 0.8 mm; Ar2 based on FWHM only

    128-132

    Uranus

    0.11

    0.85

    1.15

    yes

    started at 1 mm; Ar2 based on FWHM only (marginal)

    153-157

    Uranus

    out

    1.43

    out

    yes

    started at 1.3 mm; Ar1 only 4 points but good parabola

    182-186

    3C84

    0.51

    1.55

    1.80

    yes

    started at 1.43 mm

    20260225s8-12

    3C279

    out

    1.60

    1.86

    yes

    started at 1.55 mm

    14-18

    3C279

    out

    1.65

    1.90

    yes

    started at 1.60 mm

Similarly, if any beam maps (total power or polarimetry) are taken:

  • Beam maps

    Scan Nr

    Target

    Focus

    TP (99 subscans) or Pol (95 subscans)

    Notes

    20260225s22

    3C279

    1.65

    Pol

    Ar1

Tuesday, 24th February 2026

@09:30 UT the team arrived safely at the observatory

@9:30-14:00 UT: Maintenance time; we do a cuple of hours of training on Stefano's slides before lunch

@15:30-22:00 LT Mo + everyone

  • we start the NIKA2 operations, with polarimetry; lost KIDS 5/15/22. The 1.5 Hz peak in the pow spec (see last week) is still there.
  • Tapas log-in is not working at the beginning and PM fixes it
  • few stuck scans at the start (focus sequences). Pedro fixes the problem.
  • training all together
  • 156-25 one repetition of N68 using Uranus for IP
  • 128-25 one repetition of L1482 using Uranus for IP
  • calibrations on Uranus + skydip (scan nr ...)
  • 128-25 one repetition of L1482 using Uranus for IP
  • 128-25 last scan repeated, so to compensate for the one cancelled on 2026/02/16 and make a round total number of repetitions

@22:00-04:00 LT Miren

  • 128-25: one repetition of L1482 using Uranus for IP
  • Calib_1scan on 3C84 (20260224s174), closer in elevation to L1482 than Uranus. To be used to calibrate the IP with Uranus.
  • Calib_1scan on Uranus for IP (20260224s176)
  • Calib_1scan on 3C273 (20260224s179). To be used to calibrate the IP with Uranus.
  • Pointing, focus, pointing, and calib_1scan (20260224s188) on 3C84
  • 0.25 repetitions (1/4 rounds) of L1482. Too low in elevation for more rounds.
  • Calib_1scan on 3C273 (20260225s4) for IP.
  • nikaw-25: polarimetry beammaps for the three arrays. Ar1 beam of 11x13 arcsec, several focus and pointings to try to solve this before the Ar1 beammap.

Wednesday, 25th February 2026

04:00-10:00 LT

  • ...

10:00-16:00 LT

  • ...

16:00-22:00 LT

  • ...

22:00-04:00 LT

  • ...

Thursday, 26th February 2026

04:00-10:00 LT

  • ...

10:00-16:00 LT

  • ...

16:00-22:00 LT

  • ...

22:00-04:00 LT

  • ...

Friday, 27th February 2026

04:00-10:00 LT

  • ...

10:00-16:00 LT

  • ...

16:00-22:00 LT

  • ...

22:00-04:00 LT

  • ...

Saturday, 28th February 2026

04:00-10:00 LT

  • ...

10:00-16:00 LT

  • ...

16:00-22:00 LT

  • ...

22:00-04:00 LT

  • ...

Sunday, 1st March 2026

04:00-10:00 LT

  • ...

10:00-16:00 LT

  • ...

16:00-22:00 LT

  • ...

22:00-04:00 LT

  • ...

Monday, 2nd March 2026

04:00-10:00 LT

  • ...

10:00-16:00 LT

  • ...

16:00-22:00 LT

  • ...

22:00-04:00 LT

  • ...

Thuesday, 3rd March 2026

04:00-10:00 LT

  • ...

DailyReportsNika2Pool240226 (last edited 2026-03-03 09:32:38 by NikaBolometer)