Differences between revisions 46 and 47
Revision 46 as of 2025-10-21 20:36:59
Size: 4134
Comment:
Revision 47 as of 2025-10-21 20:47:54
Size: 4195
Comment:
Deletions are marked like this. Additions are marked like this.
Line 55: Line 55:
 || 172-176 || 1803+784 || +0.16 || 1.0 || 1.24 || Started at 1.0; custom; Ar2 not well determined||  || 172-176 || 1803+784 || +0.16 || 1.0 || 1.24 || Started at 1.0; custom; Ar2 not well determined; see Tapas for further interesting features of this sequence||

Back to the NIKA2 main page

Daily Reports (2025/10/21-28, NIKA2 run 75, Cryo run 87)

Observers on-site: Monica Rodriguez, Samuel Leclercq, Raphaël Maris, Stefano Berta and Stergios Amarantidis (AoD).

Remote observers: Michael Mattern (Saturday-Tuesday).

Operators: Sergio and Mario.

Shifts: 10-16 Raphaël; 16-22 Samuel; 22-4 Stefano; 4-10 Monica.

All times reported are in UTC (if not mentioned otherwise).

Preparatory notes

Please, remember to use the focus value of Ar1 (roughly Ar2 + 0.65 mm, but use directly the focus Ar1 monitor if possible). Please use the custom modified focus script focusOTF-Z_2025.pako.

Therefore, importantly, when checking the quality of the beam on a pointing map to decide if a new focus is needed, it is better to do it on the Ar1 map, because that's the one focused at best.

Project D01-25 (M51) requires DAQ restarting with the run87_newSweep_M51_tp.ini file. Come back to run87_neSweep_tp.ini after observing this project.

Please fill the Table with the Ar1,2,3 focus values as follows. At best, make one table per day.

  • Focus sequences

    Scan nr

    Target

    Ar2

    Ar1

    Ar3

    Notes

Similarly, if any beam maps are taken:

  • Beam maps (99 sub-scans)

    Scan Nr

    Target

    Focus

    Notes

October 21st, 2025, Tuesday

15:00-22:00[All]: Maintenance finished with no issues. DAQ started at 14:10 with 21/3/47 bad KIDS for arrays 1,2 and 3, respectively. Repeating the DAQ at 14:24 with 28/3/89. Trying to point at NGC7027 and MWC349 but the weather is too unstable (p2p~10-20Jy/beam), moving to K3-50A for pointing and focus (using the modified 2025 script). Moving for calib_1scan to MWC349, etc. Switching to project 053-25 (source 1803+784 is better for pointing/focus). One repetition of L1157B. Around 17:12 we moved to a skydip and then to the normal flux calibrators. After pointing/focus on 1803+784 we move to project 022-25. Two repetitoins of Ceph-4.

22:00-04:00[Stefano]: ...

  • Focus sequences of 2025/10/21

    Scan nr

    Target

    Ar2

    Ar1

    Ar3

    Notes

    20251021s109-113

    K3-50A

    +0.10

    +0.61

    +0.80

    Started at 1mm, custom script, array 2 out of range

    s114-118

    K3-50A

    +0.02

    +0.60

    +0.82

    Started at 0.61mm, custom script

    s131-135

    1803+784

    ...

    +0.56

    +0.75

    Started at 0.6mm, custom script, array 2 out of range

    s147-151

    1803+784

    +0.15

    +0.68 to +0.77

    +1.00

    Started at 0.56mm, custom script; focus set to 0.68

    162-166

    1803+784

    +0.33

    +1.1

    ...

    Started at 0.8 mm, custom; Ar1 based on FWHM only; Ar3 out of range

    167-171

    1803+784

    problems with the new make-imbf of scan 171

    172-176

    1803+784

    +0.16

    1.0

    1.24

    Started at 1.0; custom; Ar2 not well determined; see Tapas for further interesting features of this sequence

October 22nd, 2025, Wednesday

04:00-10:00[Monica]: ...

10:00-16:00[Raphaël]: ...

16:00-22:00[Samuel]: ...

22:00-04:00[Stefano]: ...

  • Focus sequences

    Scan nr

    Target

    Ar2

    Ar1

    Ar3

    Notes

21:00-03:00[]: ...

  • Focus sequences

    Scan nr

    Target

    Ar2

    Ar1

    Ar3

    Notes

DailyReportsNika2Pool211025 (last edited 2025-10-28 09:05:29 by NikaBolometer)