NIKA2 Homepage
The New IRAM KID Array 2 (NIKA2) is a dual-band camera operating with three frequency-multiplexed kilopixels arrays of Lumped Element Kinetic Inductance Detectors (LEKID) cooled at 150mK. NIKA2 is designed to observe simultaneously the intensity at 1.15 and 2.0 mm. In addition, it allows for polarisation observations at 1.15 mm. NIKA2 is built by an international consortium, led by the Institute Neel (Grenoble, France).
NIKA2 in the web:
Contents
NIKA2 Overview
Overview of NIKA2 capabilities
Open Time Programs
The five Guaranteed Time Large Programs
Listing of the Guaranteed Time Large Programs and abstracts
List of NIKA2 Publications
Technical Documentation
Cryostat & Electronics
- Network
- Acquisition and tuning
- Observations
Pool observations provides information on the observing modes offered for NIKA2 and examples of the scripts that you must prepare to observe your project.
Observing session provides an example of a typical session with NIKA2 at the 30m telescope.
Pointing sources and calibrators provides a list of pointing sources and calibrators.
- Data reduction
- IDL pipeline
Science runs (Oct-2017 - May-2018)
Accepted projects in open time and in guaranteed time.
See the progress of observations in the Pool data base and in TAPAS. Both databases are synchronized and can be used to write/read a logsheet.
24-31 October 2017 - s17 [= Cryo Run 25, 12th of NIKA2]
Day to day logbook : Scan types table, Pipeline RTA logbook (Quicklook plots table)
16-23 January 2018 - w17 Pool #1 [= Cryo Run 27, 14th of NIKA2]
Day to day logbook : Pipeline RTA logbook (Quicklook plots table)
Calibration : Calibration Observation Plan & Summary
13-20 February 2018 - w17 Pool #2 [= Cryo Run 28, 15th of NIKA2]
Day to day logbook : Pipeline RTA logbook (Quicklook plots table)
Calibration : Calibration Observation Plan & Summary
13-20 March 2018 - w17 Pool #3 [= Cryo Run 30, 17th of NIKA2]
Day to day logbook : Pipeline RTA logbook (Quicklook plots table)
Calibration : Calibration Observation Plan & Summary
22-29 May 2018 - w17 Night time Pool #4 [= Cryo Run 31, 18th of NIKA2]
Day to day logbook : Pipeline RTA logbook (Quicklook plots table)
Calibration : Calibration Observation Plan & Summary
Commissioning runs
Phase I (October 2015 - April 2017)
1st run of NIKA2 (test): 29-October-2015 till 10-November-2015. Installation, cool down at the 30m, testing/debugging/developing. [= Run 13 of a NIKA instrument]
2nd run of NIKA2 (test): 24-November-2015 till 02-December-2015. Continue tests started during run 1, in particular Beam maps and NEFD with the 13 NIKEL boards assembled the last days of run 1. [= Run 14 of a NIKA instrument]
3rd run of NIKA2 (test): 12-January-2016 till 01-February-2016. Implementation of new NIKEL boards; the 20 data lines of NIKA2 are foreseen to be plugged simultaneously. With the 3 arrays fully read, continue and redo tests started with runs 1 & 2, in particular Beam maps and NEFD. [= Run 15 of a NIKA instrument]
4th run of NIKA2 (test): 1-March-2016 till 15-March-2016. Continue tests started with previous runs, in particular investigate deeper beam patterns (XY focus, beam maps), synchronization, array 1 & 3 performances vs electronic boards, NEFD, mapping strategies. [= Run 16 of a NIKA instrument]
Dark run: 4-May-2016. Test sensitivity of NIKA2 to external electromagnetic perturbations, with the entrance window of the cryostat closed. [= Run 17 of a NIKA instrument]
5th run of NIKA2 (test): 16-September-2016 till 11-October-2016. Upgrade NIKA2 with new dichroic, new corrugated lenses and window, new 2mm array, new NIKEL boards (get the 20 lines with homogeneous electronics, v3); redo better the tests started with previous runs (mostly beam maps in best weather conditions, but also various types of scan to investigate deeper beams and noise, synchronization, NEFD, skydips, mapping strategies, possibly polarization. [= Run 18 of a NIKA instrument]
6th run of NIKA2 (test): 25-October-2016 till 1-November-2016. Continue NIKA2 commissioning. [= Run 19 of a NIKA instrument]
7th run of NIKA2 (test): 6-December-2016 till 13-December-2016. Test DRO based external calibrator, continue NIKA2 commissioning. [= Run 20 of a NIKA instrument]
8th run of NIKA2 (test): 9-January-2017 to 13-January-2017, then 23-January to 27-January. Reverse array 1 lens to smooth version + adjust fixation of cold mirrors block (M7-M8) to get better radio alignment of the internal optics (degraded during run 5 intervention), short test on sky to see effect of the intervention. [= Run 21 of a NIKA instrument]
9th run of NIKA2 (test): 21-February-2017 to 28-February-2017. Resume NIKA2 commissioning after run 8 intervention. [= Run 22 of a NIKA instrument]
10th run of NIKA2 (test): 18-April-2017 to 25-April-2017. End of commissioning phase 1, science verification. [= Run 23 of a NIKA instrument]
Phase II (June, November 2017; March, June 2018)
11th run of NIKA2 (test): 8-June-2017 to 13-June-2017. Start commissioning phase 2: polarization. [= Run 24 of a NIKA instrument]
13th run of NIKA2 (test): 21-November-2017 to 28-November-2017. Continuation of commissioning in polarization mode. [= Run 26 of a NIKA instrument]
16th run of NIKA2 (test): 6 to 13-March-2018. Continuation of commissioning in polarization mode. [= Run 29 of a NIKA instrument]
- 12 to 17-June-2018. Continuation of commissioning in polarisation mode.
Support teams
- Overall coordinator:
Samuel Leclercq (IRAM/Grenoble, <leclercq@iram.fr>)
- NIKA2 team:
Alessandro Monfardini <monfardini@neel.cnrs.fr> (PI, IN)
Alain Benoit <alain.benoit@grenoble.cnrs.fr>
François-Xavier Désert <francois-xavier.desert@univ-grenoble-alpes.fr> (IPAG)
Martino Calvo <martino.calvo@neel.cnrs.fr> (IN)
Johannes Goupy <johannes.goupy@neel.cnrs.fr> (IN)
Nicolas Ponthieu <nicolas.ponthieu@univ-grenoble-alpes.fr> (IPAG)
Juan Macias-Perez <macias@lpsc.in2p3.fr> (LPSC)
Andrea Catalano <catalano@lpsc.in2p3.fr> (LPSC)
Laurence Perotto <laurence.perotto@lpsc.in2p3.fr> (LPSC)
- IRAM/Granada NIKA2 support team:
Carsten Kramer (30m Station Manager and Scheduler, <kramer@iram.es>)
Alessia Ritacco (commissioning of polarization capabilities, <ritaccoa@iram.es>)
Albrecht Sievers (IMBfits/Data, <sievers@iram.es>)
Hans Ungerechts (NCS/pako, <ungerechts@iram.es>)
Pablo Mellado, Francesco Pierfederici (Computers/Network, <mellado@iram.es>, <fpierfed@iram.es>)
Santiago Navarro, Dave John (Cryostat, <john@ira.es>, <navarro@iram.es>)
- IRAM/Grenoble NIKA2 support team:
Samuel Leclercq (Coordinator, Optics <leclercq@iram.fr>)
Robert Zylka (Data Processing Software, <zylka@iram.fr>)
Eduard Driessen (Detectors, <driessen@iram.fr>)
Created: 2015.AUG.05 by Israel Hermelo. This page is maintained by AR, SL, CK, and the NIKA2 team.