Size: 5707
Comment:
|
Size: 6424
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 13: | Line 13: |
Somre prelimiary characteristics of NIKA-2: | Some prelimiary characteristics of NIKA-2: |
Line 75: | Line 75: |
* '''1st test run''' (29-October-2015 till 10-November-2015: Installation, cool down at the 30m, testing/debugging/developing) | * '''1^st^ test run of NIKA2''' (29-October-2015 till 10-November-2015: Installation, cool down at the 30m, testing/debugging/developing) [= Run 13 of a NIKA instrument] |
Line 78: | Line 78: |
* '''2^nd^ test run of NIKA2''' (24-November-2015 till 02-December-2015: continue tests started during run 1, in particular Beam maps and NEFD with the 13 NIKEL boards assembled the last days of run 1) [= Run 14 of a NIKA instrument] * [[Nika2Run2|Go to the 2nd run Wiki page]] * '''3^rd^ test run of NIKA2''' (12-January-2016 till 01-February-2016: Implementation of new NIKEL boards; the 20 data lines of NIKA2 are foreseen to be plugged simultaneously. With the 3 arrays fully read, continue and redo tests started with runs 1 & 2, in particular '''Beam maps''' and NEFD. [= Run 15 of a NIKA instrument] * [[Nika2Run3|Go to the 3rd run Wiki page]] ---- |
NIKA2 Homagepage
The New Instrument of Kids Arrays (NIKA2) is the next generation continuum instrument at the IRAM 30m telescope, at Pico Veleta (Spain). The instrument is based on Kinetic Inductance Detectors (KID). The instrument will allow to measure linear polarizations at 1.15 mm.
Contents
Overview
Some prelimiary characteristics of NIKA-2:
Band |
Number of KIDs |
Wavelength |
Bandwidth |
NEFD (goal, TBC) |
HPBW |
FoV |
NIKA2 2 mm/150 GHz |
1020 |
2.00 mm |
125-170 GHz |
TBC mJy*s1/2 |
TBC |
6.5' |
NIKA2 1 mm/260 GHz |
2x1140 |
1.15 mm |
240-280 GHz |
TBC mJy*s1/2 |
TBC |
6.5' |
- Web information in France:
Technical Documentation
- Wiki-pages:
Pool Preparation provides information on the observing modes offered for NIKA2 and examples of the scripts that you must prepare to observe your project.
Observing Session provides an example of a typical session with NIKA2 at the 30m telescope.
Pointing sources and calibrators provides a list of pointing sources and calibrators.
Technical runs
1st test run of NIKA2 (29-October-2015 till 10-November-2015: Installation, cool down at the 30m, testing/debugging/developing) [= Run 13 of a NIKA instrument]
2nd test run of NIKA2 (24-November-2015 till 02-December-2015: continue tests started during run 1, in particular Beam maps and NEFD with the 13 NIKEL boards assembled the last days of run 1) [= Run 14 of a NIKA instrument]
3rd test run of NIKA2 (12-January-2016 till 01-February-2016: Implementation of new NIKEL boards; the 20 data lines of NIKA2 are foreseen to be plugged simultaneously. With the 3 arrays fully read, continue and redo tests started with runs 1 & 2, in particular Beam maps and NEFD. [= Run 15 of a NIKA instrument]
Publications on NIKA-1
- Technical papers:
Catalano, A., Goupy, J., Le Sueur, H., et al, 2015, A&A submitted
- Monfardini, A., Adam, R., Adane, A., et al, 2014, JLTP, Vol. 176, Issue 5-6, pp. 787-795
- Bourrion, O., Vescovi, C., Catalano, A. et al, 2013, Journ. of Instr., Vol. 8, Issue 12, article id. C12006
- Bourrion, O., Vescovi, C., Bouly J.-L. et al, 2012, Journ. of Instr., Vol. 7, Issue 07, pp. 7014
- Bourrion, O., Bideaud, A., Benoit, A., et al, 2011, Journ. of Instr., Vol. 6, Issue 06, pp. 6012
- Astronomical papers:
Adam, A., Comis, B., Macias-Perez, J.-F., et al, 2015, A&A, 576, A12
Catalano, A., Ponthieu, N., Calvo M., et al, 2014, A&A, 569, A9
Adam, R., Comis, B., Macias-Perez, J.-F, et al, 2014, A&A in press
Calvo, M., Roesh, M., Désert, F.-X., et al, 2013, A&A, 551, L12
Monfardini, A., Benoit, A., Bideaud, A., et al, 2011, ApJs, 194, 24
- Monfardini, A., Swenson, L. J., Bideaud, A., et al, 2010, AAp, 521, A29
Support teams
- Overall coordinator:
Samuel Leclercq (IRAM/Grenoble, <leclercq@iram.fr>)
- NIKA2 team:
Alain Benoit <alain.benoit@grenoble.cnrs.fr> (PI, IN)
Alessandro Monfardini <monfardini@neel.cnrs.fr> (co-PI, IN)
François-Xavier Désert <francois-xavier.desert@obs.ujf-grenoble.fr> (IPAG)
Martino Calvo <martino.calvo@neel.cnrs.fr> (IN)
Johannes Goupy <johannes.goupy@neel.cnrs.fr> (IN)
- Nicolas Ponthieu (IPAG)
Juan Macias-Perez <macias@lpsc.in2p3.fr> (LPSC)
Andrea Catalano <catalano@lpsc.in2p3.fr> (LPSC)
Remi Adam <adam@lpsc.in2p3.fr> (LPSC)
- IRAM/Granada support team:
Carsten Kramer (Station Manager, <kramer@iram.es>)
Israel Hermelo (30m Continuum Pool Manager, <hermelo@iram.es>)
Nicolas Billot (30m Scheduler, <billot@iram.es>)
Claudia Marka (30m Heterodyne Pool Manager, <marka@iram.es>)
Albrecht Sievers (<sievers@iram.es>)
Author: Israel Hermelo (IRAM 30m continuum pool manager)
email: hermelo@iram.es
Created: 2015.AUG.05
This page is maintained by IH, CK, SL and the NIKA team
Last update: 2015.OCT.19