Size: 93
Comment:
|
Size: 811
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 4: | Line 4: |
Preparation visit before Run6 [[NikaRun6|Back to the NIKA run 6]] === Daily Reports === === Mon 03/06 === Left Grenoble by car in the morning. Andrea, Alain, Alessandro. Reached the telescope at 20h30. === Tue 04/06 === During the maintenance craned up again NIKA, installed. '''Warm impedance test: 20mbar/min at 3 bar''' Start cooling down at 13h30. Test with VNA at 300K: {{attachment:VNA_1mm.jpg||width=600}} {{attachment:VNA_2mm.jpg||width=600}} ''figures: VNA scans at 300K (0-8GHz). Left: 1mm array; right: 2mm array.'' Installed the electronics, {{attachment:nika_back_1.jpg||width=600}} {{attachment:NIKA_back_2.jpg||width=600}} ''figures: NIKA installed again'' |
Go to preparation run daily reports
Preparation visit before Run6
Daily Reports
Mon 03/06
Left Grenoble by car in the morning. Andrea, Alain, Alessandro. Reached the telescope at 20h30.
Tue 04/06
During the maintenance craned up again NIKA, installed. Warm impedance test: 20mbar/min at 3 bar
Start cooling down at 13h30.
Test with VNA at 300K:
figures: VNA scans at 300K (0-8GHz). Left: 1mm array; right: 2mm array.
Installed the electronics,
figures: NIKA installed again