= NIKA2 = = NIKA2 Homepage =
Line 3: Line 3:
The New Instrument of Kids Arrays (NIKA2) is the next generation continuum instrument to be placed at the 30m telescope of IRAM, at Pico Veleta (Spain). The instrument is based on Kinetic Inductance Detectors (KIDS). The baseline detector focal plane units consist of 1000 detectors at 2 mm and 4000 detectors at 1.25 mm. The instrument will provide the measurement of the linear polarization at 1.25 mm. NIKA2, the second generation New-IRAM-KID-Array, is a dual band camera operating simultaneously at 150 and 260 GHz. The instrument is based on large arrays of superconducting Kinetic Inductance Detectors (KID) operated at temperatures of 100mK. NIKA2 is built by an international consortium, led by the Institute Neel (Grenoble France).
Successful installation took place in early October 2015. NIKA2's field of view has a 6.5arcmin diameter, with angular resolutions of 12 and 18 arcsec at 1 and 2 mm wavelengths respectively. NIKA2 is designed as a facility instrument which will remain at its present position for at least a decade. The instrument will allow to measure linear polarizations at 1.15 mm.
Line 7: Line 9:
'''[[ http://www.iram.es/IRAMES/mainWiki/Continuum/NIKA2/Main | Go to the Front Page ]]'''

NIKA2 in the web:
 * [[http://ipag.osug.fr/nika2/Welcome.html | NIKA2 website at IPAG ]]
 * [[http://www.iram.fr/wiki/nika2/index.php/Nika2Wiki | NIKA2-internal wiki at IRAM-FR ]].
Line 13: Line 19:
The main characteristics of the latest configuration (2015.AUG.05) are summarized on the following table. Some prelimiary characteristics of NIKA-2:
Line 15: Line 21:
|| '''Band''' || '''Number of KIDs''' || '''Wavelength''' || '''Bandwidth ''' || '''NEFD'''  || '''HPBW''' || '''FoV''' ||
|| NIKA 2 mm || 1000 || 2.0 mm || xxx GHz   || 10 mJy*s^1/2^ || 18.5"  || 6.5' ||
|| NIKA 1 mm || 2x2000 || 1.2 mm || xxx GHz   || 15 mJy*s^1/2^ || 11.0" || 6.5' ||
|| '''Band''' || '''Number of KIDs''' || '''Wavelength'''  || '''Bandwidth ''' || '''NEFD''' || '''HPBW''' || '''FoV''' ||
|| NIKA2 2 mm/150 GHz || 616 || 2.00 mm || 125-170 GHz || 20 mJy*s^1/2^ || 18" || 6.5' ||
|| NIKA2 1 mm/260 GHz || 2x1140 || 1.15 mm || 240-280 GHz || 30 mJy*s^1/2^ || 12" || 6.5' ||
Line 19: Line 25:
 * [[http://ipag.osug.fr/nika2/Welcome.html | NIKA2 official website ]]
 * [[http://www.iram.fr/wiki/nika2/index.php/Nika2Wiki | Private wiki]].
Comments: A new 2mm array with 616 pixels was installed mid September 2016. The previously installed array had 1020 pixels. Further changes in September 2016 are a new dichroic frequency splitter, new lenses and a new cryostat window. In addition, several of the 20 readout electronics boards have been replaced with the last version. NIKA2 now has a homogeneous set of boards, plus several spare boards. Commissioning will start on October, 4th and will continue into the winter semester, when NIKA2 shall be opened to the community.
Line 23: Line 28:
---- == Call for proposals and time estimator ==
Line 25: Line 30:
== Call for proposals == In the upcoming winter semester 2016, running from December 2016 to May 2017, a limited amount of time will be available for NIKA2 science projects. See the [[http://www.iram-institute.org/EN/content-page-169-7-57-169-0-0.html | call for proposals ]]. No polarization measurement is offered for the time being. On the following page, we give information on how to estimate total observing times:
Line 27: Line 32:
NIKA2 is not offered to the community yet.

## NIKA2 is offered to the community in our regular calls for proposals:
##
## * [[http://www.iram-institute.org/EN/content-page-169-7-57-169-0-0.html | Call for observing proposals with the 30m]]
## * [[http://www.iram.es/IRAMES/mainWiki/Continuum/TimeEstimatorScript | Guidelines to estimate observing times]].
 * [[http://www.iram.es/IRAMES/mainWiki/Continuum/TimeEstimatorScript | Guidelines to estimate observing times]].
Line 38: Line 38:
 * Technical papers:  * Instrument/detectors papers:
Line 40: Line 40:
   * Catalano, A., Goupy, J., Le Sueur, H., et al, 2015, A&A submitted
   * Monfardini, A., Adam, R., Adane, A., et al, 2014, JLTP, Vol. 176, Issue 5-6, pp. 787-795
   * Bourrion, O., Vescovi, C., Catalano, A. et al, 2013, Journ. of Instr., Vol. 8, Issue 12, article id. C12006
   * Bourrion, O., Vescovi, C., Bouly J.-L. et al, 2012, Journ. of Instr., Vol. 7, Issue 07, pp. 7014
   * Bourrion, O., Bideaud, A., Benoit, A., et al, 2011, Journ. of Instr., Vol. 6, Issue 06, pp. 6012
   * Catalano et al. 2016, '''The NIKA2 commissioning campaign: performance and first results''', [[http://arxiv.org/abs/1605.08628|arxiv]]
   * Calvo et al. 2016, '''The NIKA2 instrument, a dual-band kilopixel KID array for millimetric astronomy''', [[http://arxiv.org/abs/arXiv:1601.02774|arxiv]]
   * Goupy et al. 2016, '''Microfabrication technology for large LEKID arrays : from NIKA2 to future applications''', [[http://arxiv.org/abs/1601.03969|arxiv]]
   * Monfardini et al. 2014, '''Latest NIKA Results and the NIKA-2 Project''', JLTP 176, 787, [[http://arxiv.org/abs/arXiv:1310.1230|arxiv]]
   * Catalano et al. 2014, '''Performance and calibration of the NIKA camera at the IRAM 30 m telescope''', A&A 569, A9, [[http://arxiv.org/abs/arXiv:1402.0260|arxiv]]
   * Calvo et al. 2013, '''Improved mm-wave photometry for kinetic inductance detectors''', A&A, 551, L12 [[http://adsabs.harvard.edu/abs/2013A%26A...551L..12C|ADS]]
   * Bourrion et al. 2012, '''NIKEL: Electronics and data acquisition for kilopixels kinetic inductance camera''', Journal of Instrumentation, 7, 07, pp. 7014. [[http://arxiv.org/abs/1204.1415|arXiv]]
   * Monfardini et al. 2011, '''A Dual-band Millimeter-wave Kinetic Inductance Camera for the IRAM 30 m Telescope''', ApJS, 194, 2, article id. 24. [[http://arxiv.org/abs/1102.0870|arXiv]]
   * [[http://www.iram.fr/wiki/nika2/index.php/Technical_NIKA_papers_to_be_cited|Internal list of technical papers]]
Line 47: Line 51:
   * Ritacco, A., Ponthieu, N, Catalano, A., et al, 2016, '''Polarimetry at millimeter wavelengths with the NIKA camera: calibration and performance''', A&A, [[https://arxiv.org/abs/1609.02042|astro-ph]]
   * Ruppin, F., Adam, R., Comis, B., et al. 2016, '''Non parametric deprojection of NIKA SZ observations: pressure distribution in the Planck-discovered cluster PSZ1 G045.85+57.71''', A&A, in press [[http://adsabs.harvard.edu/cgi-bin/bib_query?arXiv:1607.07679|ADS]]
   * Adam, R., Bartalucci, I., Pratt, G. W., et al. 2016, '''Mapping the kinetic Sunyaev-Zel'dovich effect toward MACS J0717.5+3745 with NIKA''', A&A, in press [[http://esoads.eso.org/abs/2016arXiv160607721A|ADS]]
   * Adam, R., Comis, B., Bartalucci, I., et al. 2016, '''High angular resolution Sunyaev-Zel'dovich observations of MACS J1423.8+2404 with NIKA: Multiwavelength analysis''', A&A, 586, 122 [[http://esoads.eso.org/abs/2016A%26A...586A.122A|ADS]]
   * Adam, R., Comis, B., Macias-Perez, J.-F., et al, 2015, '''Pressure distribution of the high-redshift cluster of galaxies CL J1226.9+3332 with NIKA''', A&A, 576, A12 [[http://adsabs.harvard.edu/abs/2015A%26A...576A..12A|ADS]]
   * Adam, R., Comis, B., Macias-Perez, J.-F, et al, 2014, '''First observation of the thermal Sunyaev-Zel'dovich effect with kinetic inductance detectors''', A&A, 569, 66 [[http://adsabs.harvard.edu/abs/2014A%26A...569A..66A|ADS]]
Line 48: Line 58:
   * Adam, A., Comis, B., Macias-Perez, J.-F., et al, 2015, A&A, 576, A12
   * Catalano, A., Ponthieu, N., Calvo M., et al, 2014, A&A, 569, A9
   * Adam, R., Comis, B., Macias-Perez, J.-F, et al, 2014, A&A in press
   * Calvo, M., Roesh, M., Désert, F.-X., et al, 2013, A&A, 551, L12
   * Monfardini, A., Benoit, A., Bideaud, A., et al, 2011, ApJs, 194, 24
   * Monfardini, A., Swenson, L. J., Bideaud, A., et al, 2010, AAp, 521, A29
 * Ph.D. thesis:
   * ''Rémi Adam (2012-2015) - Advisors: J.F. Macías-Pérez and F.X. Désert'' ([[https://tel.archives-ouvertes.fr/tel-01303736 | Observation des amas de galaxies par effet Sunyaev-Zel'dovich et de la polarisation du fond diffus cosmologique : de Planck à NIKA (in French)]])

 * [[http://ipag.osug.fr/nika2/Publications.html|NIKA2 publications list maintained at IPAG]]
Line 57: Line 65:
== Support teams == == Technical Documentation ==
Line 59: Line 67:
 * Overall coordinator:
  * '''Samuel Leclercq''' (IRAM/Grenoble, <leclercq@iram.fr>)
 * [[attachment:calvo-feb2016-nika2-camadia.pdf | NIKA2 Data Acquisition, Camadia, M.Calvo, Feb-2016 ]]
Line 62: Line 69:
 * NIKA team:
  * '''Alain Benoit''' <alain.benoit@grenoble.cnrs.fr> (PI, IN)
  * '''Alessandro Monfardini''' <monfardini@grenoble.cnrs.fr> (co-PI, IN)
  * François-Xavier Désert <francois-xavier.desert@obs.ujf-grenoble.fr> (IPAG)
  * Martino Calvo <martino.calvo@grenoble.cnrs.fr> (IN)
  * Antonio D'Addabbo <antonio.d-addabbo@grenoble.cnrs.fr> (IN)
  * Nicolas Ponthieu (IPAG)
  * Juan Macias-Perez <macias@lpsc.in2p3.fr> (LPSC)
  * Andrea Catalano <catalano@lpsc.in2p3.fr> (LPSC)
  * Remi Adam <adam@lpsc.in2p3.fr> (LPSC)
 * [[attachment:calvo-docTuning_feb2016.pdf | NIKA2 tuning procedure and data flagging description, M.Calvo, Feb-2016 ]]
Line 73: Line 71:
 * IRAM/Granada support team:
  * '''Carsten Kramer''' (Station Manager, <kramer@iram.es>)
  * Israel Hermelo (30m Continuum Pool Manager, <hermelo@iram.es>)
  * Nicolas Billot (30m Scheduler, <billot@iram.es>)
  * Claudia Marka (30m Heterodyne Pool Manager, <marka@iram.es>)
  * Albrecht Sievers (<sievers@iram.es>)
Line 80: Line 72:
----  * Wiki-pages:
Line 82: Line 74:
== How-to's ==    * [[http://www.iram.es/IRAMES/mainWiki/OffProcNika2Run1Beam | Discussion on beams ]]
Line 84: Line 76:
 * [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolPreparation | Pool Preparation]] provides information on the observing modes offered for the continuum cameras as well as examples of the scripts that you need to prepare to observe your project.    * [[http://www.iram.es/IRAMES/mainWiki/Spectral%20bands | Spectral bands ]]
Line 86: Line 78:
 * [[http://www.iram.es/IRAMES/mainWiki/Continuum/ObservingSession | Observing Session]] provides an example of a typical session with the continuum cameras at the 30m telescope.    * [[http://www.iram.es/IRAMES/mainWiki/Continuum/NetworkAccess | Remote network access to NIKA-2 ]]
Line 88: Line 80:
 * [[http://www.iram.es/IRAMES/mainWiki/Continuum/Calibrators | Pointing sources and calibrators ]] provides a list of pointing sources and calibrators for the IRAM 30m continuum cameras.    * [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolPreparation | Pool Preparation]] provides information on the observing modes offered for NIKA2 and examples of the scripts that you must prepare to observe your project.
Line 90: Line 82:
 * [[http://www.iram.es/IRAMES/mainWiki/Continuum/ObserveGRBs | Observe GRBs]]    * [[http://www.iram.es/IRAMES/mainWiki/Continuum/ObservingSession | Observing Session]] provides an example of a typical session with NIKA2 at the 30m telescope.

   * [[http://www.iram.es/IRAMES/mainWiki/Continuum/Calibrators | Pointing sources and calibrators ]] provides a list of pointing sources and calibrators.

## * [[http://www.iram.es/IRAMES/mainWiki/Continuum/TimeEstimatorScript|Time Estimator (UNDER CONSTRUCTION)]]

## * [[http://www.iram.es/IRAMES/mainWiki/Continuum/ObserveGRBs | Observe GRBs]]
Line 109: Line 107:
'''[[ http://www.iram.es/IRAMES/mainWiki/Continuum/NIKA2/Main | Go to the top ]]'''
Line 111: Line 111:
== Technical runs == == Technical runs to commission NIKA2 ==
Line 113: Line 113:
=== Commissioning (October 2015) ===  * '''1^st^ test run of NIKA2''': 29-October-2015 till 10-November-2015. Installation, cool down at the 30m, testing/debugging/developing. [= Run 13 of a NIKA instrument]
  * [[Nika2Run1|Go to the 1st run Wiki page]]
  * [[http://www.iram.fr/wiki/nika2/index.php/NIKA2_Run1_30m_CharacterizationPlan | Private Wiki detailing the organization of the run and the instrument characterization plan]]
Line 115: Line 117:
[[http://www.iram.es/IRAMES/mainWiki/Continuum/NIKA2/Commissioning | Go to the NIKA2 commissioning wiki]]  * '''2^nd^ test run of NIKA2''': 24-November-2015 till 02-December-2015. Continue tests started during run 1, in particular Beam maps and NEFD with the 13 NIKEL boards assembled the last days of run 1. [= Run 14 of a NIKA instrument]
  * [[Nika2Run2|Go to the 2nd run Wiki page]]
Line 117: Line 120:
=== Installation (September 2015) ===  * '''3^rd^ test run of NIKA2''': 12-January-2016 till 01-February-2016. Implementation of new NIKEL boards; the 20 data lines of NIKA2 are foreseen to be plugged simultaneously. With the 3 arrays fully read, continue and redo tests started with runs 1 & 2, in particular '''Beam maps''' and NEFD. [= Run 15 of a NIKA instrument]
  * [[Nika2Run3|Go to the 3rd run Wiki page]]
Line 119: Line 123:
[[http://www.iram.es/IRAMES/mainWiki/Continuum/NIKA2/Installation | Go to the NIKA2 installation wiki]]  * '''4^th^ test run of NIKA2''': 1-March-2016 till 15-March-2016. Continue tests started with previous runs, in particular investigate deeper beam patterns (XY focus, beam maps), synchronization, array 1 & 3 performances vs electronic boards, NEFD, mapping strategies. [= Run 16 of a NIKA instrument]
  * [[Nika2Run4|Go to the 4th run Wiki page]]
Line 121: Line 126:
 * '''Dark run''': 4-May-2016. Test sensitivity of NIKA2 to external electromagnetic perturbations, with the entrance window of the cryostat closed. [= Run 17 of a NIKA instrument]

 * '''5^th^ test run of NIKA2''': 16-September-2016 till 11-October-2016. Upgrade NIKA2 with new dichroic, new corrugated lenses and window, new 2mm array, new NIKEL boards (get the 20 lines with homogeneous electronics, v3); redo better the tests started with previous runs (mostly beam maps in best weather conditions, but also various types of scan to investigate deeper beams and noise, synchronization, NEFD, skydips, mapping strategies, possibly polarization. [= Run 18 of a NIKA instrument]
  * [[Nika2Run5|Go to the 5th run Wiki page]]


 * '''6^th^ test run of NIKA2''': 25-October-2016 till 1-November-2016. Continue NIKA2 commissioning. [= Run 19 of a NIKA instrument]
  * [[Nika2Run6|Go to the 6th run Wiki page]]
Line 124: Line 137:
== Support teams ==
Line 125: Line 139:
Author: Israel Hermelo (IRAM 30m continuum pool manager)  * Overall coordinator:
  * '''Samuel Leclercq''' (IRAM/Grenoble, <leclercq@iram.fr>)
Line 127: Line 142:
email: hermelo@iram.es
 
Created: 2015.AUG.05
 * NIKA2 team:
  * '''Alain Benoit''' <alain.benoit@grenoble.cnrs.fr> (PI, IN)
  * '''Alessandro Monfardini''' <monfardini@neel.cnrs.fr> (co-PI, IN)
  * François-Xavier Désert <francois-xavier.desert@univ-grenoble-alpes.fr> (IPAG)
  * Martino Calvo <martino.calvo@neel.cnrs.fr> (IN)
  * Johannes Goupy <johannes.goupy@neel.cnrs.fr> (IN)
  * Nicolas Ponthieu <nicolas.ponthieu@univ-grenoble-alpes.fr> (IPAG)
  * Juan Macias-Perez <macias@lpsc.in2p3.fr> (LPSC)
  * Andrea Catalano <catalano@lpsc.in2p3.fr> (LPSC)
  * Laurence Perotto <laurence.perotto@lpsc.in2p3.fr> (LPSC)
Line 131: Line 153:
This page is maintained by IH, CK, SL and the NIKA team  * IRAM/Granada NIKA2 support team:
  * Carsten Kramer (Station Manager and Scheduler, <kramer@iram.es>)
  * Pablo Garcia (time estimator, continuum Pool Manager, <pgarcia@iram.es>)
  * Albrecht Sievers (IMBfits, <sievers@iram.es>)
  * Hans Ungerechts (NCS/pako, <ungerechts@iram.es>)
  * Pablo Mellado (Computers/Network, <mellado@iram.es>)
Line 133: Line 160:
Last update: 2015.AUG.05 '''[[ http://www.iram.es/IRAMES/mainWiki/Continuum/NIKA2/Main | Go to top ]]'''

-------
Author: Israel Hermelo.
Created: 5-Aug-2015.
This page is maintained by PG, CK, SL and the NIKA team.
Last update: 1-Oct-2016

NIKA2 Homepage

NIKA2, the second generation New-IRAM-KID-Array, is a dual band camera operating simultaneously at 150 and 260 GHz. The instrument is based on large arrays of superconducting Kinetic Inductance Detectors (KID) operated at temperatures of 100mK. NIKA2 is built by an international consortium, led by the Institute Neel (Grenoble France). Successful installation took place in early October 2015. NIKA2's field of view has a 6.5arcmin diameter, with angular resolutions of 12 and 18 arcsec at 1 and 2 mm wavelengths respectively. NIKA2 is designed as a facility instrument which will remain at its present position for at least a decade. The instrument will allow to measure linear polarizations at 1.15 mm.

NIKA2 in the web:


Overview

Some prelimiary characteristics of NIKA-2:

Band

Number of KIDs

Wavelength

Bandwidth

NEFD

HPBW

FoV

NIKA2 2 mm/150 GHz

616

2.00 mm

125-170 GHz

20 mJy*s1/2

18"

6.5'

NIKA2 1 mm/260 GHz

2x1140

1.15 mm

240-280 GHz

30 mJy*s1/2

12"

6.5'

Comments: A new 2mm array with 616 pixels was installed mid September 2016. The previously installed array had 1020 pixels. Further changes in September 2016 are a new dichroic frequency splitter, new lenses and a new cryostat window. In addition, several of the 20 readout electronics boards have been replaced with the last version. NIKA2 now has a homogeneous set of boards, plus several spare boards. Commissioning will start on October, 4th and will continue into the winter semester, when NIKA2 shall be opened to the community.

Call for proposals and time estimator

In the upcoming winter semester 2016, running from December 2016 to May 2017, a limited amount of time will be available for NIKA2 science projects. See the call for proposals. No polarization measurement is offered for the time being. On the following page, we give information on how to estimate total observing times:


Publications

  • Instrument/detectors papers:
    • Catalano et al. 2016, The NIKA2 commissioning campaign: performance and first results, arxiv

    • Calvo et al. 2016, The NIKA2 instrument, a dual-band kilopixel KID array for millimetric astronomy, arxiv

    • Goupy et al. 2016, Microfabrication technology for large LEKID arrays : from NIKA2 to future applications, arxiv

    • Monfardini et al. 2014, Latest NIKA Results and the NIKA-2 Project, JLTP 176, 787, arxiv

    • Catalano et al. 2014, Performance and calibration of the NIKA camera at the IRAM 30 m telescope, A&A 569, A9, arxiv

    • Calvo et al. 2013, Improved mm-wave photometry for kinetic inductance detectors, A&A, 551, L12 ADS

    • Bourrion et al. 2012, NIKEL: Electronics and data acquisition for kilopixels kinetic inductance camera, Journal of Instrumentation, 7, 07, pp. 7014. arXiv

    • Monfardini et al. 2011, A Dual-band Millimeter-wave Kinetic Inductance Camera for the IRAM 30 m Telescope, ApJS, 194, 2, article id. 24. arXiv

    • Internal list of technical papers

  • Astronomical papers:
    • Ritacco, A., Ponthieu, N, Catalano, A., et al, 2016, Polarimetry at millimeter wavelengths with the NIKA camera: calibration and performance, A&A, astro-ph

    • Ruppin, F., Adam, R., Comis, B., et al. 2016, Non parametric deprojection of NIKA SZ observations: pressure distribution in the Planck-discovered cluster PSZ1 G045.85+57.71, A&A, in press ADS

    • Adam, R., Bartalucci, I., Pratt, G. W., et al. 2016, Mapping the kinetic Sunyaev-Zel'dovich effect toward MACS J0717.5+3745 with NIKA, A&A, in press ADS

    • Adam, R., Comis, B., Bartalucci, I., et al. 2016, High angular resolution Sunyaev-Zel'dovich observations of MACS J1423.8+2404 with NIKA: Multiwavelength analysis, A&A, 586, 122 ADS

    • Adam, R., Comis, B., Macias-Perez, J.-F., et al, 2015, Pressure distribution of the high-redshift cluster of galaxies CL J1226.9+3332 with NIKA, A&A, 576, A12 ADS

    • Adam, R., Comis, B., Macias-Perez, J.-F, et al, 2014, First observation of the thermal Sunyaev-Zel'dovich effect with kinetic inductance detectors, A&A, 569, 66 ADS

  • Ph.D. thesis:
  • NIKA2 publications list maintained at IPAG


Technical Documentation

Go to the top


Technical runs to commission NIKA2

  • 1st test run of NIKA2: 29-October-2015 till 10-November-2015. Installation, cool down at the 30m, testing/debugging/developing. [= Run 13 of a NIKA instrument]

  • 2nd test run of NIKA2: 24-November-2015 till 02-December-2015. Continue tests started during run 1, in particular Beam maps and NEFD with the 13 NIKEL boards assembled the last days of run 1. [= Run 14 of a NIKA instrument]

  • 3rd test run of NIKA2: 12-January-2016 till 01-February-2016. Implementation of new NIKEL boards; the 20 data lines of NIKA2 are foreseen to be plugged simultaneously. With the 3 arrays fully read, continue and redo tests started with runs 1 & 2, in particular Beam maps and NEFD. [= Run 15 of a NIKA instrument]

  • 4th test run of NIKA2: 1-March-2016 till 15-March-2016. Continue tests started with previous runs, in particular investigate deeper beam patterns (XY focus, beam maps), synchronization, array 1 & 3 performances vs electronic boards, NEFD, mapping strategies. [= Run 16 of a NIKA instrument]

  • Dark run: 4-May-2016. Test sensitivity of NIKA2 to external electromagnetic perturbations, with the entrance window of the cryostat closed. [= Run 17 of a NIKA instrument]

  • 5th test run of NIKA2: 16-September-2016 till 11-October-2016. Upgrade NIKA2 with new dichroic, new corrugated lenses and window, new 2mm array, new NIKEL boards (get the 20 lines with homogeneous electronics, v3); redo better the tests started with previous runs (mostly beam maps in best weather conditions, but also various types of scan to investigate deeper beams and noise, synchronization, NEFD, skydips, mapping strategies, possibly polarization. [= Run 18 of a NIKA instrument]

  • 6th test run of NIKA2: 25-October-2016 till 1-November-2016. Continue NIKA2 commissioning. [= Run 19 of a NIKA instrument]