Differences between revisions 27 and 28
Revision 27 as of 2015-02-28 12:48:40
Size: 1452
Editor: dhcp-185
Comment:
Revision 28 as of 2015-02-28 14:47:44
Size: 1474
Editor: dhcp-185
Comment:
Deletions are marked like this. Additions are marked like this.
Line 44: Line 44:
 * '''12:30 UT''': Recycling done. Resuming the observations.  * '''12:30 UT''': Recycling done. Resuming the observations under poor conditions.

7th GISMO Pool daily logs

Go to the GISMO Main Page


Tue 24th Feb

  • 16:30 UT: Subreflector in place after the holography session. GISMO tuning done successfully.

  • 17:00 UT: Focus corrections checked: Fz=-1.5, Fx=-0.4, Fy=0.0

  • 17:30 UT: Pointing on Uranus: FWHM=19.6", Flux=16.7 Jy. Starting the observations of project 223-14 (SZ).

  • 20:00 UT: Stopped due to bad weather conditions.

Wed 25th Feb

  • 05:00 UT: Resuming the observations. Wind close to the limit.

  • 12:00 UT: Stopped due to bad weather (high wind, thick clouds).

  • 14:30 UT: Problems during the recycling with the He heater pump. The detectors did not reach their temperature of operation. Apparently the cause was some missconnected cable.

Thu 26th Feb

  • 15:00 UT: Resuming the observations.

  • 17:00 UT: Stopping again due to bad weather.

  • 21:00 UT: Resuming the observations.

Fri 27th Feb

  • 12:00 UT: Recycling.

  • 14:00 UT: Recycling done. Resuming the observations.

  • 17:00 UT: Stopped due to high wind.

  • 23:00 UT: Observing again.

Sat 28th Feb

  • 01:00 UT: Stopped (tau~1).

  • 07:00 UT: Observing.

  • 10:00 UT: Recycling.

  • 12:30 UT: Recycling done. Resuming the observations under poor conditions.

Continuum/PoolLogs/7thGISMOpool (last edited 2015-03-04 08:28:16 by gra-fw)