Pool Observations

From our experience, the chances of success of a program are higher if it is scheduled in a pool than in the traditional way of dedicated observing blocks. This is due to the flexibility of pooled observations with respect to demand on weather quality and equipment availability. It is therefore advantageous for any project to participate in these pooled observing sessions. Participation is of additional interest for low rated proposals which may otherwise not be scheduled. Astronomers with little or no experience are welcome as observers at the IRAM 30m radiotelescope.

Go to the NIKA2 main page.


Pool Logistics

Pool observations are carried from a dedicated pool account (ask the AoD for the login information). Each project has a folder within the home directory of the pool account with instructions on how to proceed. Read carefully the README file before to start. For example, see the file ~/001-17/README_001-17.txt.

Choose a project

First log into the Pool data base (ask the AoD for the login information) and click on the NIKA2 tab.

[ATTACH]

Projects have different priorities from 6 (highest priority) to 1 (lowest priority). Green color indicates that the project is scheduled, orange that the project is on hold, and red that the project is finished. Only green projects should be observed. To check the visibility of these projects go to the visibility tab:

[ATTACH]

The red vertical line corresponds to the current time (UT). In case that none of the priority 5 projects have weather requirements (see the README files) compatible with the current conditions, go for priority 4 projects and so on.

Below are some plots of (1) 3 faint point sources, to validate the NIKA2's instrumental ability to detect weak continuum sources @260 GHz, (2) Solar System Objects, (3) All secondary calibrators listed here: http://www.iram.es/IRAMES/mainWiki/Continuum/Calibrators#preview.

[ATTACH] [ATTACH] [ATTACH]

Project setup

The standard method to set the project is:

PAKO> set project XXX-YY

However, for pooled observations this is often done using a setup script (see for example setup_001-17.pako). For example, before to start to observe the project 001-17 you should type:

PAKO> @ ~/001-17/setup_001-17.pako

It is IMPORTANT to set the project accordingly before each observation in order to identify the scans observed for each project, keep control on the time used to observe each project, and write the data files in the right directory. When you will be doing tests, or if you have to stop by wind, or whatever, just type set project test. That way, no project will loose time due to technical problems, or bad weather.

Catalog of sources

Before to start to observe a certain project it is necessary to load its catalog of sources. Usually, this is automatically done within the setup script. If for some reason you need to load the catalog manually, type:

PAKO> SOURCE CATALOG  001-17.sou

This command will load the catalog 001-17.sou with the position of NGC4449. To select this source, just type:

PAKO> source NGC4449

To select a source from the IRAM catalog of pointing sources, just type:

PAKO> source pointing_source /cat * (or "iram-J2000.sou" for the given catalog)


Scripts preparation

Pooled observations should be fairly simple and straightforward to observe. Note that your project will NOT be observed in case you do not send your observing instructions to the NIKA2 Pool Manager before the begin of the pool. It is highly recommended to use the standard scripts provided by the IRAM staff:

README_001-17.txt

setup_001-17.pako

001-17.sou

observe_NGC4449.pako

You can download these example scripts and adapt them to your project. If you have questions please contact the pool manager.


Pointing Sources

It is possible to select pointing sources nearby to your science targets using XEphem and the IRAM 30m Catalog for Continuum Cameras.


Observing modes

We offer the on-the-fly (OTF) observing mode for the NIKA2 camera where data are taken continuously while the telescope follows a zig-zag pattern. The mode can be commanded as follows:

PAKO> @ nkotf xSize ySize posAngle tiltAngle otfStep otfSpeed System 

where xSize and ySize are the size of the otf map in arcminutes, posAngle determines the angle of the scanning direction (anti-clockwise), tiltAngle determines the inclination of the scanning direction (anti-clockwise, useful to map filaments), otfStep is the spacing between OTF lines, otfSpeed is used to set the scanning speed (in arcseconds/sec), and System set the reference coordinate system (radec or azel). The nkotf command allows to generate plenty of different scanning patterns. In the following, some examples are shown.

PAKO> @ nkotf 5 5 0 0 20 40 azel 

[ATTACH]

PAKO> @ nkotf 8 8 45 0 20 40 radec

[ATTACH]

PAKO> @ nkotf 2 12 30 +30 20 40 radec
PAKO> @ nkotf 2 12 30 -30 20 40 radec

[ATTACH]

Contact:

Alessia Ritacco (NIKA2 Pool Manager of the first open pool)

Bilal Ladjelate (NIKA2 Pool Manager of the upcoming open pools)

email:

ritaccoa@iram.es

ladjelate@iram.es

Created: 2013.OCT.25, H. Hermelo

Last update: 2017.FEB.05, P. GarcĂ­a

Last update: 2017.SEP.28, A. Ritacco

Continuum/ObservingSessions17 (last edited 2018-01-11 12:58:44 by ladjelate)