Differences between revisions 15 and 16
Revision 15 as of 2015-02-25 16:34:40
Size: 832
Editor: dhcp-185
Comment:
Revision 16 as of 2015-02-25 16:35:22
Size: 837
Editor: dhcp-185
Comment:
Deletions are marked like this. Additions are marked like this.
Line 22: Line 22:
 * '''14:30 UT''': Problems during the recycling with the He heater. The detectors did not reach their temperature of operation.  * '''14:30 UT''': Problems during the recycling with the He heater pump. The detectors did not reach their temperature of operation.

7th GISMO Pool Daily Log

Go to the GISMO Main Page


Tue 24th Feb

  • 16:30 UT: Subreflector in place after the holography session. GISMO tuning done successfully.

  • 17:00 UT: Focus corrections checked: Fz=-1.5, Fx=-0.4, Fy=0.0

  • 17:30 UT: Pointing on Uranus: FWHM=19.6", Flux=16.7 Jy. Starting the observations of project 223-14 (SZ).

  • 20:00 UT: Stopped due to bad weather conditions.

Wed 25th Feb

  • 05:00 UT: Resuming the observations. Wind close to the limit.

  • 12:00 UT: Stopped due to bad weather (tau~0.5). Starting the recycling.

  • 14:30 UT: Problems during the recycling with the He heater pump. The detectors did not reach their temperature of operation.

Continuum/PoolLogs/7thGISMOpool (last edited 2015-03-04 08:28:16 by gra-fw)