Differences between revisions 6 and 9 (spanning 3 versions)
Revision 6 as of 2013-05-16 06:36:49
Size: 93
Comment:
Revision 9 as of 2013-06-04 15:41:53
Size: 811
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:

Preparation visit before Run6

[[NikaRun6|Back to the NIKA run 6]]



=== Daily Reports ===

=== Mon 03/06 ===
Left Grenoble by car in the morning. Andrea, Alain, Alessandro. Reached the telescope at 20h30.

=== Tue 04/06 ===
During the maintenance craned up again NIKA, installed. '''Warm impedance test: 20mbar/min at 3 bar'''

Start cooling down at 13h30.

Test with VNA at 300K:

{{attachment:VNA_1mm.jpg||width=600}}
{{attachment:VNA_2mm.jpg||width=600}}

''figures: VNA scans at 300K (0-8GHz). Left: 1mm array; right: 2mm array.''

Installed the electronics,

{{attachment:nika_back_1.jpg||width=600}}
{{attachment:NIKA_back_2.jpg||width=600}}

''figures: NIKA installed again''

Back to the NIKA run6 page

Go to preparation run daily reports

Preparation visit before Run6

Back to the NIKA run 6

Daily Reports

Mon 03/06

Left Grenoble by car in the morning. Andrea, Alain, Alessandro. Reached the telescope at 20h30.

Tue 04/06

During the maintenance craned up again NIKA, installed. Warm impedance test: 20mbar/min at 3 bar

Start cooling down at 13h30.

Test with VNA at 300K:

VNA_1mm.jpg VNA_2mm.jpg

figures: VNA scans at 300K (0-8GHz). Left: 1mm array; right: 2mm array.

Installed the electronics,

nika_back_1.jpg NIKA_back_2.jpg

figures: NIKA installed again

DailyReports6 (last edited 2013-06-21 15:48:42 by NikaBolometer)