10556
Comment:
|
12678
|
Deletions are marked like this. | Additions are marked like this. |
Line 4: | Line 4: |
Successful installation took place in early October 2015. NIKA2's field of view has a 6.5arcmin diameter, with angular resolutions of 12 and 18 arcsec at 1 and 2 mm wavelengths respectively. NIKA2 is designed as a facility instrument which will remain at its present position for at least a decade. The instrument will allow to measure linear polarizations at 1.15 mm. | Successful installation took place in early October 2015. NIKA2 is designed as a facility instrument which will remain at its present position for at least a decade. The instrument will allow to also measure linear polarizations at 1.15 mm. |
Line 6: | Line 6: |
For September 2016, some important changes to the hardware are currently being prepared: the 150 GHz array, the dichroic frequency splitter, the lenses, and the cryostat window will be replaced and upgraded. In addition, several of the 20 readout electronics boards will be replaced with the last version. Commissioning will then continue well into the winter semester and NIKA2 shall be opened to the community in 2017. |
|
Line 25: | Line 22: |
|| NIKA2 2 mm/150 GHz || 1020 || 2.00 mm || 125-170 GHz || 20 mJy*s^1/2^ || 18" || 6.5' || | || NIKA2 2 mm/150 GHz || 616 || 2.00 mm || 125-170 GHz || 20 mJy*s^1/2^ || 18" || 6.5' || |
Line 28: | Line 25: |
Note that the 2mm array will be replaced in September 2016. | Comments: A new 2mm array with 616 pixels was installed mid September 2016. The previously installed array had 1020 pixels. Further changes in September 2016 are a new dichroic frequency splitter, new lenses and a new cryostat window. In addition, several of the 20 readout electronics boards have been replaced with the last version. NIKA2 now has a homogeneous set of boards, plus several spare boards. Commissioning will start on October, 4th and will continue into the winter semester, when NIKA2 shall be opened to the community. |
Line 38: | Line 36: |
== Guaranteed Time Programs: Abstracts and source lists == Four Large Programs for NIKA2 in guaranteed time were submitted to the Program Committee for the deadline in September 2016. All four have been rated high by the PC. Here, we provide the proposal abstracts together with the list of sources and map sizes. These shall be "fenced" against new continuum mapping projects at the 30m or NOEMA. <18-January 2017> |
|
Line 42: | Line 44: |
* Bourrion et al. 2016, '''NIKEL_AMC: Readout electronics for the NIKA2 experiment''', [[https://arxiv.org/abs/1602.01288|arxiv]] | |
Line 53: | Line 56: |
* Ritacco, A., Ponthieu, N, Catalano, A., et al, 2016, '''Polarimetry at millimeter wavelengths with the NIKA camera: calibration and performance''', A&A, [[https://arxiv.org/abs/1609.02042|astro-ph]] * Ruppin, F., Adam, R., Comis, B., et al. 2016, '''Non parametric deprojection of NIKA SZ observations: pressure distribution in the Planck-discovered cluster PSZ1 G045.85+57.71''', A&A, in press [[http://adsabs.harvard.edu/cgi-bin/bib_query?arXiv:1607.07679|ADS]] * Adam, R., Bartalucci, I., Pratt, G. W., et al. 2016, '''Mapping the kinetic Sunyaev-Zel'dovich effect toward MACS J0717.5+3745 with NIKA''', A&A, in press [[http://esoads.eso.org/abs/2016arXiv160607721A|ADS]] |
|
Line 60: | Line 65: |
* Talks: * Alessia Ritacco, November 2016, '''Polarimetry at Millimeter wavelengths with NIKA and NIKA2''' [[attachment:ritacco-seminar-nika2-nov2016.pdf]] |
|
Line 71: | Line 79: |
* [[http://www.iram.es/IRAMES/mainWiki/Continuum/NIKA2/InstrumentalDoc | Instrument-related documentation page ]] | |
Line 131: | Line 140: |
* '''6^th^ test run of NIKA2''': 25-October-2016 till 1-November-2016. Continue NIKA2 commissioning. [= Run 19 of a NIKA instrument] * [[Nika2Run6|Go to the 6th run Wiki page]] * '''7^th^ test run of NIKA2''': 6-December-2016 till 13-December-2016. Test DRO based external calibrator, continue NIKA2 commissioning. [= Run 20 of a NIKA instrument] * [[Nika2Run7|Go to the 7th run Wiki page]] * '''8^th^ test run of NIKA2''': 9-January-2017 to 13-January-2017, then 23-January to 27-January, then 21-February to 28-Fevruary. Reverse array 1 lens to smooth version, continue NIKA2 commissioning. [= Run 21 of a NIKA instrument] * [[Nika2Run8|Go to the 8th run Wiki page]] |
|
Line 138: | Line 157: |
* '''Alain Benoit''' <alain.benoit@grenoble.cnrs.fr> (PI, IN) * '''Alessandro Monfardini''' <monfardini@neel.cnrs.fr> (co-PI, IN) |
* '''Alessandro Monfardini''' <monfardini@neel.cnrs.fr> (PI, IN) * Alain Benoit <alain.benoit@grenoble.cnrs.fr> |
Line 161: | Line 180: |
Last update: 29-Jul-2016 | Last update: 1-Oct-2016 |
NIKA2 Homepage
NIKA2, the second generation New-IRAM-KID-Array, is a dual band camera operating simultaneously at 150 and 260 GHz. The instrument is based on large arrays of superconducting Kinetic Inductance Detectors (KID) operated at temperatures of 100mK. NIKA2 is built by an international consortium, led by the Institute Neel (Grenoble France). Successful installation took place in early October 2015. NIKA2 is designed as a facility instrument which will remain at its present position for at least a decade. The instrument will allow to also measure linear polarizations at 1.15 mm.
Contents
NIKA2 in the web:
Overview
Some prelimiary characteristics of NIKA-2:
Band |
Number of KIDs |
Wavelength |
Bandwidth |
NEFD |
HPBW |
FoV |
NIKA2 2 mm/150 GHz |
616 |
2.00 mm |
125-170 GHz |
20 mJy*s1/2 |
18" |
6.5' |
NIKA2 1 mm/260 GHz |
2x1140 |
1.15 mm |
240-280 GHz |
30 mJy*s1/2 |
12" |
6.5' |
Comments: A new 2mm array with 616 pixels was installed mid September 2016. The previously installed array had 1020 pixels. Further changes in September 2016 are a new dichroic frequency splitter, new lenses and a new cryostat window. In addition, several of the 20 readout electronics boards have been replaced with the last version. NIKA2 now has a homogeneous set of boards, plus several spare boards. Commissioning will start on October, 4th and will continue into the winter semester, when NIKA2 shall be opened to the community.
Call for proposals and time estimator
In the upcoming winter semester 2016, running from December 2016 to May 2017, a limited amount of time will be available for NIKA2 science projects. See the call for proposals. No polarization measurement is offered for the time being. On the following page, we give information on how to estimate total observing times:
Guaranteed Time Programs: Abstracts and source lists
Four Large Programs for NIKA2 in guaranteed time were submitted to the Program Committee for the deadline in September 2016. All four have been rated high by the PC. Here, we provide the proposal abstracts together with the list of sources and map sizes. These shall be "fenced" against new continuum mapping projects at the 30m or NOEMA. <18-January 2017>
Publications
- Instrument/detectors papers:
Bourrion et al. 2016, NIKEL_AMC: Readout electronics for the NIKA2 experiment, arxiv
Catalano et al. 2016, The NIKA2 commissioning campaign: performance and first results, arxiv
Calvo et al. 2016, The NIKA2 instrument, a dual-band kilopixel KID array for millimetric astronomy, arxiv
Goupy et al. 2016, Microfabrication technology for large LEKID arrays : from NIKA2 to future applications, arxiv
Monfardini et al. 2014, Latest NIKA Results and the NIKA-2 Project, JLTP 176, 787, arxiv
Catalano et al. 2014, Performance and calibration of the NIKA camera at the IRAM 30 m telescope, A&A 569, A9, arxiv
Calvo et al. 2013, Improved mm-wave photometry for kinetic inductance detectors, A&A, 551, L12 ADS
Bourrion et al. 2012, NIKEL: Electronics and data acquisition for kilopixels kinetic inductance camera, Journal of Instrumentation, 7, 07, pp. 7014. arXiv
Monfardini et al. 2011, A Dual-band Millimeter-wave Kinetic Inductance Camera for the IRAM 30 m Telescope, ApJS, 194, 2, article id. 24. arXiv
- Astronomical papers:
Ritacco, A., Ponthieu, N, Catalano, A., et al, 2016, Polarimetry at millimeter wavelengths with the NIKA camera: calibration and performance, A&A, astro-ph
Ruppin, F., Adam, R., Comis, B., et al. 2016, Non parametric deprojection of NIKA SZ observations: pressure distribution in the Planck-discovered cluster PSZ1 G045.85+57.71, A&A, in press ADS
Adam, R., Bartalucci, I., Pratt, G. W., et al. 2016, Mapping the kinetic Sunyaev-Zel'dovich effect toward MACS J0717.5+3745 with NIKA, A&A, in press ADS
Adam, R., Comis, B., Bartalucci, I., et al. 2016, High angular resolution Sunyaev-Zel'dovich observations of MACS J1423.8+2404 with NIKA: Multiwavelength analysis, A&A, 586, 122 ADS
Adam, R., Comis, B., Macias-Perez, J.-F., et al, 2015, Pressure distribution of the high-redshift cluster of galaxies CL J1226.9+3332 with NIKA, A&A, 576, A12 ADS
Adam, R., Comis, B., Macias-Perez, J.-F, et al, 2014, First observation of the thermal Sunyaev-Zel'dovich effect with kinetic inductance detectors, A&A, 569, 66 ADS
- Ph.D. thesis:
Rémi Adam (2012-2015) - Advisors: J.F. Macías-Pérez and F.X. Désert (Observation des amas de galaxies par effet Sunyaev-Zel'dovich et de la polarisation du fond diffus cosmologique : de Planck à NIKA (in French))
- Talks:
Alessia Ritacco, November 2016, Polarimetry at Millimeter wavelengths with NIKA and NIKA2 ritacco-seminar-nika2-nov2016.pdf
Technical Documentation
NIKA2 tuning procedure and data flagging description, M.Calvo, Feb-2016
- Wiki-pages:
Pool Preparation provides information on the observing modes offered for NIKA2 and examples of the scripts that you must prepare to observe your project.
Observing Session provides an example of a typical session with NIKA2 at the 30m telescope.
Pointing sources and calibrators provides a list of pointing sources and calibrators.
Technical runs to commission NIKA2
1st test run of NIKA2: 29-October-2015 till 10-November-2015. Installation, cool down at the 30m, testing/debugging/developing. [= Run 13 of a NIKA instrument]
2nd test run of NIKA2: 24-November-2015 till 02-December-2015. Continue tests started during run 1, in particular Beam maps and NEFD with the 13 NIKEL boards assembled the last days of run 1. [= Run 14 of a NIKA instrument]
3rd test run of NIKA2: 12-January-2016 till 01-February-2016. Implementation of new NIKEL boards; the 20 data lines of NIKA2 are foreseen to be plugged simultaneously. With the 3 arrays fully read, continue and redo tests started with runs 1 & 2, in particular Beam maps and NEFD. [= Run 15 of a NIKA instrument]
4th test run of NIKA2: 1-March-2016 till 15-March-2016. Continue tests started with previous runs, in particular investigate deeper beam patterns (XY focus, beam maps), synchronization, array 1 & 3 performances vs electronic boards, NEFD, mapping strategies. [= Run 16 of a NIKA instrument]
Dark run: 4-May-2016. Test sensitivity of NIKA2 to external electromagnetic perturbations, with the entrance window of the cryostat closed. [= Run 17 of a NIKA instrument]
5th test run of NIKA2: 16-September-2016 till 11-October-2016. Upgrade NIKA2 with new dichroic, new corrugated lenses and window, new 2mm array, new NIKEL boards (get the 20 lines with homogeneous electronics, v3); redo better the tests started with previous runs (mostly beam maps in best weather conditions, but also various types of scan to investigate deeper beams and noise, synchronization, NEFD, skydips, mapping strategies, possibly polarization. [= Run 18 of a NIKA instrument]
6th test run of NIKA2: 25-October-2016 till 1-November-2016. Continue NIKA2 commissioning. [= Run 19 of a NIKA instrument]
7th test run of NIKA2: 6-December-2016 till 13-December-2016. Test DRO based external calibrator, continue NIKA2 commissioning. [= Run 20 of a NIKA instrument]
8th test run of NIKA2: 9-January-2017 to 13-January-2017, then 23-January to 27-January, then 21-February to 28-Fevruary. Reverse array 1 lens to smooth version, continue NIKA2 commissioning. [= Run 21 of a NIKA instrument]
Support teams
- Overall coordinator:
Samuel Leclercq (IRAM/Grenoble, <leclercq@iram.fr>)
- NIKA2 team:
Alessandro Monfardini <monfardini@neel.cnrs.fr> (PI, IN)
Alain Benoit <alain.benoit@grenoble.cnrs.fr>
François-Xavier Désert <francois-xavier.desert@univ-grenoble-alpes.fr> (IPAG)
Martino Calvo <martino.calvo@neel.cnrs.fr> (IN)
Johannes Goupy <johannes.goupy@neel.cnrs.fr> (IN)
Nicolas Ponthieu <nicolas.ponthieu@univ-grenoble-alpes.fr> (IPAG)
Juan Macias-Perez <macias@lpsc.in2p3.fr> (LPSC)
Andrea Catalano <catalano@lpsc.in2p3.fr> (LPSC)
Laurence Perotto <laurence.perotto@lpsc.in2p3.fr> (LPSC)
- IRAM/Granada NIKA2 support team:
Carsten Kramer (Station Manager and Scheduler, <kramer@iram.es>)
Pablo Garcia (time estimator, continuum Pool Manager, <pgarcia@iram.es>)
Albrecht Sievers (IMBfits, <sievers@iram.es>)
Hans Ungerechts (NCS/pako, <ungerechts@iram.es>)
Pablo Mellado (Computers/Network, <mellado@iram.es>)
Author: Israel Hermelo. Created: 5-Aug-2015. This page is maintained by PG, CK, SL and the NIKA team. Last update: 1-Oct-2016