Size: 2355
Comment:
|
Size: 2467
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 21: | Line 21: |
'''03:00-09:00'''; Federico: one repetition completed for source G58.77+0.64, project 112-23. | '''03:00-09:00'''; Federico: one repetition completed for source G58.77+0.64, project 112-23. Changed project to 079-23 to complete the second half of the final observation of Clump_B, setup 2 (9 subscans). |
Daily Reports
Feb. 13th, Tuesday
10:30-15:00; Maintenance slot.
15:00-16:30; System check with EMIR (Joaquín Santiago); Jean's tests of the BluePill and Aleksej's tests of the wobbler system (both in remote).
16:30-21:00; Jianhang, Stefano, Antoine, Federico, Angel: tau_225GHz~0.5, wind speed about 2-4 m/s, not so stable atmosphere, but after pointing & focus trials, look quite good for EMIR backup programs. Some problems with beam switching (not-so-good behaviour of the chopper wheel; fixed provisionally by launching two pointings in a row per pointing try). We started with EMIR backup program 073-23, TMC2 and CB23 were successfully observed. At ~20h we switched to project 104-23. The first map set for target W3-IRS5 (2h) was started. InSegment tracking deviations below 1 arcsec. At 19:52 (UT) a continuous sequence of TCP/IP local socket closed/connected messages in the PCP started to appear. The queue was cancelled by Juan Luis. After the due error acknowledgment in the PCP, we launched a calibration. No more warning/error rolling messages in the PCP.
21:00-03:00; Jianhang: The observation of the first map set for target W3-IRS5 (project 104-23) was resumed by completing the scans removed from the queue before. Switched to project 152-23: line calibration on M82, REF position checked, and 5 repetitions on J0826. Mean tau_225GHz increasing up to ~0.6 with large spikes over most of the shift, very low wind speed. Light fog outside at the end of the shift.
Feb. 14th, Wednesday
03:00-09:00; Stefano: two more repetitions on J0826, then a pointing, then a repetition, which complete the project 152-23. tau>0.6 and unstable. No sources in other projects visible after the completed project 152-23 for a very long while. One more repetition on J0826 to compensate bad weather. Suspended observations and waited that weather improves. Now, tau stabilized around 0.6, started 112-23 for lack of other observable sources. done two sources (G59.78+0.07, G59.79+0.07), then pointing+focus+pointing after sunrise, then done one more sources (G59.79+0.63), only one repetition each.
03:00-09:00; Federico: one repetition completed for source G58.77+0.64, project 112-23. Changed project to 079-23 to complete the second half of the final observation of Clump_B, setup 2 (9 subscans).