Differences between revisions 22 and 24 (spanning 2 versions)
Revision 22 as of 2015-10-19 15:29:06
Size: 5442
Editor: dhcp-16
Comment:
Revision 24 as of 2015-11-11 11:37:28
Size: 5580
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= NIKA2 = = NIKA2 Homagepage =
Line 27: Line 27:
NIKA2 is not offered to the community yet. It is being commissioned during Oct 2015 until mid 2016. NIKA2 is not offered to the community yet. It has been installed in October 2015 and is currently being tested.
Line 57: Line 57:
== Support teams ==
Line 59: Line 58:
 * Overall coordinator:
  * '''Samuel Leclercq''' (IRAM/Grenoble, <leclercq@iram.fr>)

 * NIKA2 team:
  * '''Alain Benoit''' <alain.benoit@grenoble.cnrs.fr> (PI, IN)
  * '''Alessandro Monfardini''' <monfardini@neel.cnrs.fr> (co-PI, IN)
  * François-Xavier Désert <francois-xavier.desert@obs.ujf-grenoble.fr> (IPAG)
  * Martino Calvo <martino.calvo@neel.cnrs.fr> (IN)
  * Johannes Goupy <johannes.goupy@neel.cnrs.fr> (IN)
  * Nicolas Ponthieu (IPAG)
  * Juan Macias-Perez <macias@lpsc.in2p3.fr> (LPSC)
  * Andrea Catalano <catalano@lpsc.in2p3.fr> (LPSC)
  * Remi Adam <adam@lpsc.in2p3.fr> (LPSC)

 * IRAM/Granada support team:
  * '''Carsten Kramer''' (Station Manager, <kramer@iram.es>)
  * Israel Hermelo (30m Continuum Pool Manager, <hermelo@iram.es>)
  * Nicolas Billot (30m Scheduler, <billot@iram.es>)
  * Claudia Marka (30m Heterodyne Pool Manager, <marka@iram.es>)
  * Albrecht Sievers (<sievers@iram.es>)
Line 89: Line 68:

 * [[http://www.iram.es/IRAMES/mainWiki/Continuum/NetworkAccess | Remote network access to NIKA-2 ]]
Line 119: Line 100:
== Support teams ==
Line 120: Line 102:
 * Overall coordinator:
  * '''Samuel Leclercq''' (IRAM/Grenoble, <leclercq@iram.fr>)

 * NIKA2 team:
  * '''Alain Benoit''' <alain.benoit@grenoble.cnrs.fr> (PI, IN)
  * '''Alessandro Monfardini''' <monfardini@neel.cnrs.fr> (co-PI, IN)
  * François-Xavier Désert <francois-xavier.desert@obs.ujf-grenoble.fr> (IPAG)
  * Martino Calvo <martino.calvo@neel.cnrs.fr> (IN)
  * Johannes Goupy <johannes.goupy@neel.cnrs.fr> (IN)
  * Nicolas Ponthieu (IPAG)
  * Juan Macias-Perez <macias@lpsc.in2p3.fr> (LPSC)
  * Andrea Catalano <catalano@lpsc.in2p3.fr> (LPSC)
  * Remi Adam <adam@lpsc.in2p3.fr> (LPSC)

 * IRAM/Granada support team:
  * '''Carsten Kramer''' (Station Manager, <kramer@iram.es>)
  * Israel Hermelo (30m Continuum Pool Manager, <hermelo@iram.es>)
  * Nicolas Billot (30m Scheduler, <billot@iram.es>)
  * Claudia Marka (30m Heterodyne Pool Manager, <marka@iram.es>)
  * Albrecht Sievers (<sievers@iram.es>)

-------

NIKA2 Homagepage

The New Instrument of Kids Arrays (NIKA2) is the next generation continuum instrument to be placed at the 30m telescope of IRAM, at Pico Veleta (Spain). The instrument is based on Kinetic Inductance Detectors (KID). The baseline detector focal plane units consist of 1020 detectors at 2 mm and 2x1140 detectors at 1.15 mm. The instrument will provide the measurement of the linear polarization at 1.15 mm.

Go to the Front Page


Overview

The main characteristics of the instrument installed the 29th September at Pico Veleta are:

Band

Number of KIDs

Wavelength

Bandwidth

NEFD (goal, TBC)

HPBW

FoV

NIKA2 2 mm/150 GHz

1020

2.00 mm

125-170 GHz

10 mJy*s1/2

18.5"

6.5'

NIKA2 1 mm/260 GHz

2x1140

1.15 mm

240-280 GHz

15 mJy*s1/2

12.0"

6.5'


Call for proposals

NIKA2 is not offered to the community yet. It has been installed in October 2015 and is currently being tested.


Publications

  • Technical papers:
    • Catalano, A., Goupy, J., Le Sueur, H., et al, 2015, A&A submitted

    • Monfardini, A., Adam, R., Adane, A., et al, 2014, JLTP, Vol. 176, Issue 5-6, pp. 787-795
    • Bourrion, O., Vescovi, C., Catalano, A. et al, 2013, Journ. of Instr., Vol. 8, Issue 12, article id. C12006
    • Bourrion, O., Vescovi, C., Bouly J.-L. et al, 2012, Journ. of Instr., Vol. 7, Issue 07, pp. 7014
    • Bourrion, O., Bideaud, A., Benoit, A., et al, 2011, Journ. of Instr., Vol. 6, Issue 06, pp. 6012
  • Astronomical papers:
    • Adam, A., Comis, B., Macias-Perez, J.-F., et al, 2015, A&A, 576, A12

    • Catalano, A., Ponthieu, N., Calvo M., et al, 2014, A&A, 569, A9

    • Adam, R., Comis, B., Macias-Perez, J.-F, et al, 2014, A&A in press

    • Calvo, M., Roesh, M., Désert, F.-X., et al, 2013, A&A, 551, L12

    • Monfardini, A., Benoit, A., Bideaud, A., et al, 2011, ApJs, 194, 24

    • Monfardini, A., Swenson, L. J., Bideaud, A., et al, 2010, AAp, 521, A29



How-to's


Technical runs


Support teams


Author: Israel Hermelo (IRAM 30m continuum pool manager)

email: hermelo@iram.es

Created: 2015.AUG.05

This page is maintained by IH, CK, SL and the NIKA team

Last update: 2015.OCT.19

Continuum/NIKA2/Main (last edited 2025-02-21 12:02:51 by CarstenKramer)