5379
Comment:
|
11950
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
= NIKA2 Homagepage = | = NIKA2 Homepage = |
Line 3: | Line 3: |
The New Instrument of Kids Arrays (NIKA2) is the next generation continuum instrument at the IRAM 30m telescope, at Pico Veleta (Spain). The instrument is based on Kinetic Inductance Detectors (KID). The instrument will allow to measure linear polarizations at 1.15 mm. | NIKA2, the second generation New-IRAM-KID-Array, is a dual band camera operating simultaneously at 150 and 260 GHz. The instrument is based on large arrays of superconducting Kinetic Inductance Detectors (KID) operated at temperatures of 100mK. NIKA2 is built by an international consortium, led by the Institute Neel (Grenoble France). Successful installation took place in early October 2015. NIKA2 is designed as a facility instrument which will remain at its present position for at least a decade. The instrument will allow to also measure linear polarizations at 1.15 mm. |
Line 7: | Line 9: |
'''[[ http://www.iram.es/IRAMES/mainWiki/Continuum/NIKA2/Main | Go to the Front Page ]]''' | NIKA2 in the web: * [[http://ipag.osug.fr/nika2/Welcome.html | NIKA2 website at IPAG ]] * [[http://www.iram.fr/wiki/nika2/index.php/Nika2Wiki | NIKA2-internal wiki at IRAM-FR ]]. |
Line 13: | Line 19: |
The main characteristics of the instrument installed the 29th September at Pico Veleta are: | Some prelimiary characteristics of NIKA-2: |
Line 15: | Line 21: |
|| '''Band''' || '''Number of KIDs''' || '''Wavelength''' || '''Bandwidth ''' || '''NEFD''' (goal, TBC) || '''HPBW''' || '''FoV''' || || NIKA2 2 mm/150 GHz || 1020 || 2.00 mm || 125-170 GHz || 10 mJy*s^1/2^ || 18.5" || 6.5' || || NIKA2 1 mm/260 GHz || 2x1140 || 1.15 mm || 240-280 GHz || 15 mJy*s^1/2^ || 12.0" || 6.5' || |
|| '''Band''' || '''Number of KIDs''' || '''Wavelength''' || '''Bandwidth ''' || '''NEFD''' || '''HPBW''' || '''FoV''' || || NIKA2 2 mm/150 GHz || 616 || 2.00 mm || 125-170 GHz || 20 mJy*s^1/2^ || 18" || 6.5' || || NIKA2 1 mm/260 GHz || 2x1140 || 1.15 mm || 240-280 GHz || 30 mJy*s^1/2^ || 12" || 6.5' || |
Line 19: | Line 25: |
* [[http://ipag.osug.fr/nika2/Welcome.html | NIKA2 official website ]] * [[http://www.iram.fr/wiki/nika2/index.php/Nika2Wiki | Private wiki]]. |
Comments: A new 2mm array with 616 pixels was installed mid September 2016. The previously installed array had 1020 pixels. Further changes in September 2016 are a new dichroic frequency splitter, new lenses and a new cryostat window. In addition, several of the 20 readout electronics boards have been replaced with the last version. NIKA2 now has a homogeneous set of boards, plus several spare boards. Commissioning will start on October, 4th and will continue into the winter semester, when NIKA2 shall be opened to the community. |
Line 23: | Line 28: |
## == Call for proposals == ## NIKA2 is not offered to the community yet. ## ## NIKA2 is offered to the community in our regular calls for proposals: ## ## * [[http://www.iram-institute.org/EN/content-page-169-7-57-169-0-0.html | Call for observing proposals with the 30m]] ## * [[http://www.iram.es/IRAMES/mainWiki/Continuum/TimeEstimatorScript | Guidelines to estimate observing times]]. |
== Call for proposals and time estimator == In the upcoming winter semester 2016, running from December 2016 to May 2017, a limited amount of time will be available for NIKA2 science projects. See the [[http://www.iram-institute.org/EN/content-page-169-7-57-169-0-0.html | call for proposals ]]. No polarization measurement is offered for the time being. On the following page, we give information on how to estimate total observing times: * [[http://www.iram.es/IRAMES/mainWiki/Continuum/TimeEstimatorScript | Guidelines to estimate observing times]]. |
Line 33: | Line 36: |
== How-to's == | == Publications == |
Line 35: | Line 38: |
* [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolPreparation | Pool Preparation]] provides information on the observing modes offered for NIKA2 and examples of the scripts that you must prepare to observe your project. | * Instrument/detectors papers: |
Line 37: | Line 40: |
* [[http://www.iram.es/IRAMES/mainWiki/Continuum/ObservingSession | Observing Session]] provides an example of a typical session with NIKA2 at the 30m telescope. | * Bourrion et al. 2016, '''NIKEL_AMC: Readout electronics for the NIKA2 experiment''', [[https://arxiv.org/abs/1602.01288|arxiv]] * Catalano et al. 2016, '''The NIKA2 commissioning campaign: performance and first results''', [[http://arxiv.org/abs/1605.08628|arxiv]] * Calvo et al. 2016, '''The NIKA2 instrument, a dual-band kilopixel KID array for millimetric astronomy''', [[http://arxiv.org/abs/arXiv:1601.02774|arxiv]] * Goupy et al. 2016, '''Microfabrication technology for large LEKID arrays : from NIKA2 to future applications''', [[http://arxiv.org/abs/1601.03969|arxiv]] * Monfardini et al. 2014, '''Latest NIKA Results and the NIKA-2 Project''', JLTP 176, 787, [[http://arxiv.org/abs/arXiv:1310.1230|arxiv]] * Catalano et al. 2014, '''Performance and calibration of the NIKA camera at the IRAM 30 m telescope''', A&A 569, A9, [[http://arxiv.org/abs/arXiv:1402.0260|arxiv]] * Calvo et al. 2013, '''Improved mm-wave photometry for kinetic inductance detectors''', A&A, 551, L12 [[http://adsabs.harvard.edu/abs/2013A%26A...551L..12C|ADS]] * Bourrion et al. 2012, '''NIKEL: Electronics and data acquisition for kilopixels kinetic inductance camera''', Journal of Instrumentation, 7, 07, pp. 7014. [[http://arxiv.org/abs/1204.1415|arXiv]] * Monfardini et al. 2011, '''A Dual-band Millimeter-wave Kinetic Inductance Camera for the IRAM 30 m Telescope''', ApJS, 194, 2, article id. 24. [[http://arxiv.org/abs/1102.0870|arXiv]] * [[http://www.iram.fr/wiki/nika2/index.php/Technical_NIKA_papers_to_be_cited|Internal list of technical papers]] |
Line 39: | Line 51: |
* [[http://www.iram.es/IRAMES/mainWiki/Continuum/Calibrators | Pointing sources and calibrators ]] provides a list of pointing sources and calibrators. | * Astronomical papers: * Ritacco, A., Ponthieu, N, Catalano, A., et al, 2016, '''Polarimetry at millimeter wavelengths with the NIKA camera: calibration and performance''', A&A, [[https://arxiv.org/abs/1609.02042|astro-ph]] * Ruppin, F., Adam, R., Comis, B., et al. 2016, '''Non parametric deprojection of NIKA SZ observations: pressure distribution in the Planck-discovered cluster PSZ1 G045.85+57.71''', A&A, in press [[http://adsabs.harvard.edu/cgi-bin/bib_query?arXiv:1607.07679|ADS]] * Adam, R., Bartalucci, I., Pratt, G. W., et al. 2016, '''Mapping the kinetic Sunyaev-Zel'dovich effect toward MACS J0717.5+3745 with NIKA''', A&A, in press [[http://esoads.eso.org/abs/2016arXiv160607721A|ADS]] * Adam, R., Comis, B., Bartalucci, I., et al. 2016, '''High angular resolution Sunyaev-Zel'dovich observations of MACS J1423.8+2404 with NIKA: Multiwavelength analysis''', A&A, 586, 122 [[http://esoads.eso.org/abs/2016A%26A...586A.122A|ADS]] * Adam, R., Comis, B., Macias-Perez, J.-F., et al, 2015, '''Pressure distribution of the high-redshift cluster of galaxies CL J1226.9+3332 with NIKA''', A&A, 576, A12 [[http://adsabs.harvard.edu/abs/2015A%26A...576A..12A|ADS]] * Adam, R., Comis, B., Macias-Perez, J.-F, et al, 2014, '''First observation of the thermal Sunyaev-Zel'dovich effect with kinetic inductance detectors''', A&A, 569, 66 [[http://adsabs.harvard.edu/abs/2014A%26A...569A..66A|ADS]] |
Line 41: | Line 59: |
* [[http://www.iram.es/IRAMES/mainWiki/Continuum/NetworkAccess | Remote network access to NIKA-2 ]] | * Ph.D. thesis: * ''Rémi Adam (2012-2015) - Advisors: J.F. Macías-Pérez and F.X. Désert'' ([[https://tel.archives-ouvertes.fr/tel-01303736 | Observation des amas de galaxies par effet Sunyaev-Zel'dovich et de la polarisation du fond diffus cosmologique : de Planck à NIKA (in French)]]) * Talks: * Alessia Ritacco, November 2016, '''Polarimetry at Millimeter wavelengths with NIKA and NIKA2''' [[attachment:ritacco-seminar-nika2-nov2016.pdf]] * [[http://ipag.osug.fr/nika2/Publications.html|NIKA2 publications list maintained at IPAG]] ---- == Technical Documentation == * [[attachment:calvo-feb2016-nika2-camadia.pdf | NIKA2 Data Acquisition, Camadia, M.Calvo, Feb-2016 ]] * [[attachment:calvo-docTuning_feb2016.pdf | NIKA2 tuning procedure and data flagging description, M.Calvo, Feb-2016 ]] * [[http://www.iram.es/IRAMES/mainWiki/Continuum/NIKA2/InstrumentalDoc | Instrument-related documentation page ]] * Wiki-pages: * [[http://www.iram.es/IRAMES/mainWiki/OffProcNika2Run1Beam | Discussion on beams ]] * [[http://www.iram.es/IRAMES/mainWiki/Spectral%20bands | Spectral bands ]] * [[http://www.iram.es/IRAMES/mainWiki/Continuum/NetworkAccess | Remote network access to NIKA-2 ]] * [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolPreparation | Pool Preparation]] provides information on the observing modes offered for NIKA2 and examples of the scripts that you must prepare to observe your project. * [[http://www.iram.es/IRAMES/mainWiki/Continuum/ObservingSession | Observing Session]] provides an example of a typical session with NIKA2 at the 30m telescope. * [[http://www.iram.es/IRAMES/mainWiki/Continuum/Calibrators | Pointing sources and calibrators ]] provides a list of pointing sources and calibrators. ## * [[http://www.iram.es/IRAMES/mainWiki/Continuum/TimeEstimatorScript|Time Estimator (UNDER CONSTRUCTION)]] |
Line 62: | Line 112: |
'''[[ http://www.iram.es/IRAMES/mainWiki/Continuum/NIKA2/Main | Go to the top ]]''' |
|
Line 64: | Line 116: |
== Technical runs == | == Technical runs to commission NIKA2 == |
Line 66: | Line 118: |
* '''1st test run''' (29-October-2015 till 10-November-2015: Installation, cool down at the 30m, testing/debugging/developing) | * '''1^st^ test run of NIKA2''': 29-October-2015 till 10-November-2015. Installation, cool down at the 30m, testing/debugging/developing. [= Run 13 of a NIKA instrument] |
Line 70: | Line 122: |
== Publications on NIKA-1 == | * '''2^nd^ test run of NIKA2''': 24-November-2015 till 02-December-2015. Continue tests started during run 1, in particular Beam maps and NEFD with the 13 NIKEL boards assembled the last days of run 1. [= Run 14 of a NIKA instrument] * [[Nika2Run2|Go to the 2nd run Wiki page]] |
Line 72: | Line 125: |
* Technical papers: | * '''3^rd^ test run of NIKA2''': 12-January-2016 till 01-February-2016. Implementation of new NIKEL boards; the 20 data lines of NIKA2 are foreseen to be plugged simultaneously. With the 3 arrays fully read, continue and redo tests started with runs 1 & 2, in particular '''Beam maps''' and NEFD. [= Run 15 of a NIKA instrument] * [[Nika2Run3|Go to the 3rd run Wiki page]] |
Line 74: | Line 128: |
* Catalano, A., Goupy, J., Le Sueur, H., et al, 2015, A&A submitted * Monfardini, A., Adam, R., Adane, A., et al, 2014, JLTP, Vol. 176, Issue 5-6, pp. 787-795 * Bourrion, O., Vescovi, C., Catalano, A. et al, 2013, Journ. of Instr., Vol. 8, Issue 12, article id. C12006 * Bourrion, O., Vescovi, C., Bouly J.-L. et al, 2012, Journ. of Instr., Vol. 7, Issue 07, pp. 7014 * Bourrion, O., Bideaud, A., Benoit, A., et al, 2011, Journ. of Instr., Vol. 6, Issue 06, pp. 6012 |
* '''4^th^ test run of NIKA2''': 1-March-2016 till 15-March-2016. Continue tests started with previous runs, in particular investigate deeper beam patterns (XY focus, beam maps), synchronization, array 1 & 3 performances vs electronic boards, NEFD, mapping strategies. [= Run 16 of a NIKA instrument] * [[Nika2Run4|Go to the 4th run Wiki page]] |
Line 80: | Line 131: |
* Astronomical papers: | * '''Dark run''': 4-May-2016. Test sensitivity of NIKA2 to external electromagnetic perturbations, with the entrance window of the cryostat closed. [= Run 17 of a NIKA instrument] |
Line 82: | Line 133: |
* Adam, A., Comis, B., Macias-Perez, J.-F., et al, 2015, A&A, 576, A12 * Catalano, A., Ponthieu, N., Calvo M., et al, 2014, A&A, 569, A9 * Adam, R., Comis, B., Macias-Perez, J.-F, et al, 2014, A&A in press * Calvo, M., Roesh, M., Désert, F.-X., et al, 2013, A&A, 551, L12 * Monfardini, A., Benoit, A., Bideaud, A., et al, 2011, ApJs, 194, 24 * Monfardini, A., Swenson, L. J., Bideaud, A., et al, 2010, AAp, 521, A29 |
* '''5^th^ test run of NIKA2''': 16-September-2016 till 11-October-2016. Upgrade NIKA2 with new dichroic, new corrugated lenses and window, new 2mm array, new NIKEL boards (get the 20 lines with homogeneous electronics, v3); redo better the tests started with previous runs (mostly beam maps in best weather conditions, but also various types of scan to investigate deeper beams and noise, synchronization, NEFD, skydips, mapping strategies, possibly polarization. [= Run 18 of a NIKA instrument] * [[Nika2Run5|Go to the 5th run Wiki page]] * '''6^th^ test run of NIKA2''': 25-October-2016 till 1-November-2016. Continue NIKA2 commissioning. [= Run 19 of a NIKA instrument] * [[Nika2Run6|Go to the 6th run Wiki page]] * '''7^th^ test run of NIKA2''': 6-December-2016 till 13-December-2016. Continue NIKA2 commissioning. [= Run 20 of a NIKA instrument] * [[Nika2Run7|Go to the 7th run Wiki page]] |
Line 97: | Line 152: |
* François-Xavier Désert <francois-xavier.desert@obs.ujf-grenoble.fr> (IPAG) | * François-Xavier Désert <francois-xavier.desert@univ-grenoble-alpes.fr> (IPAG) |
Line 100: | Line 155: |
* Nicolas Ponthieu (IPAG) | * Nicolas Ponthieu <nicolas.ponthieu@univ-grenoble-alpes.fr> (IPAG) |
Line 103: | Line 158: |
* Remi Adam <adam@lpsc.in2p3.fr> (LPSC) | * Laurence Perotto <laurence.perotto@lpsc.in2p3.fr> (LPSC) |
Line 105: | Line 160: |
* IRAM/Granada support team: * '''Carsten Kramer''' (Station Manager, <kramer@iram.es>) * Israel Hermelo (30m Continuum Pool Manager, <hermelo@iram.es>) * Nicolas Billot (30m Scheduler, <billot@iram.es>) * Claudia Marka (30m Heterodyne Pool Manager, <marka@iram.es>) * Albrecht Sievers (<sievers@iram.es>) |
* IRAM/Granada NIKA2 support team: * Carsten Kramer (Station Manager and Scheduler, <kramer@iram.es>) * Pablo Garcia (time estimator, continuum Pool Manager, <pgarcia@iram.es>) * Albrecht Sievers (IMBfits, <sievers@iram.es>) * Hans Ungerechts (NCS/pako, <ungerechts@iram.es>) * Pablo Mellado (Computers/Network, <mellado@iram.es>) '''[[ http://www.iram.es/IRAMES/mainWiki/Continuum/NIKA2/Main | Go to top ]]''' |
Line 113: | Line 170: |
Author: Israel Hermelo (IRAM 30m continuum pool manager) email: hermelo@iram.es Created: 2015.AUG.05 This page is maintained by IH, CK, SL and the NIKA team Last update: 2015.OCT.19 |
Author: Israel Hermelo. Created: 5-Aug-2015. This page is maintained by PG, CK, SL and the NIKA team. Last update: 1-Oct-2016 |
NIKA2 Homepage
NIKA2, the second generation New-IRAM-KID-Array, is a dual band camera operating simultaneously at 150 and 260 GHz. The instrument is based on large arrays of superconducting Kinetic Inductance Detectors (KID) operated at temperatures of 100mK. NIKA2 is built by an international consortium, led by the Institute Neel (Grenoble France). Successful installation took place in early October 2015. NIKA2 is designed as a facility instrument which will remain at its present position for at least a decade. The instrument will allow to also measure linear polarizations at 1.15 mm.
Contents
NIKA2 in the web:
Overview
Some prelimiary characteristics of NIKA-2:
Band |
Number of KIDs |
Wavelength |
Bandwidth |
NEFD |
HPBW |
FoV |
NIKA2 2 mm/150 GHz |
616 |
2.00 mm |
125-170 GHz |
20 mJy*s1/2 |
18" |
6.5' |
NIKA2 1 mm/260 GHz |
2x1140 |
1.15 mm |
240-280 GHz |
30 mJy*s1/2 |
12" |
6.5' |
Comments: A new 2mm array with 616 pixels was installed mid September 2016. The previously installed array had 1020 pixels. Further changes in September 2016 are a new dichroic frequency splitter, new lenses and a new cryostat window. In addition, several of the 20 readout electronics boards have been replaced with the last version. NIKA2 now has a homogeneous set of boards, plus several spare boards. Commissioning will start on October, 4th and will continue into the winter semester, when NIKA2 shall be opened to the community.
Call for proposals and time estimator
In the upcoming winter semester 2016, running from December 2016 to May 2017, a limited amount of time will be available for NIKA2 science projects. See the call for proposals. No polarization measurement is offered for the time being. On the following page, we give information on how to estimate total observing times:
Publications
- Instrument/detectors papers:
Bourrion et al. 2016, NIKEL_AMC: Readout electronics for the NIKA2 experiment, arxiv
Catalano et al. 2016, The NIKA2 commissioning campaign: performance and first results, arxiv
Calvo et al. 2016, The NIKA2 instrument, a dual-band kilopixel KID array for millimetric astronomy, arxiv
Goupy et al. 2016, Microfabrication technology for large LEKID arrays : from NIKA2 to future applications, arxiv
Monfardini et al. 2014, Latest NIKA Results and the NIKA-2 Project, JLTP 176, 787, arxiv
Catalano et al. 2014, Performance and calibration of the NIKA camera at the IRAM 30 m telescope, A&A 569, A9, arxiv
Calvo et al. 2013, Improved mm-wave photometry for kinetic inductance detectors, A&A, 551, L12 ADS
Bourrion et al. 2012, NIKEL: Electronics and data acquisition for kilopixels kinetic inductance camera, Journal of Instrumentation, 7, 07, pp. 7014. arXiv
Monfardini et al. 2011, A Dual-band Millimeter-wave Kinetic Inductance Camera for the IRAM 30 m Telescope, ApJS, 194, 2, article id. 24. arXiv
- Astronomical papers:
Ritacco, A., Ponthieu, N, Catalano, A., et al, 2016, Polarimetry at millimeter wavelengths with the NIKA camera: calibration and performance, A&A, astro-ph
Ruppin, F., Adam, R., Comis, B., et al. 2016, Non parametric deprojection of NIKA SZ observations: pressure distribution in the Planck-discovered cluster PSZ1 G045.85+57.71, A&A, in press ADS
Adam, R., Bartalucci, I., Pratt, G. W., et al. 2016, Mapping the kinetic Sunyaev-Zel'dovich effect toward MACS J0717.5+3745 with NIKA, A&A, in press ADS
Adam, R., Comis, B., Bartalucci, I., et al. 2016, High angular resolution Sunyaev-Zel'dovich observations of MACS J1423.8+2404 with NIKA: Multiwavelength analysis, A&A, 586, 122 ADS
Adam, R., Comis, B., Macias-Perez, J.-F., et al, 2015, Pressure distribution of the high-redshift cluster of galaxies CL J1226.9+3332 with NIKA, A&A, 576, A12 ADS
Adam, R., Comis, B., Macias-Perez, J.-F, et al, 2014, First observation of the thermal Sunyaev-Zel'dovich effect with kinetic inductance detectors, A&A, 569, 66 ADS
- Ph.D. thesis:
Rémi Adam (2012-2015) - Advisors: J.F. Macías-Pérez and F.X. Désert (Observation des amas de galaxies par effet Sunyaev-Zel'dovich et de la polarisation du fond diffus cosmologique : de Planck à NIKA (in French))
- Talks:
Alessia Ritacco, November 2016, Polarimetry at Millimeter wavelengths with NIKA and NIKA2 ritacco-seminar-nika2-nov2016.pdf
Technical Documentation
NIKA2 tuning procedure and data flagging description, M.Calvo, Feb-2016
- Wiki-pages:
Pool Preparation provides information on the observing modes offered for NIKA2 and examples of the scripts that you must prepare to observe your project.
Observing Session provides an example of a typical session with NIKA2 at the 30m telescope.
Pointing sources and calibrators provides a list of pointing sources and calibrators.
Technical runs to commission NIKA2
1st test run of NIKA2: 29-October-2015 till 10-November-2015. Installation, cool down at the 30m, testing/debugging/developing. [= Run 13 of a NIKA instrument]
2nd test run of NIKA2: 24-November-2015 till 02-December-2015. Continue tests started during run 1, in particular Beam maps and NEFD with the 13 NIKEL boards assembled the last days of run 1. [= Run 14 of a NIKA instrument]
3rd test run of NIKA2: 12-January-2016 till 01-February-2016. Implementation of new NIKEL boards; the 20 data lines of NIKA2 are foreseen to be plugged simultaneously. With the 3 arrays fully read, continue and redo tests started with runs 1 & 2, in particular Beam maps and NEFD. [= Run 15 of a NIKA instrument]
4th test run of NIKA2: 1-March-2016 till 15-March-2016. Continue tests started with previous runs, in particular investigate deeper beam patterns (XY focus, beam maps), synchronization, array 1 & 3 performances vs electronic boards, NEFD, mapping strategies. [= Run 16 of a NIKA instrument]
Dark run: 4-May-2016. Test sensitivity of NIKA2 to external electromagnetic perturbations, with the entrance window of the cryostat closed. [= Run 17 of a NIKA instrument]
5th test run of NIKA2: 16-September-2016 till 11-October-2016. Upgrade NIKA2 with new dichroic, new corrugated lenses and window, new 2mm array, new NIKEL boards (get the 20 lines with homogeneous electronics, v3); redo better the tests started with previous runs (mostly beam maps in best weather conditions, but also various types of scan to investigate deeper beams and noise, synchronization, NEFD, skydips, mapping strategies, possibly polarization. [= Run 18 of a NIKA instrument]
6th test run of NIKA2: 25-October-2016 till 1-November-2016. Continue NIKA2 commissioning. [= Run 19 of a NIKA instrument]
7th test run of NIKA2: 6-December-2016 till 13-December-2016. Continue NIKA2 commissioning. [= Run 20 of a NIKA instrument]
Support teams
- Overall coordinator:
Samuel Leclercq (IRAM/Grenoble, <leclercq@iram.fr>)
- NIKA2 team:
Alain Benoit <alain.benoit@grenoble.cnrs.fr> (PI, IN)
Alessandro Monfardini <monfardini@neel.cnrs.fr> (co-PI, IN)
François-Xavier Désert <francois-xavier.desert@univ-grenoble-alpes.fr> (IPAG)
Martino Calvo <martino.calvo@neel.cnrs.fr> (IN)
Johannes Goupy <johannes.goupy@neel.cnrs.fr> (IN)
Nicolas Ponthieu <nicolas.ponthieu@univ-grenoble-alpes.fr> (IPAG)
Juan Macias-Perez <macias@lpsc.in2p3.fr> (LPSC)
Andrea Catalano <catalano@lpsc.in2p3.fr> (LPSC)
Laurence Perotto <laurence.perotto@lpsc.in2p3.fr> (LPSC)
- IRAM/Granada NIKA2 support team:
Carsten Kramer (Station Manager and Scheduler, <kramer@iram.es>)
Pablo Garcia (time estimator, continuum Pool Manager, <pgarcia@iram.es>)
Albrecht Sievers (IMBfits, <sievers@iram.es>)
Hans Ungerechts (NCS/pako, <ungerechts@iram.es>)
Pablo Mellado (Computers/Network, <mellado@iram.es>)
Author: Israel Hermelo. Created: 5-Aug-2015. This page is maintained by PG, CK, SL and the NIKA team. Last update: 1-Oct-2016