Daily Reports (2026/10/20-27, NIKA2 run 81, Cryo run 93)
Observers on-site: Philippe André, Samuel Crowe, Jean-François Lestrade, Kaiyi Du
AoD: Miren
Operators: Sergio, Mario
Please fill the Table with the Ar1,2,3 focus values as follows. At best, make one table per day.
Focus sequences
Scan nr
Target
Ar2
Ar1
Ar3
Polarized?
Notes
Focus sequences
Scan nr
Target
Ar2
Ar1
Ar3
Polarized?
Notes
Similarly, if any beam maps (total power) are taken:
Beam maps (99 sub-scans)
Scan Nr
Target
Focus
Notes
Pool-Account usage: Accounting of observing times
Calibration observations like pointing, focus, and calib_1scan (the latter in case of NIKA2-Pol only, aimed at characterizing the instrumental polarization) which are conducted before and during project observations are part of the project time. Note that all proposals include such overheads in the time and sensitivity estimates. This holds for total power and polarimetry observations.
Other calibration observations which are important for all projects like beam maps, skydips, or calib_1scan for absolute flux calibration may be accounted under the pool account (nikaX-YY, where X = s,w and YY = year).
- When conditions are unstable and it is unclear whether project observations make sense at all, calibrations may be accounted to the pool account.
October 20th, 2026, Tuesday
October 21st, 2026, Wednesday
October 22nd, 2026, Thursday
October 23rd, 2026, Friday
October 24th, 2026, Saturday
October 25th, 2026, Sunday
October 26th, 2026, Monday
