'''09:00-15:00'''; Federico: '''09:00-15:00'''; Federico: 9:30h - 10h (LT) operation to restore the anemometer. Wind speed measure working, not the direction. At 10h, cleaned the cage of the taumeter from snow/ice. Restarted the taumeter measurement. In the meantime, telescope rotated in from of the operation room to visually check the status of the ice on the telescope.

Back to the NIKA2 main page

Daily Reports

Feb. 13th, Tuesday

10:30-15:00; Maintenance slot.

15:00-16:30; System check with EMIR (Joaquín); Jean's tests of the BluePill and Aleksej's tests of the wobbler system (both in remote).

16:30-21:00; Jianhang, Stefano, Antoine, Federico, Angel: tau_225GHz~0.5, wind speed about 2-4 m/s, not so stable atmosphere, but after pointing & focus trials, look quite good for EMIR backup programs. Some problems with beam switching (not-so-good behaviour of the chopper wheel; fixed provisionally by launching two pointings in a row per pointing try). We started with EMIR backup program 073-23, TMC2 and CB23 were successfully observed. At ~20h we switched to project 104-23. The first map set for target W3-IRS5 (2h) was started. InSegment tracking deviations below 1 arcsec. At 19:52 (UT) a continuous sequence of TCP/IP local socket closed/connected messages in the PCP started to appear. The queue was cancelled by Juan Luis. After the due error acknowledgment in the PCP, we launched a calibration. No more warning/error rolling messages in the PCP.

21:00-03:00; Jianhang: The observation of the first map set for target W3-IRS5 (project 104-23) was resumed by completing the scans removed from the queue before. Switched to project 152-23: line calibration on M82, REF position checked, and 5 repetitions on J0826. Mean tau_225GHz increasing up to ~0.6 with large spikes over most of the shift, very low wind speed. Light fog outside at the end of the shift.

Feb. 14th, Wednesday

03:00-09:00; Stefano: two more repetitions on J0826, then a pointing, then a repetition, which complete the project 152-23. tau>0.6 and unstable. No sources in other projects visible after the completed project 152-23 for a very long while. One more repetition on J0826 to compensate bad weather. Suspended observations and waited that weather improved (for 1.5h). Now, tau stabilized around 0.6, started 112-23 for lack of other observable sources. Done two sources (G59.78+0.07, G59.79+0.07), then pointing+focus+pointing after sunrise, then done one more sources (G59.79+0.63), only one repetition each.

09:00-15:00; Federico: one repetition completed for source G58.77+0.64, project 112-23. Changed project to 079-23 to complete the second half of the final observation of Clump_B, setup 2 (9 subscans). Completed (09 UTC). Changed configuration for NIKA2 session: initialization of the quick look pipeline terminals. Tentative pointing session on source 16041+399. First track stacked, reactivating tracking & homology. Second track was completed (10:06 UTC), testing imbFITS creation. Stopped all operations for wind, telescope moved to a safe position.

15:00-21:00; Antoine: Windy for all the afternoon. Operations restarted again at 18:15 (LT) with Nika2. Bad KIDS (a1, a2, a3: 27, 1, 31). Excellent pointing and focus on Uranus, very good atmospheric stability, tau ~ 0.3. Calib_1scan (scan 89). Then started observing source id307 of project 150-23 for half a repetition (40 minutes). Then went back to Uranus and finished with focus, launched a beam map (scan 105, sudden spike from taumeter records in the middle) and a skydip (scan 106).

21:00-03:00; Jianhang: Finished two half repetitions for source id307, project 150-23 of NIKA2 pool. Changed to project 106-23 later due to the increase of opacity (tau>0.4). For project 106-23, the opacity is still good enough in the beginning (tau<0.5), but became worse in the middle of the observation. Source WB89-705 observed (scans 20240214s134-139 and 20240215s1-6). After 1:00 (LT), changed to the EMIR backup programs (project 143-23, target region1).

Today, we have beautiful sunset :-)

attachment:iram30_telescope_jianhang.jpeg attachment:sunset_jianhang.jpeg

Feb. 15th, Thursday

03:00-09:00; Stefano: at the start tau>0.4 and variable. Jianhang started project 143-23 for lack of other observable sources. hi-frequency data are likely useless (but anything else observable). Observed 6 repetitions of region1, with pointing and focus before, in the middle, and end. Bad weather, observations suspended at UT=4:44 with tau=0.6-1 and variable. Observations restarted in test mode at UT=5:45 under variable conditions with test focus and pointing. Program 104-23 started at UT~6:17. Started obs of IRAS18566 (the largest elevation source, all raising now). Done 5.5 maps then suspended because of wind at UT=7:33.

09:00-15:00; Federico: Operation still suspended for wind. Snowing -in addition- since 15h (LT). A thunderbolt strike triggered low-voltage circuit alarms. No anemometer records after that. Possibly the bolt affected the power supply of the meteo station. It will be checked by technical staff when conditions improve.

15:00-21:00; Antoine: Condition is still not suitable for observation, till 21h (LT). Wind gusts. Snowing.

21:00-03:00; Jianhang: Operations still suspended for snow. Got an early bed at 1:00 (LT).

Feb. 16th, Friday

03:00-09:00; Stefano:

09:00-15:00; Federico: 9:30h - 10h (LT) operation to restore the anemometer. Wind speed measure working, not the direction. At 10h, cleaned the cage of the taumeter from snow/ice. Restarted the taumeter measurement. In the meantime, telescope rotated in from of the operation room to visually check the status of the ice on the telescope.

15:00-21:00;