Differences between revisions 1 and 2
Revision 1 as of 2026-01-13 08:34:06
Size: 3595
Comment:
Revision 2 as of 2026-01-13 16:27:51
Size: 3831
Editor: imyserlis
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
Observers on-site: Ste B, ... Observers on-site: Ste B, Cheng Yu, Rubén Fedriani, Paul Law, Andrea Bracco
Line 10: Line 10:
Operators: ... Operators: Joaquín Santiago (day) and Gloria Liñan (night)
Line 14: Line 14:
21:00-03:00 UT: ... <<BR>>
03:00-09:00-10:00 UT: ... <<BR>>
09:00:15:00 UT: ... <<BR>>
15:00-21:00 UT: ... <<BR>>
04:00-10:00-10:00 UT: Stefano Berta <<BR>>
10:00:16:00 UT: Cheng Yu and Rubén Fedriani <<BR>>
16:00-22:00 UT: Paul Law <<BR>>
22:00-04:00 UT: Andrea Bracco <<BR>>
Line 70: Line 70:
@9:30-14:00 UT: Maintenance time 10:30-15:30: Maintenance time
Line 72: Line 72:
.... 15:30-... : Stopped due to high wind. Training session on NIKA2 observations with on-site observers.

Back to the NIKA2 main page

Daily Reports (2026/01/13-20, NIKA2 run 78, Cryo run 90)

Observers on-site: Ste B, Cheng Yu, Rubén Fedriani, Paul Law, Andrea Bracco

Astronomer on Duty: Ioannis Myserlis
Pool Manager: Angel Bongiovanni

Operators: Joaquín Santiago (day) and Gloria Liñan (night)

Organization of shifts:
04:00-10:00-10:00 UT: Stefano Berta
10:00:16:00 UT: Cheng Yu and Rubén Fedriani
16:00-22:00 UT: Paul Law
22:00-04:00 UT: Andrea Bracco

Important

Focus offsets shall be measured on Ar1
Pointing offsets shall be measured on Ar2

Pool-Account usage: Accounting of observing times

  • Calibration observations like pointing, focus, and calib_1scan (the latter in case of NIKA2-Pol only, aimed at characterizing the instrumental polarization) which are conducted before and during project observations are part of the project time. Note that all proposals include such overheads in the time and sensitivity estimates. This holds for total power and polarimetry observations.

  • Other calibration observations which are important for all projects like beam maps, skydips, or calib_1scan for absolute flux calibration may be accounted under the pool account (nikaX-YY, where X = s,w and YY = year ; nikaw-25 in this case).

  • When conditions are unstable and it is unclear whether project observations make sense at all, calibrations may be accounted to the pool account.

Focus and Beam maps accounting

Please fill the Table with the Ar1,2,3 focus values as follows. At best, make one table per day.

  • Focus sequences (NOTE: Ar2 is very noisy and this might influence the A2 focus value)

Similarly, if any beam maps (total power or polarimetry) are taken:

  • Beam maps

    Scan Nr

    Target

    Focus

    TP (99 subscans) or Pol (95 subscans)

    Notes

Tuesday, 13th January 2026

10:30-15:30: Maintenance time

15:30-... : Stopped due to high wind. Training session on NIKA2 observations with on-site observers.

DailyReportsNika2Pool130126 (last edited 2026-01-20 07:56:21 by NikaBolometer)