|
Size: 856
Comment:
|
Size: 636
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 3: | Line 3: |
| === PreparationRun Sun 12/05 === Left Grenoble by car in the morning, stopped at Calp |
[[PrepRun6|Go to preparation run daily reports]] |
| Line 6: | Line 5: |
| === PreparationRun Mon 13/05 === Arrived at the telescope around 3:30pm. Unloaded the car, installed archeops8, archeops9 and THz in the control room. Updated with SVN. Experiment file for next NIKA run: nika_iram2.txt |
Preparation visit before Run6 |
| Line 9: | Line 7: |
| A few mbars of something in the cryostat (J1=50mbar). | [[NikaRun6|Back to the NIKA run 6]] |
| Line 11: | Line 9: |
| === PreparationRun Tue 14/05 === GISMO electronics is still there. Thus first we'll have to wait that it's craned down before starting working on the cryostat. We re-pump the cryostat and the big pumping pipe before the intervention. Jpi is growing up a bit after pumping; 1e-3mbar per minute roughly. Not very dangerous, could be outgassing, but I have seen better. Could be a small leak at the O-rings. In any case we have to open later. |
=== Daily Reports === === Mon 03/06 === Left Grenoble by car in the morning. Andrea, Alain, Alessandro. Reached the telescope at 20h30. === Tue 04/06 === During the maintenance craned up again NIKA, installed. '''Warm impedance test: 20mbar/min at 3 bar''' Start cooling down at 13h30. Installed the electronics, {{attachment:NIKA_back_1.jpg||width=800}} {{attachment:nika_back_2_2.jpg||width=700}} ''figures: NIKA installed again'' |
Go to preparation run daily reports
Preparation visit before Run6
Daily Reports
Mon 03/06
Left Grenoble by car in the morning. Andrea, Alain, Alessandro. Reached the telescope at 20h30.
Tue 04/06
During the maintenance craned up again NIKA, installed. Warm impedance test: 20mbar/min at 3 bar
Start cooling down at 13h30.
Installed the electronics,
figures: NIKA installed again
