10:30-13:00; Martino, Dave, Jean, Angel: New sweep for NIKA2; old sweep files: run79*.ini; new sweep files: run80*.ini. NIKA2 cold since Oct. 21st afternoon. Cryostat window closed and Al-tape sealed. | 10:30-13:00; Martino, Dave, Jean, Angel: New sweep for NIKA2; old sweep files: run79*.ini; new sweep files: run80*.ini. NIKA2 cold since Oct. 21st afternoon. Cryostat window closed and Al-tape sealed. Sweep works delayed due to an apparent failure of the synthesizer of array 1 (the spare unit used for substituting a bad one in past August). Thanks Martino and Alessandro for preparing the sweep. |
Line 11: | Line 11: |
Before the official time for starting the scheduled tests of the Pool, we started the DAQ twice to get some samples of noise traces (NIKA2 window still being closed, telescope stopped due to bad weather) using the run79.ini ('old sweep') and run80.ini ('new sweep') configuration files. Corresponding screen-shots are given below (pending). | Before the official time for starting the scheduled tests of the Pool, we started the DAQ twice to get some samples of noise traces (NIKA2 window still being closed, telescope stopped due to bad weather) using the run79.ini ('old sweep') and run80.ini ('new sweep') configuration files. Corresponding screen-shots are given below: |
Line 13: | Line 13: |
In order to simplify swapping procedures between old and new sweep or viceversa, and keep the same run number after the last cooling down (80), new filenames have been defined in the nika2@nika2-a:~/NIKA/Processing/NIKA_lib_V3_IRAM/Acquisition/experiments/ folder: * To activate the old sweep, total power, do 'cp -p run80_tp_old_sweep.ini run80.ini' * To activate the new sweep, total power, do 'cp -p run80_tp_new_sweep.ini run80.ini' Then prepare final 'tp' to 'pol' files for science observations. Don't forget changing run definition in nika2@nika2-a:~/ folder. |
Monitor status and noise traces, 'old sweep', bad KIDs Ar1: 25/1041; Ar2: 2/579; Ar3: 26/1056.<<BR>> |
Line 22: | Line 16: |
[[attachment:monitor_run79_20241022.png|{{attachment:monitor_run79_20241022.png||width=900}}|target="_blank"]]<<BR>> [[attachment:traces_run79_Ar1_20241022.png|{{attachment:traces_run79_Ar1_20241022.png||width=500}}|target="_blank"]] [[attachment:traces_run79_Ar2_20241022.png|{{attachment:traces_run79_Ar2_20241022.png||width=500}}|target="_blank"]] [[attachment:traces_run79_Ar3_20241022.png|{{attachment:traces_run79_Ar3_20241022.png||width=500}}|target="_blank"]] |
|
Line 23: | Line 21: |
Monitor status and noise traces, 'old sweep', bad KIDs Ar1: x/1055; Ar2: y/573; Ar3: z/1056.<<BR>> | Monitor status and noise traces, 'new sweep', bad KIDs Ar1: 14/1040; Ar2: 3/578; Ar3: 21/1054.<<BR>> |
Line 26: | Line 24: |
[[attachment:monitor_run72_20221010.png|{{attachment:monitor_run72_20221010.png||width=900}}|target="_blank"]]<<BR>> [[attachment:traces_run72_Ar1_20221010.png|{{attachment:traces_run72_Ar1_20221010.png||width=500}}|target="_blank"]] [[attachment:traces_run72_Ar2_20221010.png|{{attachment:traces_run72_Ar2_20221010.png||width=500}}|target="_blank"]] [[attachment:traces_run72_Ar3_20221010.png|{{attachment:traces_run72_Ar3_20221010.png||width=500}}|target="_blank"]] Monitor status and noise traces, 'new sweep', bad KIDs Ar1: xx/1061; Ar2: yy/581; Ar3: zz/1077.<<BR>> <<BR>> [[attachment:monitor_run73_20221010.png|{{attachment:monitor_run73_20221010.png||width=900}}|target="_blank"]]<<BR>> [[attachment:traces_run73_Ar1_20221010.png|{{attachment:traces_run73_Ar1_20221010.png||width=500}}|target="_blank"]] [[attachment:traces_run73_Ar2_20221010.png|{{attachment:traces_run73_Ar2_20221010.png||width=500}}|target="_blank"]] [[attachment:traces_run73_Ar3_20221010.png|{{attachment:traces_run73_Ar3_20221010.png||width=500}}|target="_blank"]] |
[[attachment:monitor_run80_20241022.png|{{attachment:monitor_run80_20241022.png||width=900}}|target="_blank"]]<<BR>> [[attachment:traces_run80_Ar1_20241022.png|{{attachment:traces_run80_Ar1_20241022.png||width=500}}|target="_blank"]] [[attachment:traces_run80_Ar2_20241022.png|{{attachment:traces_run80_Ar2_20241022.png||width=500}}|target="_blank"]] [[attachment:traces_run80_Ar3_20241022.png|{{attachment:traces_run80_Ar3_20241022.png||width=500}}|target="_blank"]] |
Line 41: | Line 31: |
00:00-03:33; Ioannis, Jean, Angel: tonight's plan includes (i) checking instrument health, pointing and focus (old sweep: run79_tp.ini file), (ii) getting beam maps in TP & POL (new sweep: run80*.ini files), (iii) getting NIKA2-POL efficiency measurements (primary and secondary calibrators) pending from first tests of telescope's behaviour after painting (see this [[https://publicwiki.iram.es/Nika2Run64|site]]), with (iv) NIKA2-POL calibration of selected polarised sources recently observed with SMA. | 00:30-05:00; Ioannis, Jean, Angel: tonight's plan includes (i) checking instrument health, pointing and focus (old sweep: run79_tp.ini file), (ii) getting beam maps in TP & POL (new sweep: run80*.ini files), (iii) getting NIKA2-POL efficiency measurements (primary and secondary calibrators) pending from first tests of telescope's behaviour after painting (see this [[https://publicwiki.iram.es/Nika2Run64|site]]), (iv) obtaining NIKA2-POL calibration observations of selected polarised sources recently observed with SMA (kindly compiled by Ioannis) and last not not least, we plan to do parallel tests on imbFITS creation by using the standard approach and the new codes prepared by Jean. Unfortunately, the synthesizer referred failed 3 times more after the sweep. From the planned observations, we were only able to get the beam maps in TP (scan 20241023s8) and POL (scan 20241023s9). The array 1 data of the latter are useless due to the last failure of the synthesizer, just when the last third of the beam map was left. The creation of imbFITS with the new codes and PIIC-QL analysis were successful. At this point it is becoming increasingly difficult to restart the synthesizer and when this is possible, the unit fails shortly after. We are awaiting its replacement by a synthesizer sent today by Martino and Alessandro. |
Daily Reports
Oct 22nd, Tuesday
Special session prior the NIKA2 Pool - Summer 2024
10:30-13:00; Martino, Dave, Jean, Angel: New sweep for NIKA2; old sweep files: run79*.ini; new sweep files: run80*.ini. NIKA2 cold since Oct. 21st afternoon. Cryostat window closed and Al-tape sealed. Sweep works delayed due to an apparent failure of the synthesizer of array 1 (the spare unit used for substituting a bad one in past August). Thanks Martino and Alessandro for preparing the sweep.
Before the official time for starting the scheduled tests of the Pool, we started the DAQ twice to get some samples of noise traces (NIKA2 window still being closed, telescope stopped due to bad weather) using the run79.ini ('old sweep') and run80.ini ('new sweep') configuration files. Corresponding screen-shots are given below:
Monitor status and noise traces, 'old sweep', bad KIDs Ar1: 25/1041; Ar2: 2/579; Ar3: 26/1056.
Monitor status and noise traces, 'new sweep', bad KIDs Ar1: 14/1040; Ar2: 3/578; Ar3: 21/1054.
Oct 23rd, Wednesday
00:30-05:00; Ioannis, Jean, Angel: tonight's plan includes (i) checking instrument health, pointing and focus (old sweep: run79_tp.ini file), (ii) getting beam maps in TP & POL (new sweep: run80*.ini files), (iii) getting NIKA2-POL efficiency measurements (primary and secondary calibrators) pending from first tests of telescope's behaviour after painting (see this site), (iv) obtaining NIKA2-POL calibration observations of selected polarised sources recently observed with SMA (kindly compiled by Ioannis) and last not not least, we plan to do parallel tests on imbFITS creation by using the standard approach and the new codes prepared by Jean.
Unfortunately, the synthesizer referred failed 3 times more after the sweep. From the planned observations, we were only able to get the beam maps in TP (scan 20241023s8) and POL (scan 20241023s9). The array 1 data of the latter are useless due to the last failure of the synthesizer, just when the last third of the beam map was left. The creation of imbFITS with the new codes and PIIC-QL analysis were successful. At this point it is becoming increasingly difficult to restart the synthesizer and when this is possible, the unit fails shortly after. We are awaiting its replacement by a synthesizer sent today by Martino and Alessandro.