Differences between revisions 9 and 14 (spanning 5 versions)
Revision 9 as of 2015-02-24 19:28:30
Size: 539
Editor: dhcp-185
Comment:
Revision 14 as of 2015-02-25 15:24:28
Size: 809
Editor: dhcp-185
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
 * '''16:30 UT''': Subreflector in place after the holography session. GISMO tunning done succesfully.  * '''16:30 UT''': Subreflector in place after the holography session. GISMO tuning done successfully.
Line 13: Line 13:
 * '''17:30 UT''': Pointing on Uranus: FWHM=19.6", Flux=16.7 Jy. Starting the observations.
 * '''20:00 UT''': Smooth observations of project 223-14 (SZ). Now changing to project 232-14 (COSMO)
 * '''17:30 UT''': Pointing on Uranus: FWHM=19.6", Flux=16.7 Jy. Starting the observations of project 223-14 (SZ).
 * '''20:00 UT''': Stopped due to bad weather conditions.



=== Wed 25th Feb ===

 * '''05:00 UT''': Resuming the observations. Wind close to the limit.
 * '''12:00 UT''': Stopped due to bad weather (tau~0.5). Starting the recycling.
 * '''14:30 UT''': The helium bath did not reach its temperature of operation. Sending again the pulse...

7th GISMO Pool Daily Log

Go to the GISMO Main Page


Tue 24th Feb

  • 16:30 UT: Subreflector in place after the holography session. GISMO tuning done successfully.

  • 17:00 UT: Focus corrections checked: Fz=-1.5, Fx=-0.4, Fy=0.0

  • 17:30 UT: Pointing on Uranus: FWHM=19.6", Flux=16.7 Jy. Starting the observations of project 223-14 (SZ).

  • 20:00 UT: Stopped due to bad weather conditions.

Wed 25th Feb

  • 05:00 UT: Resuming the observations. Wind close to the limit.

  • 12:00 UT: Stopped due to bad weather (tau~0.5). Starting the recycling.

  • 14:30 UT: The helium bath did not reach its temperature of operation. Sending again the pulse...

Continuum/PoolLogs/7thGISMOpool (last edited 2015-03-04 08:28:16 by gra-fw)