Mon 03/06

Left Grenoble by car in the morning. Andrea, Alain, Alessandro. Reached the telescope at 20h30.

Tue 04/06

During the maintenance craned up again NIKA, installed. Warm impedance test: 20mbar/min at 3 bar

Start cooling down at 13h30.

Installed the electronics,

[ATTACH] [ATTACH]

figures: NIKA installed again