Differences between revisions 115 and 123 (spanning 8 versions)
Revision 115 as of 2014-10-03 11:33:05
Size: 9430
Editor: gra-lx17
Comment:
Revision 123 as of 2015-02-26 17:56:08
Size: 9839
Editor: dhcp-185
Comment:
Deletions are marked like this. Additions are marked like this.
Line 24: Line 24:
{{attachment:GISMO_TRANSMISSION.png}} <<BR>> GISMO bandpass filter measured in the lab ([[attachment:GISMO_TRANSMISSION.txt | transmission function]] extracted from 2mm_BP_angles_Jul06.xls of J.Staguhn, 31-Oct-2013) {{attachment:GISMO_TRANSMISSION.png | GISMO transmission | width=950}}

GISMO bandpass filter measured in the lab ([[attachment:GISMO_TRANSMISSION.txt | transmission function]] extracted from 2mm_BP_angles_Jul06.xls of J.Staguhn, 31-Oct-2013)
Line 100: Line 102:
== 6th GISMO pool (October 2014) == == 7th GISMO pool (February/March 2015) ==
Line 102: Line 104:
The 6th GISMO pool will take place from the 21st to the 28th of October 2014. The 7th GISMO pool will take place from the 24th of February to the 3rd of March 2015.
Line 109: Line 111:
 * [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolOrganization/6thGISMOpool | 6th GISMO pool organization.]]  * [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolOrganization/7thGISMOpool | 7th GISMO pool organization.]]
Line 114: Line 116:
The progress of the 6th GISMO pool can be followed via: The progress of the 7th GISMO pool can be followed via:
Line 116: Line 118:
 * [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolLogs/7thGISMOpool | 7th GISMO pool daily logs.]]
Line 124: Line 127:
 * '''6th GISMO pool''' (October 2014)

  * [[http://www.iram.es/IRAMES/mainWiki/Continuum/PoolOrganization/6thGISMOpool | 6th GISMO pool organization.]]
Line 176: Line 182:
Author: Israel Hermelo (IRAM 30m Continuum Pool Manager) Author: Israel Hermelo ([[http://www.iram.es/IRAMES/mainWiki/Continuum/GISMO/Main|GISMO]] &[[http://www.iram.es/IRAMES/mainWiki/NIKA/Main|NIKA]] Pool Manager)
Line 180: Line 186:
Created: 2013.Oct.25 Created: 2013.OCT.25
Line 182: Line 188:
Last update: 2014.Sep.30 Last update: 2014.OCT.16

GISMO

The Goddard-IRAM Superconducting 2mm Observer (GISMO) is a bolometer camera for the IRAM 30m telescope. It has been build by Goddard Space Flight Center, in Greenbelt, Maryland under the lead of Johannes Staguhn.

Go to the Front Page


Overview

GISMO consists of 8x16 pixels with super conducting transition edge sensors (TES). The TES are read out by time domain SQUID multiplexers built at the National Institute for Standards (NIST), in Boulder, Colorado. The nominal bandwidth is centred at 2 mm (150 GHz). The is shown in Figure 1. Pixels are spaced by 13.75" and the telescope HPBW is 16.7". The sensitivity is about 14 mJy sqrt(sec) . The field-of-view is 1.8'x3.7' . Two standard observing modes are offered, Lissajous curves and on-the-fly scans. Both work in total power, without switching the secondary. An automated pipeline merges the GISMO data with the telescope data streams to create FITS files which are automatically processed by the reduction software crush to create logs, pointing results, and a first quick view of the data. Typical overheads for single science targets on the sky are 60%. The relative flux stability is about 8%. GISMO has been available to observers since the winter semester 2011/12.

Pixels

Wavelength

Bandwidth (FWHM)

Sensitivity (out of atmosphere)

HPBW

Field-of-View

Spacing

GISMO

8x16

2.0 mm

140-162 GHz

14 mJy*s1/2

16.7"

1.8' x 3.7'

13.75"

The quoted sensitivity is the median sensitivity of the crush default reduction using the data of the pool runs of April 2012 and 2013. See the reports of Bruni et al. 2012 and Hermelo et al. 2013 below.

GISMO transmission

GISMO bandpass filter measured in the lab (transmission function extracted from 2mm_BP_angles_Jul06.xls of J.Staguhn, 31-Oct-2013)

The Point Spread Function of GISMO can be downloaded from the CRUSH web site.


Call for proposals

GISMO is offered again to the community the winter semester 2013/14:


Documentation and Publications


Support teams


How-to's


7th GISMO pool (February/March 2015)

The 7th GISMO pool will take place from the 24th of February to the 3rd of March 2015. Observations will be carried from a dedicated pool account (Israel Hermelo will provide login information).

Pool projects and observers

For information about the accepted projects and the observers at the 30m please go to:

Progress

The progress of the 7th GISMO pool can be followed via:


Previous observing runs


Author: Israel Hermelo (GISMO &NIKA Pool Manager)

email: hermelo@iram.es

Created: 2013.OCT.25

Last update: 2014.OCT.16

Continuum/GISMO/Main (last edited 2015-02-26 17:56:08 by dhcp-185)