Differences between revisions 4 and 5
Revision 4 as of 2024-03-05 15:50:36
Size: 683
Comment:
Revision 5 as of 2024-03-05 16:37:57
Size: 764
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
'''16:00-XX:00''' (local time); Angel: Staring system check. It was necessary to restart the BluePill for moving the telescope. DAQ restarted at 16:30 (lost KIDs: 18, 1, 38). Pointing on Uranus (scan 113); imbFITS files properly created. Beam (2 mm) a bit distorted (18.9" x 23.6"). Getting a focus before stop observations: Aleksej (OHB) requires the telescope for some tests. Everything is running okay, in principle. Stopping observations (16:50) until finishing tests. '''16:00-16:50''' (local time); Angel: Starting system check. It was necessary to restart the BluePill for moving the telescope. DAQ started at 16:30 (lost KIDs: 18, 1, 38). Pointing on Uranus (scan 113); imbFITS files properly created. Despite we tried to keep the main dish as far as possible from solar radiation during the maintenance slot, a focus sequence check gave a possible correction far from the expected: sign of a distorted beam. End of system check and observations suspended at 16:50: Aleksej (OHB) requires the telescope for some tests.

Back to the NIKA2 main page

Daily Reports

2024 Mar. 5th, Tuesday

Sofia, Frederic, Tuan-Anh and Angel at the telescope since 10:30.

16:00-16:50 (local time); Angel: Starting system check. It was necessary to restart the BluePill for moving the telescope. DAQ started at 16:30 (lost KIDs: 18, 1, 38). Pointing on Uranus (scan 113); imbFITS files properly created. Despite we tried to keep the main dish as far as possible from solar radiation during the maintenance slot, a focus sequence check gave a possible correction far from the expected: sign of a distorted beam. End of system check and observations suspended at 16:50: Aleksej (OHB) requires the telescope for some tests.

DailyReportsNika2Pool050324 (last edited 2024-03-18 09:57:00 by NikaBolometer)