Differences between revisions 107 and 108
Revision 107 as of 2014-04-28 08:14:35
Size: 8871
Editor: gra-lx17
Comment:
Revision 108 as of 2014-04-28 08:39:13
Size: 8894
Editor: gra-lx17
Comment:
Deletions are marked like this. Additions are marked like this.
Line 91: Line 91:
 * [[https://mrt-lx1.iram.es/mainWiki/GismoInfo | GISMO recycling guide]] provides instructions for operators and !AoDs.  * [[https://mrt-lx1.iram.es/mainWiki/GismoInfo | GISMO recycling guide]] provides instructions for operators and !AoDs of the GISMO recycling.

GISMO

The Goddard-IRAM Superconducting 2mm Observer (GISMO) is a bolometer camera for the IRAM 30m telescope. It has been build by Goddard Space Flight Center, in Greenbelt, Maryland under the lead of Johannes Staguhn.

Go to the Front Page


Overview

GISMO consists of 8x16 pixels with super conducting transition edge sensors (TES). The TES are read out by time domain SQUID multiplexers built at the National Institute for Standards (NIST), in Boulder, Colorado. The nominal bandwidth is centred at 2 mm (150 GHz). The is shown in Figure 1. Pixels are spaced by 13.75" and the telescope HPBW is 16.7". The sensitivity is about 14 mJy sqrt(sec) . The field-of-view is 1.8'x3.7' . Two standard observing modes are offered, Lissajous curves and on-the-fly scans. Both work in total power, without switching the secondary. An automated pipeline merges the GISMO data with the telescope data streams to create FITS files which are automatically processed by the reduction software crush to create logs, pointing results, and a first quick view of the data. Typical overheads for single science targets on the sky are 60%. The relative flux stability is about 8%. GISMO has been available to observers since the winter semester 2011/12.

Pixels

Wavelength

Bandwidth (FWHM)

Sensitivity (out of atmosphere)

HPBW

Field-of-View

Spacing

GISMO

8x16

2.0 mm

140-162 GHz

14 mJy*s1/2

16.7"

1.8' x 3.7'

13.75"

The quoted sensitivity is the median sensitivity of the crush default reduction using the data of the pool runs of April 2012 and 2013. See the reports of Bruni et al. 2012 and Hermelo et al. 2013 below.

GISMO_TRANSMISSION.png
GISMO bandpass filter measured in the lab (transmission function extracted from 2mm_BP_angles_Jul06.xls of J.Staguhn, 31-Oct-2013)

The Point Spread Function of GISMO can be downloaded from the CRUSH web site.


Call for proposals

GISMO is offered again to the community the winter semester 2013/14:


Documentation and Publications


Support teams


How-to's

  • Pool Preparation provides information on the observing modes offered for the continuum cameras as well as examples of the scripts that you need to prepare to observe your project.

  • Observing Session provides an example of a typical session with the continuum cameras at the 30m telescope.

  • Pointing sources and calibrators provides a list of pointing sources and calibrators for the IRAM 30m continuum cameras.

  • Data Reduction provides some basic examples to reduce GISMO data using CRUSH. For more detail please see the CRUSH documentation.

  • GISMO recycling guide provides instructions for operators and AoDs of the GISMO recycling.


5th GISMO pool (April 2014)

The 5th GISMO pool will take place from the 1st to the 11th of April 2014. Observations will be carried from a dedicated pool account (Israel Hermelo will provide login information).

Pool projects and observers

For information about the accepted projects and the observers at the 30m please go to:

Progress

The progress of the 5th GISMO pool can be followed via:


Previous observing runs


Author: Israel Hermelo (IRAM 30m Continuum Pool Manager)

email: hermelo@iram.es

Created: 2013.Oct.25

Last update: 2014.Apr.28

Continuum/GISMO/Main (last edited 2015-02-26 17:56:08 by dhcp-185)