Line 36: Line 36:
== Guaranteed Time Programs: Abstracts and source lists ==

Four Large Programs for NIKA2 in guaranteed time were submitted to the Program Committee for the deadline in September 2016. All four have been rated high by the PC. Here, we provide the proposal abstracts together with the list of sources and map sizes. These shall be "fenced" against new continuum mapping projects at the 30m or NOEMA. <18-January 2017>
Line 40: Line 44:
   * Bourrion et al. 2016, '''NIKEL_AMC: Readout electronics for the NIKA2 experiment''', [[https://arxiv.org/abs/1602.01288|arxiv]]
Line 60: Line 65:

 * Talks:
   * Alessia Ritacco, November 2016, '''Polarimetry at Millimeter wavelengths with NIKA and NIKA2''' [[attachment:ritacco-seminar-nika2-nov2016.pdf]]
Line 132: Line 140:
Line 135: Line 142:

 * '''7^th^ test run of NIKA2''': 6-December-2016 till 13-December-2016. Test DRO based external calibrator, continue NIKA2 commissioning. [= Run 20 of a NIKA instrument]
  * [[Nika2Run7|Go to the 7th run Wiki page]]

 * '''8^th^ test run of NIKA2''': 9-January-2017 to 13-January-2017, then 23-January to 27-January, then 21-February to 28-Fevruary. Reverse array 1 lens to smooth version, continue NIKA2 commissioning. [= Run 21 of a NIKA instrument]
  * [[Nika2Run8|Go to the 8th run Wiki page]]
Line 144: Line 157:
  * '''Alain Benoit''' <alain.benoit@grenoble.cnrs.fr> (PI, IN)
* '''Alessandro Monfardini''' <monfardini@neel.cnrs.fr> (co-PI, IN)
  * '''Alessandro Monfardini''' <monfardini@neel.cnrs.fr> (PI, IN)
  * Alain Benoit <alain.benoit@grenoble.cnrs.fr>

NIKA2 Homepage

NIKA2, the second generation New-IRAM-KID-Array, is a dual band camera operating simultaneously at 150 and 260 GHz. The instrument is based on large arrays of superconducting Kinetic Inductance Detectors (KID) operated at temperatures of 100mK. NIKA2 is built by an international consortium, led by the Institute Neel (Grenoble France). Successful installation took place in early October 2015. NIKA2 is designed as a facility instrument which will remain at its present position for at least a decade. The instrument will allow to also measure linear polarizations at 1.15 mm.

NIKA2 in the web:


Overview

Some prelimiary characteristics of NIKA-2:

Band

Number of KIDs

Wavelength

Bandwidth

NEFD

HPBW

FoV

NIKA2 2 mm/150 GHz

616

2.00 mm

125-170 GHz

20 mJy*s1/2

18"

6.5'

NIKA2 1 mm/260 GHz

2x1140

1.15 mm

240-280 GHz

30 mJy*s1/2

12"

6.5'

Comments: A new 2mm array with 616 pixels was installed mid September 2016. The previously installed array had 1020 pixels. Further changes in September 2016 are a new dichroic frequency splitter, new lenses and a new cryostat window. In addition, several of the 20 readout electronics boards have been replaced with the last version. NIKA2 now has a homogeneous set of boards, plus several spare boards. Commissioning will start on October, 4th and will continue into the winter semester, when NIKA2 shall be opened to the community.

Call for proposals and time estimator

In the upcoming winter semester 2016, running from December 2016 to May 2017, a limited amount of time will be available for NIKA2 science projects. See the call for proposals. No polarization measurement is offered for the time being. On the following page, we give information on how to estimate total observing times:


Guaranteed Time Programs: Abstracts and source lists

Four Large Programs for NIKA2 in guaranteed time were submitted to the Program Committee for the deadline in September 2016. All four have been rated high by the PC. Here, we provide the proposal abstracts together with the list of sources and map sizes. These shall be "fenced" against new continuum mapping projects at the 30m or NOEMA. <18-January 2017>

Publications

  • Instrument/detectors papers:
    • Bourrion et al. 2016, NIKEL_AMC: Readout electronics for the NIKA2 experiment, arxiv

    • Catalano et al. 2016, The NIKA2 commissioning campaign: performance and first results, arxiv

    • Calvo et al. 2016, The NIKA2 instrument, a dual-band kilopixel KID array for millimetric astronomy, arxiv

    • Goupy et al. 2016, Microfabrication technology for large LEKID arrays : from NIKA2 to future applications, arxiv

    • Monfardini et al. 2014, Latest NIKA Results and the NIKA-2 Project, JLTP 176, 787, arxiv

    • Catalano et al. 2014, Performance and calibration of the NIKA camera at the IRAM 30 m telescope, A&A 569, A9, arxiv

    • Calvo et al. 2013, Improved mm-wave photometry for kinetic inductance detectors, A&A, 551, L12 ADS

    • Bourrion et al. 2012, NIKEL: Electronics and data acquisition for kilopixels kinetic inductance camera, Journal of Instrumentation, 7, 07, pp. 7014. arXiv

    • Monfardini et al. 2011, A Dual-band Millimeter-wave Kinetic Inductance Camera for the IRAM 30 m Telescope, ApJS, 194, 2, article id. 24. arXiv

    • Internal list of technical papers

  • Astronomical papers:
    • Ritacco, A., Ponthieu, N, Catalano, A., et al, 2016, Polarimetry at millimeter wavelengths with the NIKA camera: calibration and performance, A&A, astro-ph

    • Ruppin, F., Adam, R., Comis, B., et al. 2016, Non parametric deprojection of NIKA SZ observations: pressure distribution in the Planck-discovered cluster PSZ1 G045.85+57.71, A&A, in press ADS

    • Adam, R., Bartalucci, I., Pratt, G. W., et al. 2016, Mapping the kinetic Sunyaev-Zel'dovich effect toward MACS J0717.5+3745 with NIKA, A&A, in press ADS

    • Adam, R., Comis, B., Bartalucci, I., et al. 2016, High angular resolution Sunyaev-Zel'dovich observations of MACS J1423.8+2404 with NIKA: Multiwavelength analysis, A&A, 586, 122 ADS

    • Adam, R., Comis, B., Macias-Perez, J.-F., et al, 2015, Pressure distribution of the high-redshift cluster of galaxies CL J1226.9+3332 with NIKA, A&A, 576, A12 ADS

    • Adam, R., Comis, B., Macias-Perez, J.-F, et al, 2014, First observation of the thermal Sunyaev-Zel'dovich effect with kinetic inductance detectors, A&A, 569, 66 ADS

  • Ph.D. thesis:
  • Talks:
  • NIKA2 publications list maintained at IPAG


Technical Documentation

Go to the top


Technical runs to commission NIKA2

  • 1st test run of NIKA2: 29-October-2015 till 10-November-2015. Installation, cool down at the 30m, testing/debugging/developing. [= Run 13 of a NIKA instrument]

  • 2nd test run of NIKA2: 24-November-2015 till 02-December-2015. Continue tests started during run 1, in particular Beam maps and NEFD with the 13 NIKEL boards assembled the last days of run 1. [= Run 14 of a NIKA instrument]

  • 3rd test run of NIKA2: 12-January-2016 till 01-February-2016. Implementation of new NIKEL boards; the 20 data lines of NIKA2 are foreseen to be plugged simultaneously. With the 3 arrays fully read, continue and redo tests started with runs 1 & 2, in particular Beam maps and NEFD. [= Run 15 of a NIKA instrument]

  • 4th test run of NIKA2: 1-March-2016 till 15-March-2016. Continue tests started with previous runs, in particular investigate deeper beam patterns (XY focus, beam maps), synchronization, array 1 & 3 performances vs electronic boards, NEFD, mapping strategies. [= Run 16 of a NIKA instrument]

  • Dark run: 4-May-2016. Test sensitivity of NIKA2 to external electromagnetic perturbations, with the entrance window of the cryostat closed. [= Run 17 of a NIKA instrument]

  • 5th test run of NIKA2: 16-September-2016 till 11-October-2016. Upgrade NIKA2 with new dichroic, new corrugated lenses and window, new 2mm array, new NIKEL boards (get the 20 lines with homogeneous electronics, v3); redo better the tests started with previous runs (mostly beam maps in best weather conditions, but also various types of scan to investigate deeper beams and noise, synchronization, NEFD, skydips, mapping strategies, possibly polarization. [= Run 18 of a NIKA instrument]

  • 6th test run of NIKA2: 25-October-2016 till 1-November-2016. Continue NIKA2 commissioning. [= Run 19 of a NIKA instrument]

  • 7th test run of NIKA2: 6-December-2016 till 13-December-2016. Test DRO based external calibrator, continue NIKA2 commissioning. [= Run 20 of a NIKA instrument]

  • 8th test run of NIKA2: 9-January-2017 to 13-January-2017, then 23-January to 27-January, then 21-February to 28-Fevruary. Reverse array 1 lens to smooth version, continue NIKA2 commissioning. [= Run 21 of a NIKA instrument]