Line 15: Line 15:
'''21:00-03:00'''; Jianhang: The observation of the first map set for target W3-IRS5 (project 104-23) was resumed by completing the scans removed from the queue before. Switched to project 152-23: line calibration on M82, REF position checked, and 4 repetitions on J0826. Mean tau_225GHz increasing up to ~0.6 with large spikes over most of the shift, very low wind speed. Light fog outside at the end of the shift. '''21:00-03:00'''; Jianhang: The observation of the first map set for target W3-IRS5 (project 104-23) was resumed by completing the scans removed from the queue before. Switched to project 152-23: line calibration on M82, REF position checked, and 5 repetitions on J0826. Mean tau_225GHz increasing up to ~0.6 with large spikes over most of the shift, very low wind speed. Light fog outside at the end of the shift.

Back to the NIKA2 main page

Daily Reports

Feb. 13th, Tuesday

10:30-15:00; Maintenance slot.

15:00-16:30; System check with EMIR (Joaquín Santiago); Jean's tests of the BluePill and Aleksej's tests of the wobbler system (both in remote).

16:30-21:00; Jianhang, Stefano, Antoine, Federico, Angel: tau_225GHz~0.5, wind speed about 2-4 m/s, not so stable atmosphere, but after pointing & focus trials, look quite good for EMIR backup programs. Some problems with beam switching (not-so-good behaviour of the chopper wheel; fixed provisionally by launching two pointings in a row per pointing try). We started with EMIR backup program 073-23, TMC2 and CB23 were successfully observed. At ~20h we switched to project 104-23. The first map set for target W3-IRS5 (2h) was started. InSegment tracking deviations below 1 arcsec. At 19:52 (UT) a continuous sequence of TCP/IP local socket closed/connected messages in the PCP started to appear. The queue was cancelled by Juan Luis. After the due error acknowledgment in the PCP, we launched a calibration. No more warning/error rolling messages in the PCP.

21:00-03:00; Jianhang: The observation of the first map set for target W3-IRS5 (project 104-23) was resumed by completing the scans removed from the queue before. Switched to project 152-23: line calibration on M82, REF position checked, and 5 repetitions on J0826. Mean tau_225GHz increasing up to ~0.6 with large spikes over most of the shift, very low wind speed. Light fog outside at the end of the shift.

Feb. 14th, Wednesday

03:00-09:00; Stefano:

DailyReportsNika2Pool130224 (last edited 2024-02-22 22:29:53 by NikaBolometer)