| === PreparationRun Sun 12/05 === Left Grenoble by car in the morning, stopped at Calp |
[[PrepRun6|Go to preparation run daily reports]] |
| Line 6: | Line 5: |
| === PreparationRun Mon 13/05 === Arrived at the telescope around 3:30pm. Unloaded the car, installed archeops8, archeops9 and THz in the control room. Updated with SVN. Experiment file for next NIKA run: nika_iram2.txt |
Preparation visit before Run6 |
| Line 9: | Line 7: |
| A few mbars of something in the cryostat (J1=50mbar). | [[NikaRun6|Back to the NIKA run 6]] |
| Line 11: | Line 9: |
| === PreparationRun Tue 14/05 === GISMO electronics is still there. Thus first we'll have to wait that it's craned down before starting working on the cryostat. The cryostat is pumped before the intervention. Jpi is growing up a bit after pumping; 1e-3mbar per minute roughly. Not very dangerous, could be outgassing. |
=== Daily Reports === === Mon 03/06 === Left Grenoble by car in the morning. Andrea, Alain, Alessandro. Reached the telescope at 20h30. === Tue 04/06 === During the maintenance craned up again NIKA, installed. '''Warm impedance test: 20mbar/min at 3 bar''' Start cooling down at 13h30. Installed the electronics, {{attachment:NIKA_back_1.jpg||width=800}} {{attachment:nika_back_2_2.jpg||width=700}} ''figures: NIKA installed again'' |
Go to preparation run daily reports
Preparation visit before Run6
Daily Reports
Mon 03/06
Left Grenoble by car in the morning. Andrea, Alain, Alessandro. Reached the telescope at 20h30.
Tue 04/06
During the maintenance craned up again NIKA, installed. Warm impedance test: 20mbar/min at 3 bar
Start cooling down at 13h30.
Installed the electronics,
figures: NIKA installed again