Size: 5436
Comment:
|
Size: 5442
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 3: | Line 3: |
The New Instrument of Kids Arrays (NIKA2) is the next generation continuum instrument to be placed at the 30m telescope of IRAM, at Pico Veleta (Spain). The instrument is based on Kinetic Inductance Detectors (KID). The baseline detector focal plane units consist of 1020 detectors at 2 mm and 2x1140 detectors at 1.25 mm. The instrument will provide the measurement of the linear polarization at 1.25 mm. | The New Instrument of Kids Arrays (NIKA2) is the next generation continuum instrument to be placed at the 30m telescope of IRAM, at Pico Veleta (Spain). The instrument is based on Kinetic Inductance Detectors (KID). The baseline detector focal plane units consist of 1020 detectors at 2 mm and 2x1140 detectors at 1.15 mm. The instrument will provide the measurement of the linear polarization at 1.15 mm. |
Line 13: | Line 13: |
The main characteristics of the latest configuration (2015.AUG.05) are summarized on the following table. | The main characteristics of the instrument installed the 29th September at Pico Veleta are: |
Line 15: | Line 15: |
|| '''Band''' || '''Number of KIDs''' || '''Wavelength''' || '''Bandwidth ''' || '''NEFD''' goal || '''HPBW''' || '''FoV''' || || NIKA 2 mm || 1020 || 2.0 mm || 120-170 GHz || 10 mJy*s^1/2^ || 18.5" || 6.5' || || NIKA 1 mm || 2x1140 || 1.15 mm || 240-280 GHz || 15 mJy*s^1/2^ || 12.0" || 6.5' || |
|| '''Band''' || '''Number of KIDs''' || '''Wavelength''' || '''Bandwidth ''' || '''NEFD''' (goal, TBC) || '''HPBW''' || '''FoV''' || || NIKA2 2 mm/150 GHz || 1020 || 2.00 mm || 125-170 GHz || 10 mJy*s^1/2^ || 18.5" || 6.5' || || NIKA2 1 mm/260 GHz || 2x1140 || 1.15 mm || 240-280 GHz || 15 mJy*s^1/2^ || 12.0" || 6.5' || |
Line 27: | Line 27: |
NIKA2 is not offered to the community yet. | NIKA2 is not offered to the community yet. It is being commissioned during Oct 2015 until mid 2016. |
Line 62: | Line 62: |
* NIKA team: | * NIKA2 team: |
Line 64: | Line 64: |
* '''Alessandro Monfardini''' <monfardini@grenoble.cnrs.fr> (co-PI, IN) | * '''Alessandro Monfardini''' <monfardini@neel.cnrs.fr> (co-PI, IN) |
Line 66: | Line 66: |
* Martino Calvo <martino.calvo@grenoble.cnrs.fr> (IN) * Antonio D'Addabbo <antonio.d-addabbo@grenoble.cnrs.fr> (IN) |
* Martino Calvo <martino.calvo@neel.cnrs.fr> (IN) * Johannes Goupy <johannes.goupy@neel.cnrs.fr> (IN) |
Line 84: | Line 84: |
* [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolPreparation | Pool Preparation]] provides information on the observing modes offered for the continuum cameras as well as examples of the scripts that you need to prepare to observe your project. | * [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolPreparation | Pool Preparation]] provides information on the observing modes offered for NIKA2 and examples of the scripts that you must prepare to observe your project. |
Line 86: | Line 86: |
* [[http://www.iram.es/IRAMES/mainWiki/Continuum/ObservingSession | Observing Session]] provides an example of a typical session with the continuum cameras at the 30m telescope. | * [[http://www.iram.es/IRAMES/mainWiki/Continuum/ObservingSession | Observing Session]] provides an example of a typical session with NIKA2 at the 30m telescope. |
Line 88: | Line 88: |
* [[http://www.iram.es/IRAMES/mainWiki/Continuum/Calibrators | Pointing sources and calibrators ]] provides a list of pointing sources and calibrators for the IRAM 30m continuum cameras. | * [[http://www.iram.es/IRAMES/mainWiki/Continuum/Calibrators | Pointing sources and calibrators ]] provides a list of pointing sources and calibrators. |
Line 90: | Line 90: |
* [[http://www.iram.es/IRAMES/mainWiki/Continuum/ObserveGRBs | Observe GRBs]] | ## * [[http://www.iram.es/IRAMES/mainWiki/Continuum/ObserveGRBs | Observe GRBs]] |
Line 115: | Line 115: |
* [[http://www.iram.fr/wiki/nika2/index.php/CommissioningNIKA2 | Private Wiki detailing the organization of the run and the commissioning plan]] | * [[http://www.iram.fr/wiki/nika2/index.php/NIKA2_Run1_30m_CharacterizationPlan | Private Wiki detailing the organization of the run and the instrument characterization plan]] |
Line 128: | Line 128: |
Last update: 2015.AUG.05 | Last update: 2015.OCT.19 |
NIKA2
The New Instrument of Kids Arrays (NIKA2) is the next generation continuum instrument to be placed at the 30m telescope of IRAM, at Pico Veleta (Spain). The instrument is based on Kinetic Inductance Detectors (KID). The baseline detector focal plane units consist of 1020 detectors at 2 mm and 2x1140 detectors at 1.15 mm. The instrument will provide the measurement of the linear polarization at 1.15 mm.
Overview
The main characteristics of the instrument installed the 29th September at Pico Veleta are:
Band |
Number of KIDs |
Wavelength |
Bandwidth |
NEFD (goal, TBC) |
HPBW |
FoV |
NIKA2 2 mm/150 GHz |
1020 |
2.00 mm |
125-170 GHz |
10 mJy*s1/2 |
18.5" |
6.5' |
NIKA2 1 mm/260 GHz |
2x1140 |
1.15 mm |
240-280 GHz |
15 mJy*s1/2 |
12.0" |
6.5' |
Call for proposals
NIKA2 is not offered to the community yet. It is being commissioned during Oct 2015 until mid 2016.
Publications
- Technical papers:
Catalano, A., Goupy, J., Le Sueur, H., et al, 2015, A&A submitted
- Monfardini, A., Adam, R., Adane, A., et al, 2014, JLTP, Vol. 176, Issue 5-6, pp. 787-795
- Bourrion, O., Vescovi, C., Catalano, A. et al, 2013, Journ. of Instr., Vol. 8, Issue 12, article id. C12006
- Bourrion, O., Vescovi, C., Bouly J.-L. et al, 2012, Journ. of Instr., Vol. 7, Issue 07, pp. 7014
- Bourrion, O., Bideaud, A., Benoit, A., et al, 2011, Journ. of Instr., Vol. 6, Issue 06, pp. 6012
- Astronomical papers:
Adam, A., Comis, B., Macias-Perez, J.-F., et al, 2015, A&A, 576, A12
Catalano, A., Ponthieu, N., Calvo M., et al, 2014, A&A, 569, A9
Adam, R., Comis, B., Macias-Perez, J.-F, et al, 2014, A&A in press
Calvo, M., Roesh, M., Désert, F.-X., et al, 2013, A&A, 551, L12
Monfardini, A., Benoit, A., Bideaud, A., et al, 2011, ApJs, 194, 24
- Monfardini, A., Swenson, L. J., Bideaud, A., et al, 2010, AAp, 521, A29
Support teams
- Overall coordinator:
Samuel Leclercq (IRAM/Grenoble, <leclercq@iram.fr>)
- NIKA2 team:
Alain Benoit <alain.benoit@grenoble.cnrs.fr> (PI, IN)
Alessandro Monfardini <monfardini@neel.cnrs.fr> (co-PI, IN)
François-Xavier Désert <francois-xavier.desert@obs.ujf-grenoble.fr> (IPAG)
Martino Calvo <martino.calvo@neel.cnrs.fr> (IN)
Johannes Goupy <johannes.goupy@neel.cnrs.fr> (IN)
- Nicolas Ponthieu (IPAG)
Juan Macias-Perez <macias@lpsc.in2p3.fr> (LPSC)
Andrea Catalano <catalano@lpsc.in2p3.fr> (LPSC)
Remi Adam <adam@lpsc.in2p3.fr> (LPSC)
- IRAM/Granada support team:
Carsten Kramer (Station Manager, <kramer@iram.es>)
Israel Hermelo (30m Continuum Pool Manager, <hermelo@iram.es>)
Nicolas Billot (30m Scheduler, <billot@iram.es>)
Claudia Marka (30m Heterodyne Pool Manager, <marka@iram.es>)
Albrecht Sievers (<sievers@iram.es>)
How-to's
Pool Preparation provides information on the observing modes offered for NIKA2 and examples of the scripts that you must prepare to observe your project.
Observing Session provides an example of a typical session with NIKA2 at the 30m telescope.
Pointing sources and calibrators provides a list of pointing sources and calibrators.
Technical runs
1st test run (October 2015, Installation, 1st cool down at the 30m, start commissioning procedures)
Author: Israel Hermelo (IRAM 30m continuum pool manager)
email: hermelo@iram.es
Created: 2015.AUG.05
This page is maintained by IH, CK, SL and the NIKA team
Last update: 2015.OCT.19