Back to the NIKA2 main page

Daily Reports (2026/01/06-13, NIKA2 run 78, Cryo run 90)

Observers on-site: Beth Jones, Michael Logue, Remi Adam, Tuan-Anh Duong

Astronomer-of-Duty: Stefano Berta Pool Manager: Angel Bongiovanni

Operators: Kike (day), Frederic (night)

Organization of shifts:
21:00-03:00 UT: Tuan-Anh
03:00-09:00-10:00 UT: Remi
09:00:15:00 UT: Beth
15:00-21:00 UT: Michael

Preparatory notes

Please fill the Table with the Ar1,2,3 focus values as follows. At best, make one table per day.

Similarly, if any beam maps (total power) are taken:

Pool-Account usage: Accounting of observing times

Tuesday 6th January 2026

@9:30 UT: the team arrived safely to the telescope. Blue skies, low tau, strong winds.
Short briefing to share important mountain information and recommendations. We re-organize the shifts (see top of this page).

@13:30 UT: system checks finished, Dave goes back to Granada. Starting the rotation of the HWP required to reboot the DAQ few times and also the mppsync server.
NIKA2 system setup completed: DAQ running, HWP rotating, NIKA2 window open, PaKo running, QL monitors x6 running, make-imbf new/old running. We wait only for the wind to calm down.

@14:00 UT Alessandro and Martino ask for some time to remotely check the amplifier of the noisy Box C (Ar2). They think that this enhanced noise might be due to the polarization of the Box C amplifier, that needs to be re-set from time to time. Alessandro and Martino check the amplifier. In Alessandro's words: "The gain of the amplifier C is too low. (...) I could fix it by playing with the parameters of the amplifier C but now with the parameters that worked in June 2025 it is not working anymore (...) it seems that the third stage of the amplifier C (YL026, the one that we have installed in June) is not working. The gain must thus be much lower, and adding noise. Just the less gain doesn't explain what we observe", though.

@15:00-21:00 UT Michael + all. Taumeter tau < 0.1. The telescope is parked because of the high wind. We take the chance to have a long explanation about NIKA2 operations. In the next days we hopefully will be able to put in practice what we learned.

@21:00-03:00 UT Tuan-Ahn + Stefano. We start observing at 22:30 UT. It takes some time to set everything. We need to reboot crates 3 and 1, the DAQ and the HWP rotation. All good now. The first scan is at 23:05 UT. The secondary mirror (M2, subreflector) is a bit capricious tonight and sends errors.