Differences between revisions 24 and 25
Revision 24 as of 2015-02-28 01:57:57
Size: 1275
Editor: dhcp-185
Comment:
Revision 25 as of 2015-02-28 02:03:52
Size: 1327
Editor: dhcp-185
Comment:
Deletions are marked like this. Additions are marked like this.
Line 22: Line 22:
 * '''14:30 UT''': Problems during the recycling with the He heater pump. The detectors did not reach their temperature of operation.  * '''14:30 UT''': Problems during the recycling with the He heater pump. The detectors did not reach their temperature of operation. Apparently the cause was some missconnected cable.

7th GISMO Pool daily logs

Go to the GISMO Main Page


Tue 24th Feb

  • 16:30 UT: Subreflector in place after the holography session. GISMO tuning done successfully.

  • 17:00 UT: Focus corrections checked: Fz=-1.5, Fx=-0.4, Fy=0.0

  • 17:30 UT: Pointing on Uranus: FWHM=19.6", Flux=16.7 Jy. Starting the observations of project 223-14 (SZ).

  • 20:00 UT: Stopped due to bad weather conditions.

Wed 25th Feb

  • 05:00 UT: Resuming the observations. Wind close to the limit.

  • 12:00 UT: Stopped due to bad weather (high wind, thick clouds).

  • 14:30 UT: Problems during the recycling with the He heater pump. The detectors did not reach their temperature of operation. Apparently the cause was some missconnected cable.

Thu 26th Feb

  • 15:00 UT: Resuming the observations.

  • 17:00 UT: Stopping again due to bad weather.

  • 21:00 UT: Resuming the observations.

Fri 27th Feb

  • 12:00 UT: Recycling.

  • 14:00 UT: Recycling done. Resuming the observations.

  • 17:00 UT: Stopped due to high wind.

  • 23:00 UT: Observing again.

Sat 28th Feb

  • 01:00 UT: Stopped (tau~1).

Continuum/PoolLogs/7thGISMOpool (last edited 2015-03-04 08:28:16 by gra-fw)