Size: 5707
Comment:
|
Size: 7236
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
= NIKA2 Homagepage = | = NIKA2 Homepage = |
Line 3: | Line 3: |
The New Instrument of Kids Arrays (NIKA2) is the next generation continuum instrument at the IRAM 30m telescope, at Pico Veleta (Spain). The instrument is based on Kinetic Inductance Detectors (KID). The instrument will allow to measure linear polarizations at 1.15 mm. | NIKA2, the second generation Neel-IRAM-KID-Array, is a dual band camera operating simultaneously at 150 and 260 GHz. The instrument is based on large arrays of superconducting Kinetic Inductance Detectors (KID) operated at temperatures of 100mK. NIKA2 is built by an international consortium, led by the Institute Neel (Grenoble France). Successful installation took place in early October 2015. NIKA2's field of view has a 6.5arcmin diameter, with angular resolutions of 12 and 18 arcsec at 1 and 2 mm wavelengths respectively. NIKA2 is designed as a facility instrument which will remain at its present position for at least a decade. The instrument will allow to measure linear polarizations at 1.15 mm. |
Line 13: | Line 14: |
Somre prelimiary characteristics of NIKA-2: | Some prelimiary characteristics of NIKA-2: |
Line 54: | Line 55: |
---- == Publications == * Technical papers: * [[http://www.iram.fr/wiki/nika2/index.php/Technical_NIKA_papers_to_be_cited|Technical NIKA papers to be cited]] * [[http://arxiv.org/abs/1601.02774|Calvo, Benoit, et al. 2015, Proc. of the 16th Low Temperature Detectors workshop. To be published in the Journal of Low Temperature Physics]] 'The NIKA2 instrument, a dual-band kilopixel KID array for millimetric astronomy' * Catalano, A., Goupy, J., Le Sueur, H., et al, 2015, A&A submitted * Monfardini, A., Adam, R., Adane, A., et al, 2014, JLTP, Vol. 176, Issue 5-6, pp. 787-795 * Bourrion, O., Vescovi, C., Catalano, A. et al, 2013, Journ. of Instr., Vol. 8, Issue 12, article id. C12006 * Bourrion, O., Vescovi, C., Bouly J.-L. et al, 2012, Journ. of Instr., Vol. 7, Issue 07, pp. 7014 * Bourrion, O., Bideaud, A., Benoit, A., et al, 2011, Journ. of Instr., Vol. 6, Issue 06, pp. 6012 * Astronomical papers: * Adam, A., Comis, B., Macias-Perez, J.-F., et al, 2015, A&A, 576, A12 * Catalano, A., Ponthieu, N., Calvo M., et al, 2014, A&A, 569, A9 * Adam, R., Comis, B., Macias-Perez, J.-F, et al, 2014, A&A in press * Calvo, M., Roesh, M., Désert, F.-X., et al, 2013, A&A, 551, L12 * Monfardini, A., Benoit, A., Bideaud, A., et al, 2011, ApJs, 194, 24 * Monfardini, A., Swenson, L. J., Bideaud, A., et al, 2010, AAp, 521, A29 |
|
Line 75: | Line 99: |
* '''1st test run''' (29-October-2015 till 10-November-2015: Installation, cool down at the 30m, testing/debugging/developing) | * '''1^st^ test run of NIKA2''' (29-October-2015 till 10-November-2015: Installation, cool down at the 30m, testing/debugging/developing) [= Run 13 of a NIKA instrument] |
Line 79: | Line 103: |
== Publications on NIKA-1 == | * '''2^nd^ test run of NIKA2''' (24-November-2015 till 02-December-2015: continue tests started during run 1, in particular Beam maps and NEFD with the 13 NIKEL boards assembled the last days of run 1) [= Run 14 of a NIKA instrument] * [[Nika2Run2|Go to the 2nd run Wiki page]] |
Line 81: | Line 106: |
* Technical papers: | * '''3^rd^ test run of NIKA2''' (12-January-2016 till 01-February-2016: Implementation of new NIKEL boards; the 20 data lines of NIKA2 are foreseen to be plugged simultaneously. With the 3 arrays fully read, continue and redo tests started with runs 1 & 2, in particular '''Beam maps''' and NEFD. [= Run 15 of a NIKA instrument] * [[Nika2Run3|Go to the 3rd run Wiki page]] |
Line 83: | Line 109: |
* Catalano, A., Goupy, J., Le Sueur, H., et al, 2015, A&A submitted * Monfardini, A., Adam, R., Adane, A., et al, 2014, JLTP, Vol. 176, Issue 5-6, pp. 787-795 * Bourrion, O., Vescovi, C., Catalano, A. et al, 2013, Journ. of Instr., Vol. 8, Issue 12, article id. C12006 * Bourrion, O., Vescovi, C., Bouly J.-L. et al, 2012, Journ. of Instr., Vol. 7, Issue 07, pp. 7014 * Bourrion, O., Bideaud, A., Benoit, A., et al, 2011, Journ. of Instr., Vol. 6, Issue 06, pp. 6012 |
|
Line 89: | Line 110: |
* Astronomical papers: | |
Line 91: | Line 111: |
* Adam, A., Comis, B., Macias-Perez, J.-F., et al, 2015, A&A, 576, A12 * Catalano, A., Ponthieu, N., Calvo M., et al, 2014, A&A, 569, A9 * Adam, R., Comis, B., Macias-Perez, J.-F, et al, 2014, A&A in press * Calvo, M., Roesh, M., Désert, F.-X., et al, 2013, A&A, 551, L12 * Monfardini, A., Benoit, A., Bideaud, A., et al, 2011, ApJs, 194, 24 * Monfardini, A., Swenson, L. J., Bideaud, A., et al, 2010, AAp, 521, A29 |
NIKA2 Homepage
NIKA2, the second generation Neel-IRAM-KID-Array, is a dual band camera operating simultaneously at 150 and 260 GHz. The instrument is based on large arrays of superconducting Kinetic Inductance Detectors (KID) operated at temperatures of 100mK. NIKA2 is built by an international consortium, led by the Institute Neel (Grenoble France). Successful installation took place in early October 2015. NIKA2's field of view has a 6.5arcmin diameter, with angular resolutions of 12 and 18 arcsec at 1 and 2 mm wavelengths respectively. NIKA2 is designed as a facility instrument which will remain at its present position for at least a decade. The instrument will allow to measure linear polarizations at 1.15 mm.
Overview
Some prelimiary characteristics of NIKA-2:
Band |
Number of KIDs |
Wavelength |
Bandwidth |
NEFD (goal, TBC) |
HPBW |
FoV |
NIKA2 2 mm/150 GHz |
1020 |
2.00 mm |
125-170 GHz |
TBC mJy*s1/2 |
TBC |
6.5' |
NIKA2 1 mm/260 GHz |
2x1140 |
1.15 mm |
240-280 GHz |
TBC mJy*s1/2 |
TBC |
6.5' |
- Web information in France:
Technical Documentation
- Wiki-pages:
Pool Preparation provides information on the observing modes offered for NIKA2 and examples of the scripts that you must prepare to observe your project.
Observing Session provides an example of a typical session with NIKA2 at the 30m telescope.
Pointing sources and calibrators provides a list of pointing sources and calibrators.
Publications
- Technical papers:
Calvo, Benoit, et al. 2015, Proc. of the 16th Low Temperature Detectors workshop. To be published in the Journal of Low Temperature Physics 'The NIKA2 instrument, a dual-band kilopixel KID array for millimetric astronomy'
Catalano, A., Goupy, J., Le Sueur, H., et al, 2015, A&A submitted
- Monfardini, A., Adam, R., Adane, A., et al, 2014, JLTP, Vol. 176, Issue 5-6, pp. 787-795
- Bourrion, O., Vescovi, C., Catalano, A. et al, 2013, Journ. of Instr., Vol. 8, Issue 12, article id. C12006
- Bourrion, O., Vescovi, C., Bouly J.-L. et al, 2012, Journ. of Instr., Vol. 7, Issue 07, pp. 7014
- Bourrion, O., Bideaud, A., Benoit, A., et al, 2011, Journ. of Instr., Vol. 6, Issue 06, pp. 6012
- Astronomical papers:
Adam, A., Comis, B., Macias-Perez, J.-F., et al, 2015, A&A, 576, A12
Catalano, A., Ponthieu, N., Calvo M., et al, 2014, A&A, 569, A9
Adam, R., Comis, B., Macias-Perez, J.-F, et al, 2014, A&A in press
Calvo, M., Roesh, M., Désert, F.-X., et al, 2013, A&A, 551, L12
Monfardini, A., Benoit, A., Bideaud, A., et al, 2011, ApJs, 194, 24
- Monfardini, A., Swenson, L. J., Bideaud, A., et al, 2010, AAp, 521, A29
Technical runs
1st test run of NIKA2 (29-October-2015 till 10-November-2015: Installation, cool down at the 30m, testing/debugging/developing) [= Run 13 of a NIKA instrument]
2nd test run of NIKA2 (24-November-2015 till 02-December-2015: continue tests started during run 1, in particular Beam maps and NEFD with the 13 NIKEL boards assembled the last days of run 1) [= Run 14 of a NIKA instrument]
3rd test run of NIKA2 (12-January-2016 till 01-February-2016: Implementation of new NIKEL boards; the 20 data lines of NIKA2 are foreseen to be plugged simultaneously. With the 3 arrays fully read, continue and redo tests started with runs 1 & 2, in particular Beam maps and NEFD. [= Run 15 of a NIKA instrument]
Support teams
- Overall coordinator:
Samuel Leclercq (IRAM/Grenoble, <leclercq@iram.fr>)
- NIKA2 team:
Alain Benoit <alain.benoit@grenoble.cnrs.fr> (PI, IN)
Alessandro Monfardini <monfardini@neel.cnrs.fr> (co-PI, IN)
François-Xavier Désert <francois-xavier.desert@obs.ujf-grenoble.fr> (IPAG)
Martino Calvo <martino.calvo@neel.cnrs.fr> (IN)
Johannes Goupy <johannes.goupy@neel.cnrs.fr> (IN)
- Nicolas Ponthieu (IPAG)
Juan Macias-Perez <macias@lpsc.in2p3.fr> (LPSC)
Andrea Catalano <catalano@lpsc.in2p3.fr> (LPSC)
Remi Adam <adam@lpsc.in2p3.fr> (LPSC)
- IRAM/Granada support team:
Carsten Kramer (Station Manager, <kramer@iram.es>)
Israel Hermelo (30m Continuum Pool Manager, <hermelo@iram.es>)
Nicolas Billot (30m Scheduler, <billot@iram.es>)
Claudia Marka (30m Heterodyne Pool Manager, <marka@iram.es>)
Albrecht Sievers (<sievers@iram.es>)
Author: Israel Hermelo (IRAM 30m continuum pool manager)
email: hermelo@iram.es
Created: 2015.AUG.05
This page is maintained by IH, CK, SL and the NIKA team
Last update: 2015.OCT.19