Differences between revisions 3 and 5 (spanning 2 versions)
Revision 3 as of 2013-05-14 07:26:00
Size: 354
Comment:
Revision 5 as of 2013-05-14 07:40:30
Size: 856
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:

A few mbars of something in the cryostat (J1=50mbar).

=== PreparationRun Tue 14/05 ===
GISMO electronics is still there. Thus first we'll have to wait that it's craned down before starting working on the cryostat. We re-pump the cryostat and the big pumping pipe before the intervention. Jpi is growing up a bit after pumping; 1e-3mbar per minute roughly. Not very dangerous, could be outgassing, but I have seen better. Could be a small leak at the O-rings. In any case we have to open later.

Back to the NIKA run6 page

PreparationRun Sun 12/05

Left Grenoble by car in the morning, stopped at Calp

PreparationRun Mon 13/05

Arrived at the telescope around 3:30pm. Unloaded the car, installed archeops8, archeops9 and THz in the control room. Updated with SVN. Experiment file for next NIKA run: nika_iram2.txt

A few mbars of something in the cryostat (J1=50mbar).

PreparationRun Tue 14/05

GISMO electronics is still there. Thus first we'll have to wait that it's craned down before starting working on the cryostat. We re-pump the cryostat and the big pumping pipe before the intervention. Jpi is growing up a bit after pumping; 1e-3mbar per minute roughly. Not very dangerous, could be outgassing, but I have seen better. Could be a small leak at the O-rings. In any case we have to open later.

DailyReports6 (last edited 2013-06-21 15:48:42 by NikaBolometer)