837
Comment:
|
1127
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
= 7th GISMO Pool Daily Log = | = 7th GISMO Pool daily logs = |
Line 21: | Line 21: |
* '''12:00 UT''': Stopped due to bad weather (tau~0.5). Starting the recycling. | * '''12:00 UT''': Stopped due to bad weather (high wind, thick clouds). |
Line 23: | Line 23: |
=== Thu 26th Feb === * '''15:00 UT''': Resuming the observations. * '''17:00 UT''': Stopping again due to bad weather. * '''21:00 UT''': Resuming the observations. === Fri 27th Feb === * '''12:00 UT''': Recycling. * '''14:00 UT''': Recycling done. Resuming the observations. |
7th GISMO Pool daily logs
Tue 24th Feb
16:30 UT: Subreflector in place after the holography session. GISMO tuning done successfully.
17:00 UT: Focus corrections checked: Fz=-1.5, Fx=-0.4, Fy=0.0
17:30 UT: Pointing on Uranus: FWHM=19.6", Flux=16.7 Jy. Starting the observations of project 223-14 (SZ).
20:00 UT: Stopped due to bad weather conditions.
Wed 25th Feb
05:00 UT: Resuming the observations. Wind close to the limit.
12:00 UT: Stopped due to bad weather (high wind, thick clouds).
14:30 UT: Problems during the recycling with the He heater pump. The detectors did not reach their temperature of operation.
Thu 26th Feb
15:00 UT: Resuming the observations.
17:00 UT: Stopping again due to bad weather.
21:00 UT: Resuming the observations.
Fri 27th Feb
12:00 UT: Recycling.
14:00 UT: Recycling done. Resuming the observations.