Differences between revisions 3 and 9 (spanning 6 versions)
Revision 3 as of 2013-05-14 07:26:00
Size: 354
Comment:
Revision 9 as of 2013-06-04 15:41:53
Size: 811
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
=== PreparationRun Sun 12/05 ===
Left Grenoble by car in the morning, stopped at Calp
[[PrepRun6|Go to preparation run daily reports]]
Line 6: Line 5:
=== PreparationRun Mon 13/05 ===
Arrived at the telescope around 3:30pm. Unloaded the car, installed archeops8, archeops9 and THz in the control room. Updated with SVN. Experiment file for next NIKA run: nika_iram2.txt
Preparation visit before Run6

[[NikaRun6|Back to the NIKA run 6]]



=== Daily Reports ===

=== Mon 03/06 ===
Left Grenoble by car in the morning. Andrea, Alain, Alessandro. Reached the telescope at 20h30.

=== Tue 04/06 ===
During the maintenance craned up again NIKA, installed. '''Warm impedance test: 20mbar/min at 3 bar'''

Start cooling down at 13h30.

Test with VNA at 300K:

{{attachment:VNA_1mm.jpg||width=600}}
{{attachment:VNA_2mm.jpg||width=600}}

''figures: VNA scans at 300K (0-8GHz). Left: 1mm array; right: 2mm array.''

Installed the electronics,

{{attachment:nika_back_1.jpg||width=600}}
{{attachment:NIKA_back_2.jpg||width=600}}

''figures: NIKA installed again''

Back to the NIKA run6 page

Go to preparation run daily reports

Preparation visit before Run6

Back to the NIKA run 6

Daily Reports

Mon 03/06

Left Grenoble by car in the morning. Andrea, Alain, Alessandro. Reached the telescope at 20h30.

Tue 04/06

During the maintenance craned up again NIKA, installed. Warm impedance test: 20mbar/min at 3 bar

Start cooling down at 13h30.

Test with VNA at 300K:

VNA_1mm.jpg VNA_2mm.jpg

figures: VNA scans at 300K (0-8GHz). Left: 1mm array; right: 2mm array.

Installed the electronics,

nika_back_1.jpg NIKA_back_2.jpg

figures: NIKA installed again

DailyReports6 (last edited 2013-06-21 15:48:42 by NikaBolometer)