Differences between revisions 1 and 18 (spanning 17 versions)
Revision 1 as of 2015-02-24 16:47:23
Size: 294
Editor: mrt-lx7
Comment:
Revision 18 as of 2015-02-25 20:20:26
Size: 829
Editor: dhcp-185
Comment:
Deletions are marked like this. Additions are marked like this.
Line 9: Line 9:
== Tue 24th Feb == === Tue 24th Feb ===
Line 11: Line 11:
 * 16:30 UT: Subreflector is in place after the holography session. GISMO tunning done succesfully. Starting the observations.  * '''16:30 UT''': Subreflector in place after the holography session. GISMO tuning done successfully.
 * '''17:00 UT''': Focus corrections checked: Fz=-1.5, Fx=-0.4, Fy=0.0
 * '''17:30 UT''': Pointing on Uranus: FWHM=19.6", Flux=16.7 Jy. Starting the observations of project 223-14 (SZ).
 * '''20:00 UT''': Stopped due to bad weather conditions.



=== Wed 25th Feb ===

 * '''05:00 UT''': Resuming the observations. Wind close to the limit.
 * '''12:00 UT''': Stopped due to bad weather (high wind, thick clouds).
 * '''14:30 UT''': Problems during the recycling with the He heater pump. The detectors did not reach their temperature of operation.

7th GISMO Pool Daily Log

Go to the GISMO Main Page


Tue 24th Feb

  • 16:30 UT: Subreflector in place after the holography session. GISMO tuning done successfully.

  • 17:00 UT: Focus corrections checked: Fz=-1.5, Fx=-0.4, Fy=0.0

  • 17:30 UT: Pointing on Uranus: FWHM=19.6", Flux=16.7 Jy. Starting the observations of project 223-14 (SZ).

  • 20:00 UT: Stopped due to bad weather conditions.

Wed 25th Feb

  • 05:00 UT: Resuming the observations. Wind close to the limit.

  • 12:00 UT: Stopped due to bad weather (high wind, thick clouds).

  • 14:30 UT: Problems during the recycling with the He heater pump. The detectors did not reach their temperature of operation.

Continuum/PoolLogs/7thGISMOpool (last edited 2015-03-04 08:28:16 by gra-fw)