Back to the NIKA2 main page

Daily Reports

2024 Mar. 5th, Tuesday

Sofia, Frederic, Tuan-Anh and Angel at the telescope since 10:30.

16:00-16:50 (local time); Angel: Starting system check. It was necessary to restart the BluePill for moving the telescope. DAQ started at 16:30 (lost KIDs: 18, 1, 38). Pointing on Uranus (scan 113); imbFITS files properly created. Despite we tried to keep the main dish as far as possible from solar radiation during the maintenance slot, a focus sequence check gave a possible correction far from the expected: sign of a distorted beam. End of system check and observations suspended at 16:50: Aleksej K. (OHB) requires the telescope for some tests.

18:00-00:00 (local time); Sofia and Angel: Resuming observations after OHB's tests. After doing pointing and focus on source 0736+017, we had a beam of 17.5 x 18.5. Completed repetitions of WB89-670 (1 repetition done, 1 remaining). Then switched to project 151-23 targeting cluster PSZ2G210 (repetition 5/6, 40 mins long). Waiting for complete relaxation of the telescope. Very stable atmosphere conditions, peak-to-peak variations below 2 Jy/beam.