Size: 5870
Comment:
|
Size: 5377
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 7: | Line 7: |
'''[[ http://www.iram.es/IRAMES/mainWiki/FrontPage | Go to the Front Page ]]''' | '''[[ http://www.iram.es/IRAMES/mainWiki/Continuum/NIKA2/Main | Go to the Front Page ]]''' |
Line 37: | Line 37: |
Line 40: | Line 41: |
Line 47: | Line 49: |
Line 78: | Line 81: |
* Robert Zylka * Walter Brunswig |
|
Line 91: | Line 91: |
* For observers: [[attachment:NIKA_status.pdf | Check the staus of NIKA during the observations]]. * For Experts: [[http://www.iram.es/IRAMES/mainWiki/Continuum/NIKA/PointingSession | Alignment and pointing sesion ]] (in prep.) provides a step-by-step procedure to implement a new pointing model with NIKA * [[http://www.iram.es/IRAMES/mainWiki/Continuum/NIKA/DataReduction | Data Reduction]] Quick look analysis and Offline processing products. |
|
Line 124: | Line 118: |
* [[http://www.iram.es/IRAMES/mainWiki/Continuum/NIKA2/Commissioning | Go to the NIKA2 commissioning wiki]] | [[http://www.iram.es/IRAMES/mainWiki/Continuum/NIKA2/Commissioning | Go to the NIKA2 commissioning wiki]] |
Line 128: | Line 122: |
* [[http://www.iram.es/IRAMES/mainWiki/Continuum/NIKA2/Installation | Go to the NIKA2 installation wiki]] | [[http://www.iram.es/IRAMES/mainWiki/Continuum/NIKA2/Installation | Go to the NIKA2 installation wiki]] |
NIKA2
The New Instrument of Kids Arrays (NIKA2) is the next generation continuum instrument to be placed at the 30m telescope of IRAM, at Pico Veleta (Spain). The instrument is based on Kinetic Inductance Detectors (KIDS). The baseline detector focal plane units consist of 1000 detectors at 2 mm and 4000 detectors at 1.25 mm. The instrument will provide the measurement of the linear polarization at 1.25 mm.
Contents
Overview
The main characteristics of the latest configuration (2015.AUG.05) are summarized on the following table.
Band |
Number of KIDs |
Wavelength |
Bandwidth |
NEFD |
HPBW |
FoV |
NIKA 2 mm |
1000 |
2.0 mm |
xxx GHz |
10 mJy*s1/2 |
18.5" |
6.5' |
NIKA 1 mm |
2x2000 |
1.2 mm |
xxx GHz |
15 mJy*s1/2 |
11.0" |
6.5' |
Call for proposals
Coming soon:
Reports and Publications
- Reports:
- Technical papers:
Catalano, A., Goupy, J., Le Sueur, H., et al, 2015, A&A submitted
- Monfardini, A., Adam, R., Adane, A., et al, 2014, JLTP, Vol. 176, Issue 5-6, pp. 787-795
- Bourrion, O., Vescovi, C., Catalano, A. et al, 2013, Journ. of Instr., Vol. 8, Issue 12, article id. C12006
- Bourrion, O., Vescovi, C., Bouly J.-L. et al, 2012, Journ. of Instr., Vol. 7, Issue 07, pp. 7014
- Bourrion, O., Bideaud, A., Benoit, A., et al, 2011, Journ. of Instr., Vol. 6, Issue 06, pp. 6012
- Astronomical papers:
Adam, A., Comis, B., Macias-Perez, J.-F., et al, 2015, A&A, 576, A12
Catalano, A., Ponthieu, N., Calvo M., et al, 2014, A&A, 569, A9
Adam, R., Comis, B., Macias-Perez, J.-F, et al, 2014, A&A in press
Calvo, M., Roesh, M., Désert, F.-X., et al, 2013, A&A, 551, L12
Monfardini, A., Benoit, A., Bideaud, A., et al, 2011, ApJs, 194, 24
- Monfardini, A., Swenson, L. J., Bideaud, A., et al, 2010, AAp, 521, A29
Support teams
- Overall coordinator:
Samuel Leclercq (IRAM/Grenoble, <leclercq@iram.fr>)
- NIKA team:
Alain Benoit <alain.benoit@grenoble.cnrs.fr> (PI, IN)
Alessandro Monfardini <monfardini@grenoble.cnrs.fr> (co-PI, IN)
François-Xavier Désert <francois-xavier.desert@obs.ujf-grenoble.fr> (IPAG)
Martino Calvo <martino.calvo@grenoble.cnrs.fr> (IN)
Antonio D'Addabbo <antonio.d-addabbo@grenoble.cnrs.fr> (IN)
- Nicolas Ponthieu (IPAG)
Juan Macias-Perez <macias@lpsc.in2p3.fr> (LPSC)
Andrea Catalano <catalano@lpsc.in2p3.fr> (LPSC)
Remi Adam <adam@lpsc.in2p3.fr> (LPSC)
- IRAM/Granada support team:
Carsten Kramer (Station Manager, <kramer@iram.es>)
Israel Hermelo (30m Continuum Pool Manager, <hermelo@iram.es>)
Nicolas Billot (30m Scheduler, <billot@iram.es>)
Claudia Marka (30m Heterodyne Pool Manager, <marka@iram.es>)
Albrecht Sievers (<sievers@iram.es>)
How-to's
Pool Preparation provides information on the observing modes offered for the continuum cameras as well as examples of the scripts that you need to prepare to observe your project.
Observing Session provides an example of a typical session with the continuum cameras at the 30m telescope.
Pointing sources and calibrators provides a list of pointing sources and calibrators for the IRAM 30m continuum cameras.
Open runs
1st NIKA2 pool (coming soon)
For information about the accepted projects and the observers at the 30m please go to:
The progress of the pool can be followed via:
Both databases are synchronized and can be used to write/read the logsheet.
Technical runs
Commissioning (October 2015)
Go to the NIKA2 commissioning wiki
Installation (September 2015)
Go to the NIKA2 installation wiki
Author: Israel Hermelo (IRAM 30m continuum pool manager)
email: hermelo@iram.es
Created: 2015.AUG.05
This page is maintained by IH, CK, SL and the NIKA team
Last update: 2015.AUG.05