Size: 294
Comment:
|
Size: 1452
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
= 7th GISMO Pool Daily Log = | = 7th GISMO Pool daily logs = |
Line 9: | Line 9: |
== Tue 24th Feb == | === Tue 24th Feb === |
Line 11: | Line 11: |
* 16:30 UT: Subreflector is in place after the holography session. GISMO tunning done succesfully. Starting the observations. | * '''16:30 UT''': Subreflector in place after the holography session. GISMO tuning done successfully. * '''17:00 UT''': Focus corrections checked: Fz=-1.5, Fx=-0.4, Fy=0.0 * '''17:30 UT''': Pointing on Uranus: FWHM=19.6", Flux=16.7 Jy. Starting the observations of project 223-14 (SZ). * '''20:00 UT''': Stopped due to bad weather conditions. === Wed 25th Feb === * '''05:00 UT''': Resuming the observations. Wind close to the limit. * '''12:00 UT''': Stopped due to bad weather (high wind, thick clouds). * '''14:30 UT''': Problems during the recycling with the He heater pump. The detectors did not reach their temperature of operation. Apparently the cause was some missconnected cable. === Thu 26th Feb === * '''15:00 UT''': Resuming the observations. * '''17:00 UT''': Stopping again due to bad weather. * '''21:00 UT''': Resuming the observations. === Fri 27th Feb === * '''12:00 UT''': Recycling. * '''14:00 UT''': Recycling done. Resuming the observations. * '''17:00 UT''': Stopped due to high wind. * '''23:00 UT''': Observing again. === Sat 28th Feb === * '''01:00 UT''': Stopped (tau~1). * '''07:00 UT''': Observing. * '''10:00 UT''': Recycling. * '''12:30 UT''': Recycling done. Resuming the observations. |
7th GISMO Pool daily logs
Tue 24th Feb
16:30 UT: Subreflector in place after the holography session. GISMO tuning done successfully.
17:00 UT: Focus corrections checked: Fz=-1.5, Fx=-0.4, Fy=0.0
17:30 UT: Pointing on Uranus: FWHM=19.6", Flux=16.7 Jy. Starting the observations of project 223-14 (SZ).
20:00 UT: Stopped due to bad weather conditions.
Wed 25th Feb
05:00 UT: Resuming the observations. Wind close to the limit.
12:00 UT: Stopped due to bad weather (high wind, thick clouds).
14:30 UT: Problems during the recycling with the He heater pump. The detectors did not reach their temperature of operation. Apparently the cause was some missconnected cable.
Thu 26th Feb
15:00 UT: Resuming the observations.
17:00 UT: Stopping again due to bad weather.
21:00 UT: Resuming the observations.
Fri 27th Feb
12:00 UT: Recycling.
14:00 UT: Recycling done. Resuming the observations.
17:00 UT: Stopped due to high wind.
23:00 UT: Observing again.
Sat 28th Feb
01:00 UT: Stopped (tau~1).
07:00 UT: Observing.
10:00 UT: Recycling.
12:30 UT: Recycling done. Resuming the observations.