Differences between revisions 13 and 18 (spanning 5 versions)
Revision 13 as of 2015-02-25 14:07:54
Size: 750
Editor: dhcp-185
Comment:
Revision 18 as of 2015-02-25 20:20:26
Size: 829
Editor: dhcp-185
Comment:
Deletions are marked like this. Additions are marked like this.
Line 21: Line 21:
 * '''12:00 UT''': Starting the recycling.
 * '''14:30 UT''': Recycling done successfully. Stopped due to bad weather (tau~0.5)
 * '''12:00 UT''': Stopped due to bad weather (high wind, thick clouds).
 * '''14:30 UT''': Problems during the recycling with the He heater pump. The detectors did not reach their temperature of operation.

7th GISMO Pool Daily Log

Go to the GISMO Main Page


Tue 24th Feb

  • 16:30 UT: Subreflector in place after the holography session. GISMO tuning done successfully.

  • 17:00 UT: Focus corrections checked: Fz=-1.5, Fx=-0.4, Fy=0.0

  • 17:30 UT: Pointing on Uranus: FWHM=19.6", Flux=16.7 Jy. Starting the observations of project 223-14 (SZ).

  • 20:00 UT: Stopped due to bad weather conditions.

Wed 25th Feb

  • 05:00 UT: Resuming the observations. Wind close to the limit.

  • 12:00 UT: Stopped due to bad weather (high wind, thick clouds).

  • 14:30 UT: Problems during the recycling with the He heater pump. The detectors did not reach their temperature of operation.

Continuum/PoolLogs/7thGISMOpool (last edited 2015-03-04 08:28:16 by gra-fw)