Size: 311
Comment:
|
Size: 733
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
[[NikaRun6|Back to the NIKA run6 page]] |
|
Line 6: | Line 8: |
A few mbars of something in the cryostat (J1=50mbar). === PreparationRun Tue 14/05 === GISMO electronics is still there. Thus first we'll have to wait that it's craned down before starting working on the cryostat. The cryostat is pumped before the intervention. Jpi is growing up a bit after pumping; 1e-3mbar per minute roughly. Not very dangerous, could be outgassing. |
PreparationRun Sun 12/05
Left Grenoble by car in the morning, stopped at Calp
PreparationRun Mon 13/05
Arrived at the telescope around 3:30pm. Unloaded the car, installed archeops8, archeops9 and THz in the control room. Updated with SVN. Experiment file for next NIKA run: nika_iram2.txt
A few mbars of something in the cryostat (J1=50mbar).
PreparationRun Tue 14/05
GISMO electronics is still there. Thus first we'll have to wait that it's craned down before starting working on the cryostat. The cryostat is pumped before the intervention. Jpi is growing up a bit after pumping; 1e-3mbar per minute roughly. Not very dangerous, could be outgassing.