| Size: 93 Comment:  | Size: 642 Comment:  | 
| Deletions are marked like this. | Additions are marked like this. | 
| Line 4: | Line 4: | 
| Preparation visit before Run6 [[NikaRun6|Back to the NIKA run 6]] === Daily Reports === === Mon 03/06 === Left Grenoble by car in the morning. Andrea, Alain, Alessandro. Reached the telescope at 20h30. === Tue 04/06 === During the maintenance craned up again NIKA, installed. '''Warm impedance test: 20mbar/min at 3 bar''' Start cooling down at 13h30. Installed the electronics, {{attachment:cryostat_21h30.jpg||width=800}} {{attachment:cryostat_21h30_2.jpg||width=700}} ''figures: NIKA installed again'' | 
Go to preparation run daily reports
Preparation visit before Run6
Daily Reports
Mon 03/06
Left Grenoble by car in the morning. Andrea, Alain, Alessandro. Reached the telescope at 20h30.
Tue 04/06
During the maintenance craned up again NIKA, installed. Warm impedance test: 20mbar/min at 3 bar
Start cooling down at 13h30.
Installed the electronics,
figures: NIKA installed again

![[ATTACH] [ATTACH]](/moin_static1911/modernized/img/attach.png)