Differences between revisions 5 and 6
Revision 5 as of 2026-01-20 12:03:31
Size: 5090
Comment:
Revision 6 as of 2026-01-20 17:53:05
Size: 5185
Comment:
Deletions are marked like this. Additions are marked like this.
Line 10: Line 10:
Operators: ... Operators: Pedro (day), Sergio (night)
Line 71: Line 71:
@9:30-14:00 UT: Maintenance time 10:30-15:00 LT: Maintenance time. <<BR>>
Line 73: Line 73:
11:30-13:00 LT: training of the observers "on paper" and consolidation of the shifts.<<BR>>
Line 74: Line 75:
15:00-21:00 UT Ping Zhou + all + Stefano
 * ...
15:00-21:00 LT: POLAMI 087-21 time. <<BR>>
Line 77: Line 77:
15:00-17:30 LT: Further training of the observers at the control console. <<BR>>
Line 78: Line 79:
21:00-03:00 UT: Mairi 21:00-03:00 LT: Mairi
Line 84: Line 85:
03:00-09:00 UT Carsten 03:00-09:00 LT Carsten
Line 88: Line 89:
09:00-15:00 UT Friedrich 09:00-15:00 LT Friedrich
Line 92: Line 93:
15:00-21:00 UT Ping 15:00-21:00 LT Ping
Line 96: Line 97:
21:00-03:00 UT Mairi 21:00-03:00 LT Mairi
Line 103: Line 104:
03:00-09:00 UT Carsten 03:00-09:00 LT Carsten
Line 107: Line 108:
09:00-15:00 UT Friedrich 09:00-15:00 LT Friedrich
Line 111: Line 112:
15:00-21:00 UT Ping 15:00-21:00 LT Ping
Line 115: Line 116:
21:00-03:00 UT Mairi 21:00-03:00 LT Mairi
Line 121: Line 122:
03:00-09:00 UT Carsten 03:00-09:00 LT Carsten
Line 125: Line 126:
09:00-15:00 UT Friedrich 09:00-15:00 LT Friedrich
Line 129: Line 130:
15:00-21:00 UT Ping 15:00-21:00 LT Ping
Line 133: Line 134:
21:00-03:00 UT Mairi 21:00-03:00 LT Mairi
Line 139: Line 140:
03:00-09:00 UT Carsten 03:00-09:00 LT Carsten
Line 143: Line 144:
09:00-15:00 UT Friedrich 09:00-15:00 LT Friedrich
Line 147: Line 148:
15:00-21:00 UT Ping 15:00-21:00 LT Ping
Line 151: Line 152:
21:00-03:00 UT Mairi 21:00-03:00 LT Mairi
Line 157: Line 158:
03:00-09:00 UT Carsten 03:00-09:00 LT Carsten
Line 161: Line 162:
09:00-15:00 UT Friedrich 09:00-15:00 LT Friedrich
Line 165: Line 166:
15:00-21:00 UT Ping 15:00-21:00 LT Ping
Line 169: Line 170:
21:00-03:00 UT Mairi 21:00-03:00 LT Mairi
Line 175: Line 176:
03:00-09:00 UT Carsten 03:00-09:00 LT Carsten
Line 179: Line 180:
09:00-15:00 UT Friedrich 09:00-15:00 LT Friedrich
Line 183: Line 184:
15:00-21:00 UT Ping 15:00-21:00 LT Ping
Line 187: Line 188:
21:00-03:00 UT Mairi 21:00-03:00 LT Mairi
Line 193: Line 194:
03:00-09:00 UT Carsten 03:00-09:00 LT Carsten
Line 195: Line 196:


09:00-15:00 UT Friedrich
 * ...


15:00-21:00 UT Ping
 * ...


21:00-03:00 UT Mairi
 * ...

Back to the NIKA2 main page

Daily Reports (2026/01/20-27, NIKA2 run 78, Cryo run 90)

Observers on-site: Carsten Kramer, Mairi Nonhebel, Friedrich Wyrowski, Ping Zhou

Astronomer on Duty: Stefano Berta
Pool Manager: Angel Bongiovanni

Operators: Pedro (day), Sergio (night)

Organization of shifts:
03:00-09:00 UT: Carsten Kramer
09:00-15:00 UT: Friedrich Wyrowski
15:00-21:00 UT: Ping Zhou
21:00-03:00 UT: Mairi Nonhebel

Important

Focus offsets shall be measured on Ar1
Pointing offsets shall be measured on Ar2

Pool-Account usage: Accounting of observing times

  • Calibration observations like pointing, focus, and calib_1scan (the latter in case of NIKA2-Pol only, aimed at characterizing the instrumental polarization) which are conducted before and during project observations are part of the project time. Note that all proposals include such overheads in the time and sensitivity estimates. This holds for total power and polarimetry observations.

  • Other calibration observations which are important for all projects like beam maps, skydips, or calib_1scan for absolute flux calibration may be accounted under the pool account (nikaX-YY, where X = s,w and YY = year ; nikaw-25 in this case).

  • When conditions are unstable and it is unclear whether project observations make sense at all, calibrations may be accounted to the pool account.

Focus and Beam maps accounting

Please fill the Table with the Ar1,2,3 focus values as follows. At best, make one table per day.

  • Focus sequences (NOTE: Ar2 is very noisy and this might influence the A2 focus value)

    Scans nr.

    Target

    Ar2

    Ar1

    Ar3

    Pol?

    Notes

Similarly, if any beam maps (total power or polarimetry) are taken:

  • Beam maps

    Scan Nr

    Target

    Focus

    TP (99 subscans) or Pol (95 subscans)

    Notes

Tuesday, 20th January 2026

10:30-15:00 LT: Maintenance time.

11:30-13:00 LT: training of the observers "on paper" and consolidation of the shifts.

15:00-21:00 LT: POLAMI 087-21 time.

15:00-17:30 LT: Further training of the observers at the control console.

21:00-03:00 LT: Mairi

  • ...

Wednesday, 21st January 2026

03:00-09:00 LT Carsten

  • ...

09:00-15:00 LT Friedrich

  • ...

15:00-21:00 LT Ping

  • ...

21:00-03:00 LT Mairi

  • ...

Thursday, 22nd January 2026

03:00-09:00 LT Carsten

  • ...

09:00-15:00 LT Friedrich

  • ...

15:00-21:00 LT Ping

  • ...

21:00-03:00 LT Mairi

  • ...

Friday, 23rd January 2026

03:00-09:00 LT Carsten

  • ...

09:00-15:00 LT Friedrich

  • ...

15:00-21:00 LT Ping

  • ...

21:00-03:00 LT Mairi

  • ...

Saturday, 24th January 2026

03:00-09:00 LT Carsten

  • ...

09:00-15:00 LT Friedrich

  • ...

15:00-21:00 LT Ping

  • ...

21:00-03:00 LT Mairi

  • ...

Sunday, 25th January 2026

03:00-09:00 LT Carsten

  • ...

09:00-15:00 LT Friedrich

  • ...

15:00-21:00 LT Ping

  • ...

21:00-03:00 LT Mairi

  • ...

Monday, 26th January 2026

03:00-09:00 LT Carsten

  • ...

09:00-15:00 LT Friedrich

  • ...

15:00-21:00 LT Ping

  • ...

21:00-03:00 LT Mairi

  • ...

Tuesday, 27th January 2026

03:00-09:00 LT Carsten

  • ...

DailyReportsNika2Pool200126 (last edited 2026-01-27 15:38:52 by NikaBolometer)