2024 Feb. 20th, Tuesday

Ioannis, Kaiyi, Hervé, Philippe, and Stefano arrived at the telescope.

Maintenance: the telescope and NIKA2 are healthy. The HWP has been tested and rotates correctly. All is ready for a great week :)

16:00-19:30; Angel, Stefano, Ioannis, Hervé, Kaiyi: Tuning after maintenance and at a high elevation of ~70 deg. Bad kids 13/2/16. Pointing and focus on the quasar 0316+413. Beam size ~ 17.7 x 18.5" at 2mm. Small ellipticity remains also after focus. Atmospheric stability at ~ 2-5 Jy/beam for 2mm data. Training session for Hervé and Kaiyi on NIKA2 pool observations. Skydip [scan 20240220s82] and then started with project 150-23. After initial pointing loaded an OTF map on source "id307" but observations stopped after only one scan was completed due to wind velocity exceeding the limit (reached ~ 14 m/s). Tracking deterioration was also visible up to the point that we stopped.