Differences between revisions 6 and 7
Revision 6 as of 2013-05-16 06:36:49
Size: 93
Comment:
Revision 7 as of 2013-06-04 15:36:50
Size: 642
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:

Preparation visit before Run6

[[NikaRun6|Back to the NIKA run 6]]



=== Daily Reports ===

=== Mon 03/06 ===
Left Grenoble by car in the morning. Andrea, Alain, Alessandro. Reached the telescope at 20h30.

=== Tue 04/06 ===
During the maintenance craned up again NIKA, installed. '''Warm impedance test: 20mbar/min at 3 bar'''

Start cooling down at 13h30.

Installed the electronics,





{{attachment:cryostat_21h30.jpg||width=800}}
{{attachment:cryostat_21h30_2.jpg||width=700}}

''figures: NIKA installed again''

Back to the NIKA run6 page

Go to preparation run daily reports

Preparation visit before Run6

Back to the NIKA run 6

Daily Reports

Mon 03/06

Left Grenoble by car in the morning. Andrea, Alain, Alessandro. Reached the telescope at 20h30.

Tue 04/06

During the maintenance craned up again NIKA, installed. Warm impedance test: 20mbar/min at 3 bar

Start cooling down at 13h30.

Installed the electronics,

[ATTACH] [ATTACH]

figures: NIKA installed again

DailyReports6 (last edited 2013-06-21 15:48:42 by NikaBolometer)