|
Size: 642
Comment:
|
Size: 636
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 27: | Line 27: |
| {{attachment:cryostat_21h30.jpg||width=800}} {{attachment:cryostat_21h30_2.jpg||width=700}} |
{{attachment:NIKA_back_1.jpg||width=800}} {{attachment:nika_back_2_2.jpg||width=700}} |
Go to preparation run daily reports
Preparation visit before Run6
Daily Reports
Mon 03/06
Left Grenoble by car in the morning. Andrea, Alain, Alessandro. Reached the telescope at 20h30.
Tue 04/06
During the maintenance craned up again NIKA, installed. Warm impedance test: 20mbar/min at 3 bar
Start cooling down at 13h30.
Installed the electronics,
figures: NIKA installed again
