=== Sun 1st Mar ===

 * '''11:00 UT''': Recycling. Some discrepancies between Johannes' instructions (crate and tower must be switched off during the whole process) and the ones given to the operators (switch off the crate during the refilling).

=== Mon 2nd Mar ===

 * '''06:00 UT''': GRB triggered! Unfortunately, the opacity was too high (0.5) and the elevation too low (<30). Raw data was sent to Attila to check if something can be done.

7th GISMO Pool daily logs

Go to the GISMO Main Page


Tue 24th Feb

  • 16:30 UT: Subreflector in place after the holography session. GISMO tuning done successfully.

  • 17:00 UT: Focus corrections checked: Fz=-1.5, Fx=-0.4, Fy=0.0

  • 17:30 UT: Pointing on Uranus: FWHM=19.6", Flux=16.7 Jy. Starting the observations of project 223-14 (SZ).

  • 20:00 UT: Stopped due to bad weather conditions.

Wed 25th Feb

  • 05:00 UT: Resuming the observations. Wind close to the limit.

  • 12:00 UT: Stopped due to bad weather (high wind, thick clouds).

  • 14:30 UT: Problems during the recycling with the He heater pump. The detectors did not reach their temperature of operation. Apparently the cause was some missconnected cable.

Thu 26th Feb

  • 15:00 UT: Resuming the observations.

  • 17:00 UT: Stopping again due to bad weather.

  • 21:00 UT: Resuming the observations.

Fri 27th Feb

  • 12:00 UT: Recycling.

  • 14:00 UT: Recycling done. Resuming the observations.

  • 17:00 UT: Stopped due to high wind.

  • 23:00 UT: Observing again.

Sat 28th Feb

  • 01:00 UT: Stopped (tau~1).

  • 07:00 UT: Observing.

  • 10:00 UT: Recycling.

  • 12:30 UT: Recycling done. Resuming the observations under poor conditions.

Sun 1st Mar

  • 11:00 UT: Recycling. Some discrepancies between Johannes' instructions (crate and tower must be switched off during the whole process) and the ones given to the operators (switch off the crate during the refilling).

Mon 2nd Mar

  • 06:00 UT: GRB triggered! Unfortunately, the opacity was too high (0.5) and the elevation too low (<30). Raw data was sent to Attila to check if something can be done.

Continuum/PoolLogs/7thGISMOpool (last edited 2015-03-04 08:28:16 by gra-fw)