Size: 16757
Comment:
|
Size: 16759
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 4: | Line 4: |
NIKA2 Homepage
The New IRAM KID Array 2 (NIKA2) is a dual-band camera operating with three frequency-multiplexed kilopixels arrays of Lumped Element Kinetic Inductance Detectors (LEKID) cooled at 150mK. NIKA2 is designed to observe simultaneously the intensity at 1.15 and 2.0 mm. In addition, it allows for polarisation observations at 1.15 mm. NIKA2 is built by an international consortium, led by the Institute Neel (Grenoble, France).
NIKA2 in the web:
Contents
NIKA2 Overview
Overview of NIKA2 capabilities
Open Time Programs
The five Guaranteed Time Large Programs
Listing of the Guaranteed Time Large Programs and abstracts
Publications
- Instrument/detectors papers:
- NIKA2
Adam et al. 2018, The NIKA2 large field-of-view millimeter continuum camera for the 30-m IRAM telescope, arxiv A&A
Catalano et al. 2016, The NIKA2 commissioning campaign: performance and first results, arxiv
Calvo et al. 2016, The NIKA2 instrument, a dual-band kilopixel KID array for millimetric astronomy, arxiv
- NIKA
Bourrion et al. 2016, NIKEL_AMC: Readout electronics for the NIKA2 experiment, arxiv
Ritacco et al. 2016, First polarised light with the NIKA camera, JLTP, Volume 184, Issue 3-4, pp. 724-732, 08/2016 arxiv
Goupy et al. 2016, Microfabrication technology for large LEKID arrays : from NIKA2 to future applications, arxiv
Monfardini et al. 2014, Latest NIKA Results and the NIKA-2 Project, JLTP 176, 787, arxiv
Catalano et al. 2014, Performance and calibration of the NIKA camera at the IRAM 30 m telescope, A&A 569, A9, arxiv
Calvo et al. 2013, Improved mm-wave photometry for kinetic inductance detectors, A&A, 551, L12 ADS
Bourrion et al. 2012, NIKEL: Electronics and data acquisition for kilopixels kinetic inductance camera, Journal of Instrumentation, 7, 07, pp. 7014. arXiv
Monfardini et al. 2011, A Dual-band Millimeter-wave Kinetic Inductance Camera for the IRAM 30 m Telescope, ApJS, 194, 2, article id. 24. arXiv
- NIKA2
- Astronomical papers:
- NIKA2
Ruppin et al. 2018, First Sunyaev-Zel'dovich mapping with NIKA2: implication of cluster substructures on the pressure profile and mass estimate, A&A (accepted) astro-ph
- NIKA
Adam et al. 2017, Mapping the hot gas temperature in galaxy clusters using X-ray and Sunyaev-Zel'dovich imaging, A&A, 606, 64 (in press) ADS
Bracco et al. 2017, Probing changes of dust properties along a chain of solar-type prestellar and protostellar cores in Taurus with NIKA, A&A, subm. ADS
Ritacco, A., Ponthieu, N, Catalano, A., et al, 2017, Polarimetry at millimeter wavelengths with the NIKA camera: calibration and performance, A&A 599, A34, ADS
Ruppin, F., Adam, R., Comis, B., et al. 2016, Non parametric deprojection of NIKA SZ observations: pressure distribution in the Planck-discovered cluster PSZ1 G045.85+57.71, A&A, in press ADS
Adam, R., Bartalucci, I., Pratt, G. W., et al. 2016, Mapping the kinetic Sunyaev-Zel'dovich effect toward MACS J0717.5+3745 with NIKA, A&A, in press ADS
Adam, R., Comis, B., Bartalucci, I., et al. 2016, High angular resolution Sunyaev-Zel'dovich observations of MACS J1423.8+2404 with NIKA: Multiwavelength analysis, A&A, 586, 122 ADS
Adam, R., Comis, B., Macias-Perez, J.-F., et al, 2015, Pressure distribution of the high-redshift cluster of galaxies CL J1226.9+3332 with NIKA, A&A, 576, A12 ADS
Adam, R., Comis, B., Macias-Perez, J.-F, et al, 2014, First observation of the thermal Sunyaev-Zel'dovich effect with kinetic inductance detectors, A&A, 569, 66 ADS
- NIKA2
- Ph.D. thesis:
Rémi Adam (2012-2015) - Advisors: J.F. Macías-Pérez and F.X. Désert (Observation des amas de galaxies par effet Sunyaev-Zel'dovich et de la polarisation du fond diffus cosmologique : de Planck à NIKA (in French))
Alessia Ritacco (2013-2016) - Advisors: J.F. Macías-Pérez, Alessandro Monfardini, Andrea Catalano, Nicolas Ponthieu (Polarimetry at millimeter wavelengths with the instruments NIKA and NIKA2)
- Talks:
Alessia Ritacco, November 2016, Polarimetry at Millimeter wavelengths with NIKA and NIKA2 ritacco-seminar-nika2-nov2016.pdf
Technical Documentation
Cryostat & Electronics
- Network
- Acquisition and tuning
- Observations
Pool observations provides information on the observing modes offered for NIKA2 and examples of the scripts that you must prepare to observe your project.
Observing session provides an example of a typical session with NIKA2 at the 30m telescope.
Pointing sources and calibrators provides a list of pointing sources and calibrators.
- Data reduction
- IDL pipeline
Science runs (Oct-2017 - May-2018)
Accepted projects in open time and in guaranteed time.
See the progress of observations in the Pool data base and in TAPAS. Both databases are synchronized and can be used to write/read a logsheet.
24-31 October 2017 - s17 [= Cryo Run 25, 12th of NIKA2]
Day to day logbook : Scan types table, Pipeline RTA logbook (Quicklook plots table)
16-23 January 2018 - w17 Pool #1 [= Cryo Run 27, 14th of NIKA2]
Day to day logbook : Pipeline RTA logbook (Quicklook plots table)
Calibration : Calibration Observation Plan & Summary
13-20 February 2018 - w17 Pool #2 [= Cryo Run 28, 15th of NIKA2]
Day to day logbook : Pipeline RTA logbook (Quicklook plots table)
Calibration : Calibration Observation Plan & Summary
13-20 March 2018 - w17 Pool #3 [= Cryo Run 30, 17th of NIKA2]
Day to day logbook : Pipeline RTA logbook (Quicklook plots table)
Calibration : Calibration Observation Plan & Summary
22-29 May 2018 - w17 Night time Pool #4 [= Cryo Run 31, 18th of NIKA2]
Day to day logbook : Pipeline RTA logbook (Quicklook plots table)
Calibration : Calibration Observation Plan & Summary
Commissioning runs
Phase I (October 2015 - April 2017)
1st run of NIKA2 (test): 29-October-2015 till 10-November-2015. Installation, cool down at the 30m, testing/debugging/developing. [= Run 13 of a NIKA instrument]
2nd run of NIKA2 (test): 24-November-2015 till 02-December-2015. Continue tests started during run 1, in particular Beam maps and NEFD with the 13 NIKEL boards assembled the last days of run 1. [= Run 14 of a NIKA instrument]
3rd run of NIKA2 (test): 12-January-2016 till 01-February-2016. Implementation of new NIKEL boards; the 20 data lines of NIKA2 are foreseen to be plugged simultaneously. With the 3 arrays fully read, continue and redo tests started with runs 1 & 2, in particular Beam maps and NEFD. [= Run 15 of a NIKA instrument]
4th run of NIKA2 (test): 1-March-2016 till 15-March-2016. Continue tests started with previous runs, in particular investigate deeper beam patterns (XY focus, beam maps), synchronization, array 1 & 3 performances vs electronic boards, NEFD, mapping strategies. [= Run 16 of a NIKA instrument]
Dark run: 4-May-2016. Test sensitivity of NIKA2 to external electromagnetic perturbations, with the entrance window of the cryostat closed. [= Run 17 of a NIKA instrument]
5th run of NIKA2 (test): 16-September-2016 till 11-October-2016. Upgrade NIKA2 with new dichroic, new corrugated lenses and window, new 2mm array, new NIKEL boards (get the 20 lines with homogeneous electronics, v3); redo better the tests started with previous runs (mostly beam maps in best weather conditions, but also various types of scan to investigate deeper beams and noise, synchronization, NEFD, skydips, mapping strategies, possibly polarization. [= Run 18 of a NIKA instrument]
6th run of NIKA2 (test): 25-October-2016 till 1-November-2016. Continue NIKA2 commissioning. [= Run 19 of a NIKA instrument]
7th run of NIKA2 (test): 6-December-2016 till 13-December-2016. Test DRO based external calibrator, continue NIKA2 commissioning. [= Run 20 of a NIKA instrument]
8th run of NIKA2 (test): 9-January-2017 to 13-January-2017, then 23-January to 27-January. Reverse array 1 lens to smooth version + adjust fixation of cold mirrors block (M7-M8) to get better radio alignment of the internal optics (degraded during run 5 intervention), short test on sky to see effect of the intervention. [= Run 21 of a NIKA instrument]
9th run of NIKA2 (test): 21-February-2017 to 28-February-2017. Resume NIKA2 commissioning after run 8 intervention. [= Run 22 of a NIKA instrument]
10th run of NIKA2 (test): 18-April-2017 to 25-April-2017. End of commissioning phase 1, science verification. [= Run 23 of a NIKA instrument]
Phase II (June, November 2017; March, June 2018)
11th run of NIKA2 (test): 8-June-2017 to 13-June-2017. Start commissioning phase 2: polarization. [= Run 24 of a NIKA instrument]
13th run of NIKA2 (test): 21-November-2017 to 28-November-2017. Continuation of commissioning in polarization mode. [= Run 26 of a NIKA instrument]
16th run of NIKA2 (test): 6 to 13-March-2018. Continuation of commissioning in polarization mode. [= Run 29 of a NIKA instrument]
- 12 to 17-June-2018. Continuation of commissioning in polarisation mode.
Support teams
- Overall coordinator:
Samuel Leclercq (IRAM/Grenoble, <leclercq@iram.fr>)
- NIKA2 team:
Alessandro Monfardini <monfardini@neel.cnrs.fr> (PI, IN)
Alain Benoit <alain.benoit@grenoble.cnrs.fr>
François-Xavier Désert <francois-xavier.desert@univ-grenoble-alpes.fr> (IPAG)
Martino Calvo <martino.calvo@neel.cnrs.fr> (IN)
Johannes Goupy <johannes.goupy@neel.cnrs.fr> (IN)
Nicolas Ponthieu <nicolas.ponthieu@univ-grenoble-alpes.fr> (IPAG)
Juan Macias-Perez <macias@lpsc.in2p3.fr> (LPSC)
Andrea Catalano <catalano@lpsc.in2p3.fr> (LPSC)
Laurence Perotto <laurence.perotto@lpsc.in2p3.fr> (LPSC)
- IRAM/Granada NIKA2 support team:
Carsten Kramer (30m Station Manager and Scheduler, <kramer@iram.es>)
Alessia Ritacco (commissioning of polarization capabilities, <ritaccoa@iram.es>)
Albrecht Sievers (IMBfits/Data, <sievers@iram.es>)
Hans Ungerechts (NCS/pako, <ungerechts@iram.es>)
Pablo Mellado, Francesco Pierfederici (Computers/Network, <mellado@iram.es>, <fpierfed@iram.es>)
Santiago Navarro, Dave John (Cryostat, <john@ira.es>, <navarro@iram.es>)
- IRAM/Grenoble NIKA2 support team:
Samuel Leclercq (Coordinator, Optics <leclercq@iram.fr>)
Robert Zylka (Data Processing Software, <zylka@iram.fr>)
Eduard Driessen (Detectors, <driessen@iram.fr>)
Created: 2015.AUG.05 by Israel Hermelo. This page is maintained by AR, SL, CK, and the NIKA2 team.